H Q Construction
- Based in
- Brisbane
- On San Francisco permits
- May 2019 to Nov 2020
- Last 24 months
- 0 permits filed
6 permits since 2000: 2 completed, 4 never finaled.
Of the 4 never-finaled permits, 4 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 1 completed, 1 never finaled. Typically 28 days from filing to permit and 247 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 15, 2019 | Completed final sign-off Aug 2020 | 1443 Shafter Av | complete kitchen remodel: new electrical, new plmg, nw drywall, nw cabinets, counters and appliances to be installed. partial wall removal per plans, sliding door to be added at rear and 1 window. extg door to be closed off.Details
complete kitchen remodel: new electrical, new plmg, nw drywall, nw cabinets, counters and appliances to be installed. partial wall removal per plans, sliding door to be added at rear and 1 window. extg door to be closed off. | $25,000 |
| Jun 26, 2019 | Never finaled issued Jun 2019, no final | 2030 Alemany Bl | remodel kitchen (120 sqft) & bathrooms (80 sqft) in kind. replace cabinets, patch drywall as necessary. tile floors and walls, replace vanity, toilet. remove/replace in kind damaged drywall throughout. electrical: add 90a/220v for kitchen, recessed lighting. new plumbing at kitchen. new split systemDetails
remodel kitchen (120 sqft) & bathrooms (80 sqft) in kind. replace cabinets, patch drywall as necessary. tile floors and walls, replace vanity, toilet. remove/replace in kind damaged drywall throughout. electrical: add 90a/220v for kitchen, recessed lighting. new plumbing at kitchen. new split system | $75,000 |