Back to kitchen remodel contractors
Goodman Construction & Design Co
- Based in
- Daly City
- On San Francisco permits
- Nov 2007 to Apr 2025
- Last 24 months
- 1 permit filed
90 permits since 2000: 81 completed, 1 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
31 kitchen remodel permits: 27 completed, 1 in progress, 1 never finaled, 2 expired or cancelled. Typically 3 days from filing to permit and 209 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2025 | In progress issued Sep 2026 | 786 Sweeny St | add laundry units with sink, a 3 fixture bath, family room, storage closet & kitchenette on 1st fl. no structural alteration under this permitDetails
add laundry units with sink, a 3 fixture bath, family room, storage closet & kitchenette on 1st fl. no structural alteration under this permit | $80,000 |
| Mar 8, 2023 | Completed final sign-off Oct 2023 | 812 25th Av | 3/f unit# 2(812): 1) conversion of an existing shower room w/vanity into a full bath w/ 3-fixtures and replacement of 1-window. 2) remodeling of the toilet room. 3) kitchen remodeling, which includes the removal of non-bearing walls. 4) new enclosure for the water boiler.Details
3/f unit# 2(812): 1) conversion of an existing shower room w/vanity into a full bath w/ 3-fixtures and replacement of 1-window. 2) remodeling of the toilet room. 3) kitchen remodeling, which includes the removal of non-bearing walls. 4) new enclosure for the water boiler. | $35,000 |
| Mar 16, 2022 | Completed final sign-off Apr 2022 | 2128 17th Av | replace existing kit. sink w/ new kitchen sink. keep existing cabinet, replace existing vaniity with new bathroom vanity and eletrical outletDetails
replace existing kit. sink w/ new kitchen sink. keep existing cabinet, replace existing vaniity with new bathroom vanity and eletrical outlet | $2,000 |
| Dec 31, 2021 | Completed final sign-off Jun 2022 | 1247 39th Av | remodel existing kitchen and existing split bath with same configuration.Details
remodel existing kitchen and existing split bath with same configuration. | $35,000 |
| Jul 14, 2021 | Completed final sign-off Sep 2021 | 1839 42nd Av | remodel one kitchen, same configuration. install new recess lights, new tile floor and paint.Details
remodel one kitchen, same configuration. install new recess lights, new tile floor and paint. | $20,000 |
| Oct 31, 2019 | Never finaled issued Apr 2021, no final | 570 34th Av | 1st fl. add interior connection between fls, turn (e) play,study room & storage into 1 bedroom & 1 media room, relocate (3) fixtures in bathroom, add (1) powder rm on 2nd fl. reconfigure interior layout with (3) bedrooms, (2) bath, a wic kitchen, dining & living rm, lightwell infill on north sideDetails
1st fl. add interior connection between fls, turn (e) play,study room & storage into 1 bedroom & 1 media room, relocate (3) fixtures in bathroom, add (1) powder rm on 2nd fl. reconfigure interior layout with (3) bedrooms, (2) bath, a wic kitchen, dining & living rm, lightwell infill on north side | $50,000 |
| Aug 16, 2018 | Completed final sign-off Mar 2019 | 1861 Mcallister St | revision to bpa #201805229826. 3rd floor reconfigure kitchen layout.Details
revision to bpa #201805229826. 3rd floor reconfigure kitchen layout. | $2,000 |
| May 22, 2018 | Completed final sign-off Mar 2019 | 1861 Mcallister St | revision to app#201710312734. 2nd floor: reconfigure kitchen and bath layouts. 3rd floor: reconfigure kitchen.Details
revision to app#201710312734. 2nd floor: reconfigure kitchen and bath layouts. 3rd floor: reconfigure kitchen. | |
| Aug 3, 2017 | Expired or cancelled cancelled Mar 2024 | 1572 33rd Av | legalize as-built kitchen to create 2nd dwelling unit (unit b) on 1st flr per plan per ordinance #43-14.Details
legalize as-built kitchen to create 2nd dwelling unit (unit b) on 1st flr per plan per ordinance #43-14. | $12,000 |
| Nov 16, 2016 | Completed final sign-off Jan 2020 | 1988 Bush St | int renov to top 2 flr of a 3 story sfd. kitchen, bath and bedroom remodel. widen of exterior rear deck/stair guard rail and stairs to yard; (e) windows at front rear and side to replaced in kind with alum,wood clad units. new slider at rear. relocate/infill of west windows w/new in smaller openingsDetails
int renov to top 2 flr of a 3 story sfd. kitchen, bath and bedroom remodel. widen of exterior rear deck/stair guard rail and stairs to yard; (e) windows at front rear and side to replaced in kind with alum,wood clad units. new slider at rear. relocate/infill of west windows w/new in smaller openings | $100,000 |
