Back to bathroom remodel contractors
Grey-Design And Build
- Based in
- San Francisco
- On San Francisco permits
- Aug 2009 to Nov 2013
- Last 24 months
- 0 permits filed
12 permits since 2000: 10 completed, 1 never finaled, 1 expired or cancelled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
6 bathroom remodel permits: 6 completed. Typically 10 days from filing to permit and 214 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2013 | Completed final sign-off Mar 2014 | 1314 35th Av | 1st floor interior remodel-open up entry, relocate bathroom, create family woom, new doors & windowsDetails
1st floor interior remodel-open up entry, relocate bathroom, create family woom, new doors & windows | $47,000 |
| Apr 26, 2013 | Completed final sign-off Aug 2013 | 232 30th Av | convert kitchen pantry to half-bath; add rear yard deckDetails
convert kitchen pantry to half-bath; add rear yard deck | $25,000 |
| May 16, 2011 | Completed final sign-off Aug 2012 | 210 Mallorca Wy | remove unpermitted in law unit & replace with master bedroom. remodel (e) kitchen & bathrooms. build new internal staircase, new roof deck. replace front facade aluminum windows with double hungDetails
remove unpermitted in law unit & replace with master bedroom. remodel (e) kitchen & bathrooms. build new internal staircase, new roof deck. replace front facade aluminum windows with double hung | $300,000 |
| Jun 9, 2010 | Completed final sign-off Jun 2010 | 245 Hoffman Av | permit revision to pa 200910209374 for reduction in scope of work, eliminate 2 skylights at (n) master bathDetails
permit revision to pa 200910209374 for reduction in scope of work, eliminate 2 skylights at (n) master bath | |
| Jan 25, 2010 | Completed final sign-off Jan 2011 | 525 29th St | remodel upstairs bathroom, re-tile & replace toilet down stairsDetails
remodel upstairs bathroom, re-tile & replace toilet down stairs | $25,000 |
| Oct 20, 2009 | Completed final sign-off Jun 2010 | 245 Hoffman Av | second fl: demo (e) bath and non structural wall. convert (e) bath to bedroom. create new full bath. install new lighting. install 2 new skylights over new bathroom. basement: legalize full bathroom.Details
second fl: demo (e) bath and non structural wall. convert (e) bath to bedroom. create new full bath. install new lighting. install 2 new skylights over new bathroom. basement: legalize full bathroom. | $28,000 |