Goodman Construction & Design Co
- Based in
- Daly City
- On San Francisco permits
- Nov 2007 to Apr 2025
- Last 24 months
- 1 permit filed
90 permits since 2000: 81 completed, 1 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 10 completed, 1 never finaled. Typically 4 days from filing to permit and 264 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 8, 2022 | Completed final sign-off Apr 2022 | 2128 17th Av | dry rot repair. front of house & front staircase. minor repair at front of house. staircase repair less than 50%. repair in kind for all work.Details
dry rot repair. front of house & front staircase. minor repair at front of house. staircase repair less than 50%. repair in kind for all work. | $8,000 |
| Nov 16, 2016 | Completed final sign-off Jan 2020 | 1988 Bush St | int renov to top 2 flr of a 3 story sfd. kitchen, bath and bedroom remodel. widen of exterior rear deck/stair guard rail and stairs to yard; (e) windows at front rear and side to replaced in kind with alum,wood clad units. new slider at rear. relocate/infill of west windows w/new in smaller openingsDetails
int renov to top 2 flr of a 3 story sfd. kitchen, bath and bedroom remodel. widen of exterior rear deck/stair guard rail and stairs to yard; (e) windows at front rear and side to replaced in kind with alum,wood clad units. new slider at rear. relocate/infill of west windows w/new in smaller openings | $100,000 |
| Oct 23, 2015 | Completed final sign-off Jan 2016 | 1723 27th Av | construct two bedroom, two full bathroom, laundry area at ground floor. construct new deck w/staircase at rear of bldg. (size approx 18'-8" x 5'-0").Details
construct two bedroom, two full bathroom, laundry area at ground floor. construct new deck w/staircase at rear of bldg. (size approx 18'-8" x 5'-0"). | $48,000 |
| Aug 12, 2015 | Completed final sign-off Aug 2015 | 80 Rossi Av | revision to pa 2013-1126-2846 to include deletion of new stairs and retaining walls in rear yardDetails
revision to pa 2013-1126-2846 to include deletion of new stairs and retaining walls in rear yard | |
| Sep 26, 2014 | Completed final sign-off Dec 2015 | 210 10th Av | add 1 bedroom, 1 powder room, add mudroom, new interior stairs to connect 1st and 2nd fl. e bath and kitchen remodel on 2nd and 3rd fl, add 1 bathon 4th flDetails
add 1 bedroom, 1 powder room, add mudroom, new interior stairs to connect 1st and 2nd fl. e bath and kitchen remodel on 2nd and 3rd fl, add 1 bathon 4th fl | $50,000 |
| May 20, 2014 | Completed final sign-off Feb 2015 | 536 Moraga St | remodel storage area behind garage to family room,bedrm, & bath. enclose lightwell at garage. enclose stairs from entry to grg & family room. reconfigure walls at kitchen, dining, & bathroom. enclose part of east litewell. remodel kchn & bath. replace fireplace with direct vent unit.Details
remodel storage area behind garage to family room,bedrm, & bath. enclose lightwell at garage. enclose stairs from entry to grg & family room. reconfigure walls at kitchen, dining, & bathroom. enclose part of east litewell. remodel kchn & bath. replace fireplace with direct vent unit. | $181,000 |
| Aug 15, 2011 | Never finaled issued Aug 2011, no final | 22 Almaden Ct | repair stair at front entrance per plan , at same location and same sizeDetails
repair stair at front entrance per plan , at same location and same size | $6,500 |
| Mar 1, 2011 | Completed final sign-off Nov 2011 | 21 Almaden Ct | enclose existing skylight at existing 2nd flr to enlarge kitchen. add 1 bath @ 2nd flr, relocate interior stair, add skylight ove new stairwell. add new bedroom, fam room, 1 full bath 1 powder rm, on existing 1st floor. add plywood wall at rear wall for voluntary structural improvement.Details
enclose existing skylight at existing 2nd flr to enlarge kitchen. add 1 bath @ 2nd flr, relocate interior stair, add skylight ove new stairwell. add new bedroom, fam room, 1 full bath 1 powder rm, on existing 1st floor. add plywood wall at rear wall for voluntary structural improvement. | $50,000 |
| Sep 24, 2010 | Completed final sign-off Jul 2011 | 1873 37th Av | construct rear deck (8'x4'x9' ht) with stairs. add one fam.rm, bedrm, full bath, storage and laundry area on (e) ground fl. remodel (e) kitch and 2 full bath on 2nd flDetails
construct rear deck (8'x4'x9' ht) with stairs. add one fam.rm, bedrm, full bath, storage and laundry area on (e) ground fl. remodel (e) kitch and 2 full bath on 2nd fl | $60,000 |
| May 28, 2010 | Completed final sign-off Mar 2011 | 124 08th Av | int. renov. to 1st. flr. & 2nd. flr. & (n) balcony & 3rd. flr. (n) window @ rear ground flr., 2nd. flr. & 3rd. flr. demo (e) exterior stair @ rear & infill (n) flr. framing. (n) flr. framing. (n) kit., bath, & bedrm. @ 2nd. flr. (n) fam.rm., off./bedrm. & laun.rm. @ ground flr. (n) int. stair to conDetails
int. renov. to 1st. flr. & 2nd. flr. & (n) balcony & 3rd. flr. (n) window @ rear ground flr., 2nd. flr. & 3rd. flr. demo (e) exterior stair @ rear & infill (n) flr. framing. (n) flr. framing. (n) kit., bath, & bedrm. @ 2nd. flr. (n) fam.rm., off./bedrm. & laun.rm. @ ground flr. (n) int. stair to con | $95,000 |
| Jun 23, 2009 | Completed final sign-off Feb 2010 | 615 Head St | add 1 play room, bedroom, 1 full bathrm & 1 laundry area on (e) ground fl. add 1 new full bathrm on 2nd fl, remodel (e) kitchen & 1 bathroom on 2nd fl. replace (e) 5 rear windows on 2nd fl, repair main stairs in kind. dry rot repair for ground fl northside wall & 2nd fl dining rm exterior front wallDetails
add 1 play room, bedroom, 1 full bathrm & 1 laundry area on (e) ground fl. add 1 new full bathrm on 2nd fl, remodel (e) kitchen & 1 bathroom on 2nd fl. replace (e) 5 rear windows on 2nd fl, repair main stairs in kind. dry rot repair for ground fl northside wall & 2nd fl dining rm exterior front wall | $50,000 |