Greatwall Building Construction Inc
- Based in
- San Carlos
- On San Francisco permits
- May 2006 to Feb 2026
- Last 24 months
- 5 permits filed
62 permits since 2000: 55 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
4 stairs permits: 4 completed. Typically 0 days from filing to permit and 216 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Aug 8, 2020 | Completed final sign-off Mar 2025 | 14 University St | develop new adu per ordinance 95-17 on 1st floor with 7'10" 1st floor rear addition, 216 sf. existing 2nd floor dwelling unit renovation with new 1st floor roof deck and stair to yard.Details
develop new adu per ordinance 95-17 on 1st floor with 7'10" 1st floor rear addition, 216 sf. existing 2nd floor dwelling unit renovation with new 1st floor roof deck and stair to yard. | $200,000 |
| Aug 16, 2012 | Completed final sign-off Sep 2012 | 632 Balboa St | repair/replace dryrot at rear stairs & landing, less than 50%.Details
repair/replace dryrot at rear stairs & landing, less than 50%. | $10,000 |
| Jul 26, 2012 | Completed final sign-off Nov 2012 | 223 Vernon St | remodel kitchen and bathroom on 2nd floor. legalize bedroom, built new bath and family room on first floor. convert storage to one bedroom at basement. repair rear stairs.Details
remodel kitchen and bathroom on 2nd floor. legalize bedroom, built new bath and family room on first floor. convert storage to one bedroom at basement. repair rear stairs. | $35,000 |
| Mar 28, 2007 | Completed final sign-off Feb 2008 | 820 Cayuga Av | enclose (e) lightwell on the 2nd floor, install (n) skylights, remodel (e0 1st floor habitable space, relocate (e) washer, dryer, furnace, hot water heater, relocate 9e) interior stair, replace 9e) windows to double-glazed windows.Details
enclose (e) lightwell on the 2nd floor, install (n) skylights, remodel (e0 1st floor habitable space, relocate (e) washer, dryer, furnace, hot water heater, relocate 9e) interior stair, replace 9e) windows to double-glazed windows. | $100,000 |