Back to kitchen remodel contractors
Gelling & Judd Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to Oct 2021
- Last 24 months
- 0 permits filed
92 permits since 2000: 82 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
18 kitchen remodel permits: 16 completed, 1 never finaled, 1 expired or cancelled. Typically 10 days from filing to permit and 180 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 13, 2018 | Expired or cancelled expired Oct 2021 | 800 El Camino Del Mar | revision to 201404042616s1. revise kitchen design to eliminate a structural shear wall and add new strong wall shear in alternate location with new steel beam below. add new built in with sink in wine roomDetails
revision to 201404042616s1. revise kitchen design to eliminate a structural shear wall and add new strong wall shear in alternate location with new steel beam below. add new built in with sink in wine room | $25,000 |
| Dec 7, 2016 | Completed final sign-off Jun 2017 | 255 17th Av | remodel bathroom & kitchen in kind.Details
remodel bathroom & kitchen in kind. | $30,000 |
| May 7, 2013 | Completed final sign-off Oct 2013 | 25 Chabot Tr | demo 2 kitchens and bathrooms and upgrade electrical and plumbing to code and replace cabinetry and countertops, appliancesDetails
demo 2 kitchens and bathrooms and upgrade electrical and plumbing to code and replace cabinetry and countertops, appliances | $75,000 |
| Oct 16, 2012 | Completed final sign-off Aug 2014 | 414 Liberty St | conversion of basement to habitable space including excavading to previous required hea heights & infill to match upper rear facade - new bathroom, study & family room. relocation of basement stair-remodle master bath/closet - relocate 2nd floor bath -remodel kitchen - replace (e) decks, & pavedDetails
conversion of basement to habitable space including excavading to previous required hea heights & infill to match upper rear facade - new bathroom, study & family room. relocation of basement stair-remodle master bath/closet - relocate 2nd floor bath -remodel kitchen - replace (e) decks, & paved | $30,252 |
| Sep 14, 2012 | Completed final sign-off Nov 2012 | 1845 Church St | kitchen remodel, replace drywall, install floor, install cabinets, replace (e) window w/ one of identical size. u factor less than .4 lighting shall comply w/ t-24Details
kitchen remodel, replace drywall, install floor, install cabinets, replace (e) window w/ one of identical size. u factor less than .4 lighting shall comply w/ t-24 | $18,000 |
| Sep 13, 2012 | Completed final sign-off Jun 2013 | 1 Hoffman Av | remodel of (e) condo unit#b. remodel of kitchen & bathroom. addition of new bathroom. replacement of vinyl windows w/ new vinyl windows. installation of new forced air unit & tankless water heater w/in condo unit.Details
remodel of (e) condo unit#b. remodel of kitchen & bathroom. addition of new bathroom. replacement of vinyl windows w/ new vinyl windows. installation of new forced air unit & tankless water heater w/in condo unit. | $159,000 |
| Sep 12, 2012 | Completed final sign-off Aug 2013 | 522 Alvarado St | remodel e single family dwelling. remodel e rear addition structure including support structure below. full remodel of e kitchen -addition of new water closet on 2nd fl. new windows and replacement windows to exterior facades. new bath on 3rd fl. remodel e bath on 3rd flDetails
remodel e single family dwelling. remodel e rear addition structure including support structure below. full remodel of e kitchen -addition of new water closet on 2nd fl. new windows and replacement windows to exterior facades. new bath on 3rd fl. remodel e bath on 3rd fl | $138,897 |
| Mar 23, 2012 | Completed final sign-off Jul 2012 | 186 Stanyan St | demo two (e) kitchens/bathrooms. replace w/ new cabinets & fixtures. no change on walls & openings.Details
demo two (e) kitchens/bathrooms. replace w/ new cabinets & fixtures. no change on walls & openings. | $95,000 |
| Nov 14, 2011 | Completed final sign-off Jul 2012 | 3791 21st St | replace windows, upgrade kitchen, bathroom, electrical and plumbing. repair deck as needed at rear.Details
replace windows, upgrade kitchen, bathroom, electrical and plumbing. repair deck as needed at rear. | $117,000 |
| May 18, 2011 | Completed final sign-off Sep 2011 | 2700 Diamond St | unit #2702-kitchen remodel in upper unit. lighting to comply with cec 150 (k).Details
unit #2702-kitchen remodel in upper unit. lighting to comply with cec 150 (k). | $12,000 |
| Apr 7, 2011 | Completed final sign-off Feb 2012 | 22 Chabot Tr | remodel kitchen and bath at 2nd floor. new interior stair between 1st and 2nd fl, change window to french door, convert storage at gr floor to bedroom, family room, and bath. elec, plumb, mech under sep permitDetails
remodel kitchen and bath at 2nd floor. new interior stair between 1st and 2nd fl, change window to french door, convert storage at gr floor to bedroom, family room, and bath. elec, plumb, mech under sep permit | $250,000 |
| Jan 27, 2011 | Completed final sign-off Jul 2011 | 770 Teresita Bl | renovate kitchen & enclose (e) lightwell (located in center of building), per plans.Details
renovate kitchen & enclose (e) lightwell (located in center of building), per plans. | $50,000 |
| Apr 16, 2010 | Completed final sign-off Dec 2010 | 518 Alvarado St | remodel 1fd-conversion of (e) basement/storage to habitable space, addition of new stair from basement & addition of new wc on 1st fl. remodel of (e) family/dining rms, full remodel 0f (e) kitchen, addition of new storage below (e) rear addition (infill), replace (e) deck, new grading/steps to rearDetails
remodel 1fd-conversion of (e) basement/storage to habitable space, addition of new stair from basement & addition of new wc on 1st fl. remodel of (e) family/dining rms, full remodel 0f (e) kitchen, addition of new storage below (e) rear addition (infill), replace (e) deck, new grading/steps to rear | $182,668 |
| Apr 14, 2010 | Completed final sign-off Sep 2010 | 186 Stanyan St | lower units 1 and 2, first fl. removal of (e) kitchen cabinetry and installation of new kitchen counters and cabs along woth minor demo of non-load bearing partitions. replace appliances as per plan.Details
lower units 1 and 2, first fl. removal of (e) kitchen cabinetry and installation of new kitchen counters and cabs along woth minor demo of non-load bearing partitions. replace appliances as per plan. | $30,000 |
| Dec 3, 2009 | Never finaled issued Feb 2010, no final | 53 Chabot Tr | the scope of work to (e) sfd includes remodel/renovation to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd & 3rd floors. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floorDetails
the scope of work to (e) sfd includes remodel/renovation to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd & 3rd floors. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floor | $200,000 |
| Dec 3, 2009 | Completed final sign-off Sep 2010 | 28 Chabot Tr | remodel/renovate to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd floor. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floorDetails
remodel/renovate to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd floor. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floor | $200,000 |
| Aug 21, 2008 | Completed final sign-off Dec 2008 | 4120 24th St | interior remodeling of unit#2. remodel kitchen, bathroom, living rm and dinning rm. widen openings between kitchen and living rm. new back door, new forced air unit in basement and all related services and ductingDetails
interior remodeling of unit#2. remodel kitchen, bathroom, living rm and dinning rm. widen openings between kitchen and living rm. new back door, new forced air unit in basement and all related services and ducting | $38,000 |
| Jul 22, 2008 | Completed final sign-off Jan 2009 | 2741 Divisadero St | remodel kitchen on 2nd floor. no structural work.Details
remodel kitchen on 2nd floor. no structural work. | $100,000 |