Back to bathroom remodel contractors
Graham Construction
- Based in
- San Frnacisco
- On San Francisco permits
- Jan 2015 to Oct 2019
- Last 24 months
- 0 permits filed
22 permits since 2000: 18 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
8 bathroom remodel permits: 7 completed, 1 never finaled. Typically 0 days from filing to permit and 138 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 25, 2019 | Completed final sign-off May 2020 | 1524 Leavenworth St | interior remodel only. 1)remodel extg bathrooms, 2)nw electrical throughout. 3)relocate and remodel extg kitchen, 4) reconfigure bedroom layout. 5)add laundry closet, 6) add 1.5 bathrooms. structural work undedr seperate permit #201910094647. plmg/elect work under seperate permit.Details
interior remodel only. 1)remodel extg bathrooms, 2)nw electrical throughout. 3)relocate and remodel extg kitchen, 4) reconfigure bedroom layout. 5)add laundry closet, 6) add 1.5 bathrooms. structural work undedr seperate permit #201910094647. plmg/elect work under seperate permit. | $80,000 |
| Aug 2, 2019 | Completed final sign-off May 2020 | 1524 Leavenworth St | remodel 2 kitchens, 4 full bathrooms & 2 half baths. add new forced air heating, new electrical & plumbing. no walls to be altered or removed.Details
remodel 2 kitchens, 4 full bathrooms & 2 half baths. add new forced air heating, new electrical & plumbing. no walls to be altered or removed. | $150,000 |
| Aug 28, 2018 | Never finaled issued Oct 2018, no final | 631 Mangels Av | kitchen renovation. demo interior walls. 1st fl - add bathroom, master bedroom and living room. add interior wallsDetails
kitchen renovation. demo interior walls. 1st fl - add bathroom, master bedroom and living room. add interior walls | $150,000 |
| Jun 13, 2017 | Completed final sign-off Mar 2018 | 505 Lyon St | revision to pa 2017-0228-0266 including construction of full bathroom in approved conditioned basement. structural revision to foundation work not required for scope of workDetails
revision to pa 2017-0228-0266 including construction of full bathroom in approved conditioned basement. structural revision to foundation work not required for scope of work | $15,000 |
| Jul 22, 2016 | Completed final sign-off Sep 2016 | 342 Utah St | bathroom remodel - no walls to be altered or removed. n/a maher ordinanceDetails
bathroom remodel - no walls to be altered or removed. n/a maher ordinance | $5,000 |
| Mar 10, 2016 | Completed final sign-off Jul 2016 | 4135 23rd St | replacement of existing kitchen cabinets, lighting & electrical, replacement of existing interior handrails & guardrails. relocating door in existing bathroom, paint througout.Details
replacement of existing kitchen cabinets, lighting & electrical, replacement of existing interior handrails & guardrails. relocating door in existing bathroom, paint througout. | $55,000 |
| Jul 14, 2015 | Completed final sign-off Nov 2015 | 1701 Broadway | replace all cabinets, appliances in kitchen, replace fixtures and finishes in masterbath. replace fixtures and finishes in guest bath. replace one window with awning window in guest bath in rear of bldg. no walls to be altered or removed. n/a for the maher ordinance.Details
replace all cabinets, appliances in kitchen, replace fixtures and finishes in masterbath. replace fixtures and finishes in guest bath. replace one window with awning window in guest bath in rear of bldg. no walls to be altered or removed. n/a for the maher ordinance. | $80,000 |
| May 22, 2015 | Completed final sign-off Aug 2015 | 8 Winfield St | remodel existing bathroom, install new exhaust fan. no new wall & no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5.Details
remodel existing bathroom, install new exhaust fan. no new wall & no existing wall relocation. lighting in bathroom remodel shall comply with cec 150.0(k)5. | $19,000 |