Back to bathroom remodel contractors
Greatwall Building Construction Inc
- Based in
- San Carlos
- On San Francisco permits
- May 2006 to Feb 2026
- Last 24 months
- 5 permits filed
62 permits since 2000: 55 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
19 bathroom remodel permits: 17 completed, 1 in progress, 1 expired or cancelled. Typically 13 days from filing to permit and 141 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2026 | In progress issued Apr 2026 | 84 Goettingen St | construct 2 bedroom, 2 full bath, family room, media room, & install wetbar. all work on g/f.Details
construct 2 bedroom, 2 full bath, family room, media room, & install wetbar. all work on g/f. | $183,000 |
| Mar 20, 2025 | Completed final sign-off Mar 2026 | 3923 Irving St | to comply w/ novs 202071281&201216061. remove fire damaged rear sunroom & vacant com. kitchen area. replace (e) ftg at rear wall & int. remodel of 2f sfd including baths & kitchen. replace (e) 3923 water supply line, damaged sewer line, window. modify front side entry; ada restroom @ 3925 missionDetails
to comply w/ novs 202071281&201216061. remove fire damaged rear sunroom & vacant com. kitchen area. replace (e) ftg at rear wall & int. remodel of 2f sfd including baths & kitchen. replace (e) 3923 water supply line, damaged sewer line, window. modify front side entry; ada restroom @ 3925 mission | $80,000 |
| Nov 22, 2021 | Completed final sign-off May 2024 | 215 Moscow St | construct 2 bedroom, 1 full bath, & media room at ground floor.Details
construct 2 bedroom, 1 full bath, & media room at ground floor. | $72,000 |
| Aug 4, 2020 | Completed final sign-off Jan 2021 | 2566 46th Av | remodel exist. storage room (156 sq. ft. area) on the first floor. add one full bathDetails
remodel exist. storage room (156 sq. ft. area) on the first floor. add one full bath | $50,000 |
| Jul 29, 2016 | Completed final sign-off Jul 2017 | 309 San Marcos Av | interior remodel of exist. kitchen and baths. remove wall at kitchenDetails
interior remodel of exist. kitchen and baths. remove wall at kitchen | $30,000 |
| Apr 30, 2015 | Completed final sign-off Nov 2015 | 1307 Cayuga Av | remodel second floor to add 1/2 bath, relocate kitchen, remodel bathroom. ground floor: convert exist. storage to create bedroom and bath.(new window on side elevation shall wood frame).Details
remodel second floor to add 1/2 bath, relocate kitchen, remodel bathroom. ground floor: convert exist. storage to create bedroom and bath.(new window on side elevation shall wood frame). | $65,000 |
| Apr 7, 2015 | Completed final sign-off Dec 2015 | 3625 Sacramento St | interior remodel: drywall, paint, bathroom renovation, lights & fixture installation, install lights. comply with nov # 201538371Details
interior remodel: drywall, paint, bathroom renovation, lights & fixture installation, install lights. comply with nov # 201538371 | $40,000 |
| Apr 2, 2015 | Completed final sign-off Jun 2015 | 1497 Palou Av | remodel two (2) baths, replace kitchen cabinet & countertop.Details
remodel two (2) baths, replace kitchen cabinet & countertop. | $20,000 |
| Mar 24, 2015 | Completed final sign-off May 2017 | 3064 Sacramento St | unit #2: remodel of (e) 1st floor unit extension of (e) unit into storage area, new partitions, add new bathroom and w/d area. new lighting, elect, bath & kitchenDetails
unit #2: remodel of (e) 1st floor unit extension of (e) unit into storage area, new partitions, add new bathroom and w/d area. new lighting, elect, bath & kitchen | $150,000 |
| Aug 26, 2014 | Completed final sign-off Nov 2014 | 1350 32nd Av | remodel second floor bathroom. convert existing closet to full bathDetails
remodel second floor bathroom. convert existing closet to full bath | $20,000 |
| Feb 28, 2013 | Completed final sign-off May 2013 | 67 Sunview Dr | upgrade electrical wire & 100 amp service. replace furnace. replace counter-top & cabinet in kitchen, bathroom remodel. no structural work.Details
upgrade electrical wire & 100 amp service. replace furnace. replace counter-top & cabinet in kitchen, bathroom remodel. no structural work. | $20,000 |
| Sep 24, 2012 | Completed final sign-off Jan 2013 | 334 Ralston St | remodel on 2nd floor - add one bathroom, convert dining to bedroom. remove wall at kitchen, remodel kitchen.Details
remodel on 2nd floor - add one bathroom, convert dining to bedroom. remove wall at kitchen, remodel kitchen. | $30,000 |
| Jul 26, 2012 | Completed final sign-off Nov 2012 | 223 Vernon St | remodel kitchen and bathroom on 2nd floor. legalize bedroom, built new bath and family room on first floor. convert storage to one bedroom at basement. repair rear stairs.Details
remodel kitchen and bathroom on 2nd floor. legalize bedroom, built new bath and family room on first floor. convert storage to one bedroom at basement. repair rear stairs. | $35,000 |
| Apr 24, 2012 | Completed final sign-off Nov 2012 | 260 08th Av | remodel bathrooms on 2nd floor, relocate kitchen in both units. add one master bath on third floor. remove portion of load bearing wall on third floor. replace windowsw in kind (19 each on 2nd floor and 3rd floor), in the rear of units, not visible from the street.Details
remodel bathrooms on 2nd floor, relocate kitchen in both units. add one master bath on third floor. remove portion of load bearing wall on third floor. replace windowsw in kind (19 each on 2nd floor and 3rd floor), in the rear of units, not visible from the street. | $68,000 |
| Jun 21, 2011 | Completed final sign-off Nov 2011 | 334 Ralston St | construct one new full bath room, one bed room, laundry room and legalize one extg bed room. all work at ground floor.Details
construct one new full bath room, one bed room, laundry room and legalize one extg bed room. all work at ground floor. | $28,000 |
| Oct 29, 2010 | Completed final sign-off Mar 2011 | 500 Thornton Av | remodel gr fl. add family room, full bath, storage, legalize toilet at laundry areaDetails
remodel gr fl. add family room, full bath, storage, legalize toilet at laundry area | $25,000 |
| Oct 22, 2010 | Completed final sign-off Dec 2011 | 284 Lee Av | new fence - one -hr fire wall at property line, 9'-0" high to comply with nov# 200119252, removed enclosure at driveway. remodel one (e) bath rm & add one new bath.Details
new fence - one -hr fire wall at property line, 9'-0" high to comply with nov# 200119252, removed enclosure at driveway. remodel one (e) bath rm & add one new bath. | $25,000 |
| Mar 26, 2009 | Completed final sign-off Jun 2009 | 21 Shawnee Av | ground floor remodel to convert storage to (1) bedroom, family & add (1) full bath and new window and doors.Details
ground floor remodel to convert storage to (1) bedroom, family & add (1) full bath and new window and doors. | $35,000 |
| Jun 23, 2008 | Expired or cancelled expired Feb 2009 | 140 Manor Dr | 1 bathroom remodel & 1/2 bath @ kitchen. wiring upgrade through out house. replace (e) windows @ rear 4 in total. replacement in kind. no change door or exiting changes.Details
1 bathroom remodel & 1/2 bath @ kitchen. wiring upgrade through out house. replace (e) windows @ rear 4 in total. replacement in kind. no change door or exiting changes. | $15,000 |