| Mar 13, 2015 | Completed final sign-off Mar 2015 | 122 Stanyan St | revise pa#201307010857 remodel kitchen which is not mentioning in original appl but appear on drawing.Details
revise pa#201307010857 remodel kitchen which is not mentioning in original appl but appear on drawing. | $9,000 |
| Sep 26, 2014 | Completed final sign-off Dec 2015 | 210 10th Av | add 1 bedroom, 1 powder room, add mudroom, new interior stairs to connect 1st and 2nd fl. e bath and kitchen remodel on 2nd and 3rd fl, add 1 bathon 4th flDetails
add 1 bedroom, 1 powder room, add mudroom, new interior stairs to connect 1st and 2nd fl. e bath and kitchen remodel on 2nd and 3rd fl, add 1 bathon 4th fl | $50,000 |
| May 20, 2014 | Completed final sign-off Feb 2015 | 536 Moraga St | remodel storage area behind garage to family room,bedrm, & bath. enclose lightwell at garage. enclose stairs from entry to grg & family room. reconfigure walls at kitchen, dining, & bathroom. enclose part of east litewell. remodel kchn & bath. replace fireplace with direct vent unit.Details
remodel storage area behind garage to family room,bedrm, & bath. enclose lightwell at garage. enclose stairs from entry to grg & family room. reconfigure walls at kitchen, dining, & bathroom. enclose part of east litewell. remodel kchn & bath. replace fireplace with direct vent unit. | $181,000 |
| Jul 30, 2013 | Completed final sign-off Apr 2014 | 891 26th Av | add one bedroom, bathroom, playroom & laundry room on 1st floor per plan. add one bathroom & two skylights, remodel (e) bath & (e) kitchen on 2nd floor per plan.Details
add one bedroom, bathroom, playroom & laundry room on 1st floor per plan. add one bathroom & two skylights, remodel (e) bath & (e) kitchen on 2nd floor per plan. | $78,000 |
| May 1, 2013 | Completed final sign-off Nov 2013 | 532 42nd Av | remodel (e) kitchen, master bathroom addition per plan. replace (2) windowsDetails
remodel (e) kitchen, master bathroom addition per plan. replace (2) windows | $32,000 |
| Mar 1, 2013 | Completed final sign-off May 2014 | 3326 Steiner St | 1)enclose window in kitchen. 2)replace window in kind on 2nd floor per plan, not visable from street. 3)kitchen remodel on 2nd floor per plan. 4)bathroom remodel on 2nd floor per plan. 5)water heater and furnace installations.Details
1)enclose window in kitchen. 2)replace window in kind on 2nd floor per plan, not visable from street. 3)kitchen remodel on 2nd floor per plan. 4)bathroom remodel on 2nd floor per plan. 5)water heater and furnace installations. | $20,000 |
| Jul 24, 2012 | Completed final sign-off Nov 2012 | 2375 35th Av | remodel (e) kitchen and two full bathroom at 2nd floor in kind.Details
remodel (e) kitchen and two full bathroom at 2nd floor in kind. | $18,000 |
| Jun 6, 2012 | Completed final sign-off Mar 2013 | 742 04th Av | add bathroom, 2 bedrooms, 1 guest room, study room on ground fl. remodel 2 baths on 3rd fl per plan. foundation work per plan. install beams over kitchen and new mudroom per planDetails
add bathroom, 2 bedrooms, 1 guest room, study room on ground fl. remodel 2 baths on 3rd fl per plan. foundation work per plan. install beams over kitchen and new mudroom per plan | $70,000 |
| Apr 20, 2012 | Completed final sign-off Nov 2013 | 30 Almaden Ct | bathroom remodel on 2nd floor, remove partition wall at kitchen per plan replace windows at ketchen per planDetails
bathroom remodel on 2nd floor, remove partition wall at kitchen per plan replace windows at ketchen per plan | $12,000 |
| Mar 8, 2012 | Completed final sign-off Sep 2012 | 585 26th Av | 1)add a powder room and remodel bathroom on 3rd floor. 2)relocate kitchen and bathroom on 2nd floor.3)replace windows in kind at front. 4)install skylight 4'x4' flat.Details
1)add a powder room and remodel bathroom on 3rd floor. 2)relocate kitchen and bathroom on 2nd floor.3)replace windows in kind at front. 4)install skylight 4'x4' flat. | $45,000 |
| Feb 23, 2012 | Completed final sign-off Oct 2012 | 545 Spruce St | add 1 bedroom, bath, storage, laundry room, den on 1st floor per plan. baths and kitchen remodel on 2nd fl per plan. replace windows in kind. same size and location per plan. aluminum match configuration of front windows.Details
add 1 bedroom, bath, storage, laundry room, den on 1st floor per plan. baths and kitchen remodel on 2nd fl per plan. replace windows in kind. same size and location per plan. aluminum match configuration of front windows. | $57,000 |
| May 26, 2011 | Completed final sign-off Oct 2011 | 423 Ramsell St | remodel existing kitchen & bath, replace existing furnace to new force air heating, upgrade electrical to 100 amp. provide high efficiency light/occupancy sensor per cec 150k.Details
