Back to kitchen remodel contractors
Greatwall Building Construction Inc
- Based in
- San Carlos
- On San Francisco permits
- May 2006 to Feb 2026
- Last 24 months
- 5 permits filed
62 permits since 2000: 55 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 1 is 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
17 kitchen remodel permits: 15 completed, 2 expired or cancelled. Typically 13 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 1, 2025 | Completed final sign-off Jun 2025 | 334 Ralston St | add in kitchen with 2 stove burner in 1st floor space. 1st floor space and permited with bpa #201106218553. convert bedroom to dining room. new opening from dining room to kitchenDetails
add in kitchen with 2 stove burner in 1st floor space. 1st floor space and permited with bpa #201106218553. convert bedroom to dining room. new opening from dining room to kitchen | $2,000 |
| Mar 31, 2025 | Completed final sign-off Jun 2025 | 223 Vernon St | add in kitchen stove (2 burner stove) on 1st flooor space. ref#: 201207265811. no plumbing fixtures added in.Details
add in kitchen stove (2 burner stove) on 1st flooor space. ref#: 201207265811. no plumbing fixtures added in. | $2,000 |
| Mar 20, 2025 | Completed final sign-off Mar 2026 | 3923 Irving St | to comply w/ novs 202071281&201216061. remove fire damaged rear sunroom & vacant com. kitchen area. replace (e) ftg at rear wall & int. remodel of 2f sfd including baths & kitchen. replace (e) 3923 water supply line, damaged sewer line, window. modify front side entry; ada restroom @ 3925 missionDetails
to comply w/ novs 202071281&201216061. remove fire damaged rear sunroom & vacant com. kitchen area. replace (e) ftg at rear wall & int. remodel of 2f sfd including baths & kitchen. replace (e) 3923 water supply line, damaged sewer line, window. modify front side entry; ada restroom @ 3925 mission | $80,000 |
| Jul 29, 2016 | Completed final sign-off Jul 2017 | 309 San Marcos Av | interior remodel of exist. kitchen and baths. remove wall at kitchenDetails
interior remodel of exist. kitchen and baths. remove wall at kitchen | $30,000 |
| Jan 13, 2016 | Completed final sign-off Apr 2016 | 402 Jackson St | the project involves converting an extg office on the 2nd floor to a kitchenette with new sink, dw, & ref. at 3rd floor an extg kitchenette will be remodeled and enlarged with the addition of an adjacent closet. n/a for maher.Details
the project involves converting an extg office on the 2nd floor to a kitchenette with new sink, dw, & ref. at 3rd floor an extg kitchenette will be remodeled and enlarged with the addition of an adjacent closet. n/a for maher. | $28,750 |
| Apr 30, 2015 | Completed final sign-off Nov 2015 | 1307 Cayuga Av | remodel second floor to add 1/2 bath, relocate kitchen, remodel bathroom. ground floor: convert exist. storage to create bedroom and bath.(new window on side elevation shall wood frame).Details
remodel second floor to add 1/2 bath, relocate kitchen, remodel bathroom. ground floor: convert exist. storage to create bedroom and bath.(new window on side elevation shall wood frame). | $65,000 |
| Apr 2, 2015 | Completed final sign-off Jun 2015 | 1497 Palou Av | remodel two (2) baths, replace kitchen cabinet & countertop.Details
remodel two (2) baths, replace kitchen cabinet & countertop. | $20,000 |
| Mar 24, 2015 | Completed final sign-off May 2017 | 3064 Sacramento St | unit #2: remodel of (e) 1st floor unit extension of (e) unit into storage area, new partitions, add new bathroom and w/d area. new lighting, elect, bath & kitchenDetails
unit #2: remodel of (e) 1st floor unit extension of (e) unit into storage area, new partitions, add new bathroom and w/d area. new lighting, elect, bath & kitchen | $150,000 |
| May 16, 2013 | Completed final sign-off Jul 2013 | 1874 32nd Av | remodel kitchen, replace flooring, counter, cabinets.Details
remodel kitchen, replace flooring, counter, cabinets. | $10,000 |
| Feb 28, 2013 | Completed final sign-off May 2013 | 67 Sunview Dr | upgrade electrical wire & 100 amp service. replace furnace. replace counter-top & cabinet in kitchen, bathroom remodel. no structural work.Details
upgrade electrical wire & 100 amp service. replace furnace. replace counter-top & cabinet in kitchen, bathroom remodel. no structural work. | $20,000 |
| Oct 26, 2012 | Completed final sign-off Dec 2012 | 235 Waller St | unit #6 -remove one non-structural partition at kitchen. remodel kitchen.Details
unit #6 -remove one non-structural partition at kitchen. remodel kitchen. | $10,000 |
| Sep 24, 2012 | Completed final sign-off Jan 2013 | 334 Ralston St | remodel on 2nd floor - add one bathroom, convert dining to bedroom. remove wall at kitchen, remodel kitchen.Details
remodel on 2nd floor - add one bathroom, convert dining to bedroom. remove wall at kitchen, remodel kitchen. | $30,000 |
| Sep 11, 2012 | Completed final sign-off Nov 2013 | 2809 San Bruno Av | revision to appl #2007.0518.1706: relocate kitchen & add window to 3rd floor kitchen, add laundry to 3rd floor. relocate toilet on ground floor.Details
revision to appl #2007.0518.1706: relocate kitchen & add window to 3rd floor kitchen, add laundry to 3rd floor. relocate toilet on ground floor. | $3,000 |
| Jul 26, 2012 | Completed final sign-off Nov 2012 | 223 Vernon St | remodel kitchen and bathroom on 2nd floor. legalize bedroom, built new bath and family room on first floor. convert storage to one bedroom at basement. repair rear stairs.Details
remodel kitchen and bathroom on 2nd floor. legalize bedroom, built new bath and family room on first floor. convert storage to one bedroom at basement. repair rear stairs. | $35,000 |
| Apr 24, 2012 | Completed final sign-off Nov 2012 | 260 08th Av | remodel bathrooms on 2nd floor, relocate kitchen in both units. add one master bath on third floor. remove portion of load bearing wall on third floor. replace windowsw in kind (19 each on 2nd floor and 3rd floor), in the rear of units, not visible from the street.Details
remodel bathrooms on 2nd floor, relocate kitchen in both units. add one master bath on third floor. remove portion of load bearing wall on third floor. replace windowsw in kind (19 each on 2nd floor and 3rd floor), in the rear of units, not visible from the street. | $68,000 |
| Jun 23, 2008 | Expired or cancelled expired Feb 2009 | 140 Manor Dr | 1 bathroom remodel & 1/2 bath @ kitchen. wiring upgrade through out house. replace (e) windows @ rear 4 in total. replacement in kind. no change door or exiting changes.Details
1 bathroom remodel & 1/2 bath @ kitchen. wiring upgrade through out house. replace (e) windows @ rear 4 in total. replacement in kind. no change door or exiting changes. | $15,000 |
| May 28, 2008 | Expired or cancelled expired Mar 2009 | 140 Manor Dr | install lighting & gfci in kitchen. install cabinet & counter-top. upgrade electrical panel to 100 amp. interior & exterior painting. lighting to comply w/ t-24.Details
install lighting & gfci in kitchen. install cabinet & counter-top. upgrade electrical panel to 100 amp. interior & exterior painting. lighting to comply w/ t-24. | $17,000 |