Block 1389, lot 027
232 30th Ave
- City’s use
- Single Family Residential
- Built
- 1920
- Stories
- 3
- Units
- 1
- Rooms
- 5 bedrooms, 3 bathrooms
- Building
- 2,742 sq ft
- Lot
- 3,000 sq ft
- Zoning
- RH1
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
5 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 26, 2013 | Completed final sign-off Aug 2013 | 232 30th Av | Grey-Design And Build | convert kitchen pantry to half-bath; add rear yard deckDetails
convert kitchen pantry to half-bath; add rear yard deck | $25,000 |
| Sep 7, 2006 | Completed final sign-off Jan 2007 | 232 30th Av | new roofing at existing built up roof. new composition shingle roofing at new sloped roof. replace exg coimp shingle roofing with new composition shingle roofing. replace exg wood sidig with new stucco at top floor. no other work. this permit replaces 200607035619Details
new roofing at existing built up roof. new composition shingle roofing at new sloped roof. replace exg coimp shingle roofing with new composition shingle roofing. replace exg wood sidig with new stucco at top floor. no other work. this permit replaces 200607035619 | ||
| Jul 3, 2006 | Completed final sign-off Jan 2007 | 232 30th Av | new roofing at (e) built-up roof, new spanish tile at new sloped roof. replace exg wood siding w/ new stucco at r top floor closet. no other work.Details
new roofing at (e) built-up roof, new spanish tile at new sloped roof. replace exg wood siding w/ new stucco at r top floor closet. no other work. | $25,000 | |
| Oct 25, 2005 | Expired or cancelled expired Jan 2007 | 232 30th Av | add new half bath to ground flr- expand exg bathroom at top floor. add new structural support at basement. add new lighting & windows. partial reroofing. no change to building envelope size.Details
add new half bath to ground flr- expand exg bathroom at top floor. add new structural support at basement. add new lighting & windows. partial reroofing. no change to building envelope size. | $95,000 | |
| Sep 12, 2005 | Completed final sign-off Nov 2005 | 232 30th Av | Cepheus Builders Inc | nea bathroom, enlarge 2 closets, built in shelves, new closet all on 2nd floorDetails
nea bathroom, enlarge 2 closets, built in shelves, new closet all on 2nd floor | $68,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Cepheus Builders Inc, Grey-Design And Build
- Architects
- John Connell (2)
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.