Back to kitchen remodel contractors
Graham Construction
- Based in
- San Frnacisco
- On San Francisco permits
- Jan 2015 to Oct 2019
- Last 24 months
- 0 permits filed
22 permits since 2000: 18 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 127 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2019 | Completed final sign-off May 2020 | 1524 Leavenworth St | interior remodel only. 1)remodel extg bathrooms, 2)nw electrical throughout. 3)relocate and remodel extg kitchen, 4) reconfigure bedroom layout. 5)add laundry closet, 6) add 1.5 bathrooms. structural work undedr seperate permit #201910094647. plmg/elect work under seperate permit.Details
interior remodel only. 1)remodel extg bathrooms, 2)nw electrical throughout. 3)relocate and remodel extg kitchen, 4) reconfigure bedroom layout. 5)add laundry closet, 6) add 1.5 bathrooms. structural work undedr seperate permit #201910094647. plmg/elect work under seperate permit. | $80,000 |
| Aug 2, 2019 | Completed final sign-off May 2020 | 1524 Leavenworth St | remodel 2 kitchens, 4 full bathrooms & 2 half baths. add new forced air heating, new electrical & plumbing. no walls to be altered or removed.Details
remodel 2 kitchens, 4 full bathrooms & 2 half baths. add new forced air heating, new electrical & plumbing. no walls to be altered or removed. | $150,000 |
| Aug 28, 2018 | Never finaled issued Oct 2018, no final | 631 Mangels Av | kitchen renovation. demo interior walls. 1st fl - add bathroom, master bedroom and living room. add interior wallsDetails
kitchen renovation. demo interior walls. 1st fl - add bathroom, master bedroom and living room. add interior walls | $150,000 |
| May 10, 2018 | Completed final sign-off Sep 2018 | 870 32nd Av | remove bearing walls in kitchen & install beams. remodel kitchenDetails
remove bearing walls in kitchen & install beams. remodel kitchen | $45,000 |
| Mar 10, 2016 | Completed final sign-off Jul 2016 | 4135 23rd St | replacement of existing kitchen cabinets, lighting & electrical, replacement of existing interior handrails & guardrails. relocating door in existing bathroom, paint througout.Details
replacement of existing kitchen cabinets, lighting & electrical, replacement of existing interior handrails & guardrails. relocating door in existing bathroom, paint througout. | $55,000 |
| Jul 14, 2015 | Completed final sign-off Nov 2015 | 1701 Broadway | replace all cabinets, appliances in kitchen, replace fixtures and finishes in masterbath. replace fixtures and finishes in guest bath. replace one window with awning window in guest bath in rear of bldg. no walls to be altered or removed. n/a for the maher ordinance.Details
replace all cabinets, appliances in kitchen, replace fixtures and finishes in masterbath. replace fixtures and finishes in guest bath. replace one window with awning window in guest bath in rear of bldg. no walls to be altered or removed. n/a for the maher ordinance. | $80,000 |
| Feb 3, 2015 | Completed final sign-off May 2015 | 3679 Sacramento St | replace kitchen cabinets & counter tops in kind. refinish hardwood floors throughout. replace 4 aluminum windows in the rear of the bldg in kind. paint throughout. no walls to be altered or removed.Details
replace kitchen cabinets & counter tops in kind. refinish hardwood floors throughout. replace 4 aluminum windows in the rear of the bldg in kind. paint throughout. no walls to be altered or removed. | $30,000 |
| Jan 27, 2015 | Completed final sign-off Apr 2015 | 4 Topaz Wy | replace kitchen cabinets in kind. install new cork flooring in kitchen and dining room. relocate (e) electrical panel from closet to hallway. paint througout kitchen and dining room. to comply with cec150.0(k)3Details
replace kitchen cabinets in kind. install new cork flooring in kitchen and dining room. relocate (e) electrical panel from closet to hallway. paint througout kitchen and dining room. to comply with cec150.0(k)3 | $25,000 |