Goodman Construction & Design Co
- Based in
- Daly City
- On San Francisco permits
- Nov 2007 to Apr 2025
- Last 24 months
- 1 permit filed
90 permits since 2000: 81 completed, 1 in progress, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 1 is 3 to 5 years old, 2 are 5 to 10 years old, 2 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
6 deck permits: 6 completed. Typically 6 days from filing to permit and 268 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 30, 2019 | Completed final sign-off May 2020 | 224 30th Av | 1st fl: add one powder room. 2nd fl: add one deck at rear. 3rd fl: remodel (e) master bathroom.Details
1st fl: add one powder room. 2nd fl: add one deck at rear. 3rd fl: remodel (e) master bathroom. | $20,000 |
| Nov 16, 2016 | Completed final sign-off Jan 2020 | 1988 Bush St | int renov to top 2 flr of a 3 story sfd. kitchen, bath and bedroom remodel. widen of exterior rear deck/stair guard rail and stairs to yard; (e) windows at front rear and side to replaced in kind with alum,wood clad units. new slider at rear. relocate/infill of west windows w/new in smaller openingsDetails
int renov to top 2 flr of a 3 story sfd. kitchen, bath and bedroom remodel. widen of exterior rear deck/stair guard rail and stairs to yard; (e) windows at front rear and side to replaced in kind with alum,wood clad units. new slider at rear. relocate/infill of west windows w/new in smaller openings | $100,000 |
| Oct 23, 2015 | Completed final sign-off Jan 2016 | 1723 27th Av | construct two bedroom, two full bathroom, laundry area at ground floor. construct new deck w/staircase at rear of bldg. (size approx 18'-8" x 5'-0").Details
construct two bedroom, two full bathroom, laundry area at ground floor. construct new deck w/staircase at rear of bldg. (size approx 18'-8" x 5'-0"). | $48,000 |
| Sep 24, 2010 | Completed final sign-off Jul 2011 | 1873 37th Av | construct rear deck (8'x4'x9' ht) with stairs. add one fam.rm, bedrm, full bath, storage and laundry area on (e) ground fl. remodel (e) kitch and 2 full bath on 2nd flDetails
construct rear deck (8'x4'x9' ht) with stairs. add one fam.rm, bedrm, full bath, storage and laundry area on (e) ground fl. remodel (e) kitch and 2 full bath on 2nd fl | $60,000 |
| Jul 16, 2010 | Completed final sign-off Feb 2011 | 25 Almaden Ct | renovation of ground floor, 2nd floor with addition of windows, doors, skylights & new platform (deck), infill (e) lightwellDetails
renovation of ground floor, 2nd floor with addition of windows, doors, skylights & new platform (deck), infill (e) lightwell | $135,000 |
| Aug 27, 2009 | Completed final sign-off May 2010 | 73 Almaden Ct | renovation to ground floor & second floor with addition of new windows, doors, skylight & rear deck.Details
renovation to ground floor & second floor with addition of new windows, doors, skylight & rear deck. | $150,000 |