remodel existing kitchen & bath, replace existing furnace to new force air heating, upgrade electrical to 100 amp. provide high efficiency light/occupancy sensor per cec 150k. | $23,000 |
| Mar 1, 2011 | Completed final sign-off Nov 2011 | 21 Almaden Ct | enclose existing skylight at existing 2nd flr to enlarge kitchen. add 1 bath @ 2nd flr, relocate interior stair, add skylight ove new stairwell. add new bedroom, fam room, 1 full bath 1 powder rm, on existing 1st floor. add plywood wall at rear wall for voluntary structural improvement.Details
enclose existing skylight at existing 2nd flr to enlarge kitchen. add 1 bath @ 2nd flr, relocate interior stair, add skylight ove new stairwell. add new bedroom, fam room, 1 full bath 1 powder rm, on existing 1st floor. add plywood wall at rear wall for voluntary structural improvement. | $50,000 |
| May 6, 2010 | Completed final sign-off Sep 2010 | 1238 35th Av | add 1 family room, 2 bedrooms, 2 full bathrooms, laundry area on (e) ground floor plan. add 1 new full bathroom & remodel (e) bathroom, kitchen on 2nd floorDetails
add 1 family room, 2 bedrooms, 2 full bathrooms, laundry area on (e) ground floor plan. add 1 new full bathroom & remodel (e) bathroom, kitchen on 2nd floor | $65,000 |
| Jun 23, 2009 | Completed final sign-off Feb 2010 | 615 Head St | add 1 play room, bedroom, 1 full bathrm & 1 laundry area on (e) ground fl. add 1 new full bathrm on 2nd fl, remodel (e) kitchen & 1 bathroom on 2nd fl. replace (e) 5 rear windows on 2nd fl, repair main stairs in kind. dry rot repair for ground fl northside wall & 2nd fl dining rm exterior front wallDetails
add 1 play room, bedroom, 1 full bathrm & 1 laundry area on (e) ground fl. add 1 new full bathrm on 2nd fl, remodel (e) kitchen & 1 bathroom on 2nd fl. replace (e) 5 rear windows on 2nd fl, repair main stairs in kind. dry rot repair for ground fl northside wall & 2nd fl dining rm exterior front wall | $50,000 |
| May 13, 2009 | Completed final sign-off Sep 2009 | 723 44th Av | to add one family room. one study room and one half bathroom on extg ground floor per plan. remodel extg kitchen on 2nd floorDetails
to add one family room. one study room and one half bathroom on extg ground floor per plan. remodel extg kitchen on 2nd floor | $28,000 |
| May 4, 2009 | Completed final sign-off Jul 2009 | 269 16th Av | remodel existing kitchen on upper unit#269. new cabints, hood, counter, sink, stove (gas) . no change to walls or windows.Details
remodel existing kitchen on upper unit#269. new cabints, hood, counter, sink, stove (gas) . no change to walls or windows. | $13,000 |
| Nov 26, 2008 | Completed final sign-off Jun 2009 | 224 30th Av | remove & replace with new vanity, tiles & toilet in half bath. install new counter, sink, hood & appliances in kitchen. replace 2 sets of french doors with similar doors. replace rotted wood siding between main & top level with same about 100 sq. ft. it is the wiindow & balcony siding.Details
remove & replace with new vanity, tiles & toilet in half bath. install new counter, sink, hood & appliances in kitchen. replace 2 sets of french doors with similar doors. replace rotted wood siding between main & top level with same about 100 sq. ft. it is the wiindow & balcony siding. | $50,000 |
| Nov 26, 2008 | Completed final sign-off Nov 2009 | 307 San Leandro Wy | revised storage area into computer room, utilitze room, den and exercise rm, add sauna room & wine cellar at basement, revised kitchen layout at 1st flr, shift bathroom at 2nd flr bet. bedroom 1 & 2, rev to appn. 200711299231sDetails
revised storage area into computer room, utilitze room, den and exercise rm, add sauna room & wine cellar at basement, revised kitchen layout at 1st flr, shift bathroom at 2nd flr bet. bedroom 1 & 2, rev to appn. 200711299231s | $30,000 |
| Apr 9, 2008 | Completed final sign-off Jan 2009 | 190 Miraloma Dr | remodel kitchen ,powder bath, 2nd floor & master baths.new wall, cabinets, door & fixtures in kitchen & powder bath; reconfigure (e) bathrooms on 2nd floor.Details
remodel kitchen ,powder bath, 2nd floor & master baths.new wall, cabinets, door & fixtures in kitchen & powder bath; reconfigure (e) bathrooms on 2nd floor. | $50,000 |
| Nov 29, 2007 | Expired or cancelled expired Nov 2009 | 307 San Leandro Wy | horizontal addition on 2nd fllor. raise (e) roof approx. 2 feet above existing. remodel 1st floor bath and kitchen. add one bath in basement.Details
horizontal addition on 2nd fllor. raise (e) roof approx. 2 feet above existing. remodel 1st floor bath and kitchen. add one bath in basement. | $150,000 |