Back to kitchen remodel contractors
H M W Development Inc
- Based in
- Daly City
- On San Francisco permits
- Jul 2004 to Feb 2020
- Last 24 months
- 0 permits filed
41 permits since 2000: 37 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 8 completed, 2 expired or cancelled. Typically 170 days from filing to permit and 510 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2020 | Completed final sign-off Jul 2021 | 209 Nevada St | gr fl - new master bedroom & bathroom, closets & laundry area; new interior stair from 1st to 2nd fl. 2nd fl - includes kitchen, bathroom, new doors & windows. new exterior landing less than 3' above grade. replace of treads, risers & railing @ front stairs. removal of exterior stair from rear deckDetails
gr fl - new master bedroom & bathroom, closets & laundry area; new interior stair from 1st to 2nd fl. 2nd fl - includes kitchen, bathroom, new doors & windows. new exterior landing less than 3' above grade. replace of treads, risers & railing @ front stairs. removal of exterior stair from rear deck | $115,164 |
| Aug 9, 2017 | Expired or cancelled cancelled Jan 2026 | 175 Francisco St | #20: remodel (e) two bathrooms and kitchen on top 2 floors, 3rd and 4th .Details
#20: remodel (e) two bathrooms and kitchen on top 2 floors, 3rd and 4th . | $60,000 |
| Aug 1, 2017 | Expired or cancelled cancelled Jan 2026 | 175 Francisco St | demo existing 3/f & 4/f (e) kitchen & (e) bathrooms.Details
demo existing 3/f & 4/f (e) kitchen & (e) bathrooms. | $5,000 |
| Apr 10, 2017 | Completed final sign-off Sep 2019 | 506 Molimo Dr | new decks @ basement, 1st & 2nd floors. new spiral stair from 1st floor deck to 2nd floor deck. new exterior stair from 1st floor deck to grade. interior remodel includes kitchen, 1st floor, hallway, rear window & door replacement. basement development for media room & powder room.Details
new decks @ basement, 1st & 2nd floors. new spiral stair from 1st floor deck to 2nd floor deck. new exterior stair from 1st floor deck to grade. interior remodel includes kitchen, 1st floor, hallway, rear window & door replacement. basement development for media room & powder room. | $125,000 |
| Aug 24, 2015 | Completed final sign-off Oct 2017 | 1331 39th Av | vertical addition (n) 3rd story w/ master suite, office & laundry rm. 3rd fl to be set back 15' from 2nd fl front wall. kitchen & bathroom @ 2nd fl to be remodeled. add (n) interior stair & remove lightwell @ north side. ground fl to be developed for (n) family room & bathroom.Details
vertical addition (n) 3rd story w/ master suite, office & laundry rm. 3rd fl to be set back 15' from 2nd fl front wall. kitchen & bathroom @ 2nd fl to be remodeled. add (n) interior stair & remove lightwell @ north side. ground fl to be developed for (n) family room & bathroom. | $240,000 |
| Aug 20, 2015 | Completed final sign-off Apr 2018 | 199 Caselli Av | add roof dormers at west & east elevations. extend 3/fl toward rear yard to align with 2/fl rear wall. add deck at rear yard & side yard. interior improvements include new bathroom & laundry closet at 3/fl, and remodeled kitchen & bathroom at 2nd floor.Details
add roof dormers at west & east elevations. extend 3/fl toward rear yard to align with 2/fl rear wall. add deck at rear yard & side yard. interior improvements include new bathroom & laundry closet at 3/fl, and remodeled kitchen & bathroom at 2nd floor. | $145,000 |
| Feb 5, 2015 | Completed final sign-off Apr 2016 | 531 Sanchez St | excavate +/- 1'6" at g/f for new bedroom, closet, bathroom & family room. add new interior stair. at 2/f, relocate/remodel kitchen & bathroom. replace windows throughout. street facing windows to be wood to match existing.Details
excavate +/- 1'6" at g/f for new bedroom, closet, bathroom & family room. add new interior stair. at 2/f, relocate/remodel kitchen & bathroom. replace windows throughout. street facing windows to be wood to match existing. | $133,000 |
| Oct 14, 2014 | Completed final sign-off Jun 2015 | 345 Hazelwood Av | develop ground floor for new bedroom, family room, bathroom, laundry room, and storage area. new residential passenger elevator to be added. work at the 2nd flr includes kitchen remodel.Details
develop ground floor for new bedroom, family room, bathroom, laundry room, and storage area. new residential passenger elevator to be added. work at the 2nd flr includes kitchen remodel. | $162,619 |
| Mar 6, 2014 | Completed final sign-off Aug 2014 | 428 Molimo Dr | infill existing lightwell & remodle kitchen, add new skylight.Details
infill existing lightwell & remodle kitchen, add new skylight. | $25,000 |
| Jul 7, 2004 | Completed final sign-off Jul 2007 | 1262 Plymouth Av | 2 story +addition @ rear including master bedroom,closet & m. bath (2/f), kitchen & porch (1/f).Details
2 story +addition @ rear including master bedroom,closet & m. bath (2/f), kitchen & porch (1/f). | $130,000 |