H M W Development Inc
- Based in
- Daly City
- On San Francisco permits
- Jul 2004 to Feb 2020
- Last 24 months
- 0 permits filed
41 permits since 2000: 37 completed, 1 never finaled, 3 expired or cancelled.
Of the 1 never-finaled permit, 1 is 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
7 deck permits: 7 completed. Typically 146 days from filing to permit and 382 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 7, 2020 | Completed final sign-off Jul 2021 | 209 Nevada St | gr fl - new master bedroom & bathroom, closets & laundry area; new interior stair from 1st to 2nd fl. 2nd fl - includes kitchen, bathroom, new doors & windows. new exterior landing less than 3' above grade. replace of treads, risers & railing @ front stairs. removal of exterior stair from rear deckDetails
gr fl - new master bedroom & bathroom, closets & laundry area; new interior stair from 1st to 2nd fl. 2nd fl - includes kitchen, bathroom, new doors & windows. new exterior landing less than 3' above grade. replace of treads, risers & railing @ front stairs. removal of exterior stair from rear deck | $115,164 |
| May 1, 2017 | Completed final sign-off May 2019 | 11 Los Palmos Dr | one story horizontal rear addition w/roof deck. new wood stairs to grade, 1st floor deck (+ 4'-o" above grade). ground flooor remodel. addition to include master bedroom w/bathroom & laundry.Details
one story horizontal rear addition w/roof deck. new wood stairs to grade, 1st floor deck (+ 4'-o" above grade). ground flooor remodel. addition to include master bedroom w/bathroom & laundry. | $57,205 |
| Apr 10, 2017 | Completed final sign-off Sep 2019 | 506 Molimo Dr | new decks @ basement, 1st & 2nd floors. new spiral stair from 1st floor deck to 2nd floor deck. new exterior stair from 1st floor deck to grade. interior remodel includes kitchen, 1st floor, hallway, rear window & door replacement. basement development for media room & powder room.Details
new decks @ basement, 1st & 2nd floors. new spiral stair from 1st floor deck to 2nd floor deck. new exterior stair from 1st floor deck to grade. interior remodel includes kitchen, 1st floor, hallway, rear window & door replacement. basement development for media room & powder room. | $125,000 |
| Sep 30, 2016 | Completed final sign-off Oct 2017 | 56 Robblee Av | legalize addition of family room, bedroom, mud room, full bathroom and deck on 1st floor. deck is 12 ft x 19' 6" approx 4' above gradeDetails
legalize addition of family room, bedroom, mud room, full bathroom and deck on 1st floor. deck is 12 ft x 19' 6" approx 4' above grade | $50,000 |
| Aug 20, 2015 | Completed final sign-off Apr 2018 | 199 Caselli Av | add roof dormers at west & east elevations. extend 3/fl toward rear yard to align with 2/fl rear wall. add deck at rear yard & side yard. interior improvements include new bathroom & laundry closet at 3/fl, and remodeled kitchen & bathroom at 2nd floor.Details
add roof dormers at west & east elevations. extend 3/fl toward rear yard to align with 2/fl rear wall. add deck at rear yard & side yard. interior improvements include new bathroom & laundry closet at 3/fl, and remodeled kitchen & bathroom at 2nd floor. | $145,000 |
| Jul 29, 2013 | Completed final sign-off Feb 2014 | 124 Stanford Heights Av | develop ground floor with new family room and bathroom. extg deck to remain but add new decking. extg joists and vertical supports to remain.Details
develop ground floor with new family room and bathroom. extg deck to remain but add new decking. extg joists and vertical supports to remain. | $50,000 |
| Jun 25, 2013 | Completed final sign-off Oct 2013 | 203 Marietta Dr | revision to pa# 2010.06.28.5436: deck repair - replace beam & replace (e) posts & footings.Details
revision to pa# 2010.06.28.5436: deck repair - replace beam & replace (e) posts & footings. | $3,000 |