H M W Development Inc
- Based in
- Daly City
- On San Francisco permits
- Jul 2004 to Feb 2020
- Last 24 months
- 0 permits filed
41 permits since 2000: 37 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 8 completed. Typically 170 days from filing to permit and 448 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2020 | Completed final sign-off Jul 2021 | 209 Nevada St | gr fl - new master bedroom & bathroom, closets & laundry area; new interior stair from 1st to 2nd fl. 2nd fl - includes kitchen, bathroom, new doors & windows. new exterior landing less than 3' above grade. replace of treads, risers & railing @ front stairs. removal of exterior stair from rear deckDetails
gr fl - new master bedroom & bathroom, closets & laundry area; new interior stair from 1st to 2nd fl. 2nd fl - includes kitchen, bathroom, new doors & windows. new exterior landing less than 3' above grade. replace of treads, risers & railing @ front stairs. removal of exterior stair from rear deck | $115,164 |
| Nov 17, 2017 | Completed final sign-off Aug 2018 | 255 Vicente St | replacement of front stairs and supporting structure. new stair will include code upgrades to eliminate winders and correct handrail & guardrail height.Details
replacement of front stairs and supporting structure. new stair will include code upgrades to eliminate winders and correct handrail & guardrail height. | $20,000 |
| May 1, 2017 | Completed final sign-off May 2019 | 11 Los Palmos Dr | one story horizontal rear addition w/roof deck. new wood stairs to grade, 1st floor deck (+ 4'-o" above grade). ground flooor remodel. addition to include master bedroom w/bathroom & laundry.Details
one story horizontal rear addition w/roof deck. new wood stairs to grade, 1st floor deck (+ 4'-o" above grade). ground flooor remodel. addition to include master bedroom w/bathroom & laundry. | $57,205 |
| Apr 10, 2017 | Completed final sign-off Sep 2019 | 506 Molimo Dr | new decks @ basement, 1st & 2nd floors. new spiral stair from 1st floor deck to 2nd floor deck. new exterior stair from 1st floor deck to grade. interior remodel includes kitchen, 1st floor, hallway, rear window & door replacement. basement development for media room & powder room.Details
new decks @ basement, 1st & 2nd floors. new spiral stair from 1st floor deck to 2nd floor deck. new exterior stair from 1st floor deck to grade. interior remodel includes kitchen, 1st floor, hallway, rear window & door replacement. basement development for media room & powder room. | $125,000 |
| Feb 18, 2016 | Completed final sign-off Aug 2016 | 1081 De Haro St | replace (e) concrete step, landing and steel railing at front stairs. visible from street. less thn 50%Details
replace (e) concrete step, landing and steel railing at front stairs. visible from street. less thn 50% | $2,500 |
| Aug 24, 2015 | Completed final sign-off Oct 2017 | 1331 39th Av | vertical addition (n) 3rd story w/ master suite, office & laundry rm. 3rd fl to be set back 15' from 2nd fl front wall. kitchen & bathroom @ 2nd fl to be remodeled. add (n) interior stair & remove lightwell @ north side. ground fl to be developed for (n) family room & bathroom.Details
vertical addition (n) 3rd story w/ master suite, office & laundry rm. 3rd fl to be set back 15' from 2nd fl front wall. kitchen & bathroom @ 2nd fl to be remodeled. add (n) interior stair & remove lightwell @ north side. ground fl to be developed for (n) family room & bathroom. | $240,000 |
| Feb 5, 2015 | Completed final sign-off Apr 2016 | 531 Sanchez St | excavate +/- 1'6" at g/f for new bedroom, closet, bathroom & family room. add new interior stair. at 2/f, relocate/remodel kitchen & bathroom. replace windows throughout. street facing windows to be wood to match existing.Details
excavate +/- 1'6" at g/f for new bedroom, closet, bathroom & family room. add new interior stair. at 2/f, relocate/remodel kitchen & bathroom. replace windows throughout. street facing windows to be wood to match existing. | $133,000 |
| May 8, 2014 | Completed final sign-off May 2019 | 2237 Union St | horizontal addition & remodel. wk incl add elevator, rebuild in-kind previously (e) conical roof over (e)turret, repair/replace (e)siding, cornice & detail at front facade. horizontal addition at rear,(n)media room & bathroom at 1/fl, rebuild (e) int.stairs, new bathroom at 4/fl & new roof terrace.Details
horizontal addition & remodel. wk incl add elevator, rebuild in-kind previously (e) conical roof over (e)turret, repair/replace (e)siding, cornice & detail at front facade. horizontal addition at rear,(n)media room & bathroom at 1/fl, rebuild (e) int.stairs, new bathroom at 4/fl & new roof terrace. | $1,000,000 |