Block 2804, lot 042
4135 23rd St
- City’s use
- Single Family Residential
- Built
- 1912
- Stories
- 3
- Units
- 1
- Rooms
- 4 bedrooms, 3 bathrooms
- Building
- 2,661 sq ft
- Lot
- 2,944 sq ft
- Zoning
- RH2
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
8 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Mar 13, 2024 | Completed final sign-off Dec 2025 | 4135 23rd St | Modernscapes Sf | concrete retaining walls, fencing, concrete paver patio, firepit w/ natural gas supply, 120v electrical outlets in backyard, metal handrails for stairs.Details
concrete retaining walls, fencing, concrete paver patio, firepit w/ natural gas supply, 120v electrical outlets in backyard, metal handrails for stairs. | $150,000 |
| Sep 13, 2023 | Completed final sign-off Mar 2024 | 4135 23rd St | Barker-O'donoghue Master Bldrs | demolish 1 foot of wall adjacent to garage door. new garage door. demo garage doorDetails
demolish 1 foot of wall adjacent to garage door. new garage door. demo garage door | $5,000 |
| Sep 11, 2020 | Completed final sign-off Oct 2020 | 4135 23rd St | Lingruen Associates | perform repairs as per lingruen associates termite report 85512 item # 2a, 5bDetails
perform repairs as per lingruen associates termite report 85512 item # 2a, 5b | $5,340 |
| Sep 28, 2017 | Never finaled issued Mar 2018, no final | 4135 23rd St | Graham Construction | replace extg entry stairs in kind.Details
replace extg entry stairs in kind. | $4,200 |
| Mar 10, 2016 | Completed final sign-off Jul 2016 | 4135 23rd St | Graham Construction | replacement of existing kitchen cabinets, lighting & electrical, replacement of existing interior handrails & guardrails. relocating door in existing bathroom, paint througout.Details
replacement of existing kitchen cabinets, lighting & electrical, replacement of existing interior handrails & guardrails. relocating door in existing bathroom, paint througout. | $55,000 |
| Feb 15, 2008 | Never finaled issued Feb 2008, no final | 4135 23rd St | Gavin Painting & Cont* See 934867* | duct work-furnace is located in the basement, the new duct will lead to the 1st floor, the construction will included double wall 6" sheet metal to build the duct @ living room need protection between garage & first floor.Details
duct work-furnace is located in the basement, the new duct will lead to the 1st floor, the construction will included double wall 6" sheet metal to build the duct @ living room need protection between garage & first floor. | $200 |
| May 22, 2007 | Never finaled issued May 2007, no final | 4135 23rd St | street spaceDetails
street space | ||
| Dec 7, 2006 | Completed final sign-off Feb 2008 | 4135 23rd St | Gavin Painting & Cont* See 934867* | rear horizontal addition @ 1st, 2nd & 3rd flrs. demolition of (e) rear deck & construction of new wood deck. replacement of (e) vinyl windows with wood & clad windows. conversion of part of garage to habitable space. interior remodel including kitchen, bathrooms & (n) interior stair from 1st to 2ndDetails
rear horizontal addition @ 1st, 2nd & 3rd flrs. demolition of (e) rear deck & construction of new wood deck. replacement of (e) vinyl windows with wood & clad windows. conversion of part of garage to habitable space. interior remodel including kitchen, bathrooms & (n) interior stair from 1st to 2nd | $150,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.