Back to bathroom remodel contractors
Gelling & Judd Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to Oct 2021
- Last 24 months
- 0 permits filed
92 permits since 2000: 82 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
24 bathroom remodel permits: 22 completed, 1 never finaled, 1 expired or cancelled. Typically 6 days from filing to permit and 227 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 13, 2018 | Expired or cancelled expired May 2026 | 72 05th Av | rear horizontal addition at 1st and 2nd fl. renovation to existing 1st, 2nd and 3rd fl of main house. new bath at 2nd flDetails
rear horizontal addition at 1st and 2nd fl. renovation to existing 1st, 2nd and 3rd fl of main house. new bath at 2nd fl | $500,000 |
| May 31, 2017 | Completed final sign-off Oct 2018 | 8 Dellbrook Av | mold was found demo bathroom walls, tile replace with new tile, delete shower move toilet to shower areaDetails
mold was found demo bathroom walls, tile replace with new tile, delete shower move toilet to shower area | $9,000 |
| Dec 7, 2016 | Completed final sign-off Jun 2017 | 255 17th Av | remodel bathroom & kitchen in kind.Details
remodel bathroom & kitchen in kind. | $30,000 |
| May 7, 2014 | Completed final sign-off Sep 2014 | 22 Abbey St | remodel existing 4th bathroom. all same locations, just new fixtures.Details
remodel existing 4th bathroom. all same locations, just new fixtures. | $6,000 |
| Apr 4, 2014 | Completed final sign-off Oct 2021 | 800 El Camino Del Mar | remodel of (e) residence & vertical addition over portion of (e) residence creation new 3rd floor. variance needed for small side yard encroachment at north / east corner. addition to include 4 new bedrooms & 3 new baths.Details
remodel of (e) residence & vertical addition over portion of (e) residence creation new 3rd floor. variance needed for small side yard encroachment at north / east corner. addition to include 4 new bedrooms & 3 new baths. | $600,000 |
| Feb 6, 2014 | Completed final sign-off Apr 2014 | 1830 Mcallister St | revision to previous bath remodel permit 201311202413. new footings at perimeter of gr floor bath.Details
revision to previous bath remodel permit 201311202413. new footings at perimeter of gr floor bath. | $5,000 |
| Jan 16, 2014 | Completed final sign-off Feb 2016 | 757 Chenery St | renovate (e) bathroom. no structural change or change to fixture count new tub, wc: lav. to replace (e), new tile to replace (e0. plumbing & electrical work filed under separate permit.Details
renovate (e) bathroom. no structural change or change to fixture count new tub, wc: lav. to replace (e), new tile to replace (e0. plumbing & electrical work filed under separate permit. | $10,000 |
| Nov 20, 2013 | Completed final sign-off Apr 2014 | 1830 Mcallister St | convert (e) storage room to (n) bathroom.Details
convert (e) storage room to (n) bathroom. | $25,000 |
| Aug 28, 2013 | Completed final sign-off Sep 2014 | 22 Abbey St | replace in kind kind, 3 bathrooms & remodel. paint throughout resand floors.Details
replace in kind kind, 3 bathrooms & remodel. paint throughout resand floors. | $57,000 |
| May 7, 2013 | Completed final sign-off Oct 2013 | 25 Chabot Tr | demo 2 kitchens and bathrooms and upgrade electrical and plumbing to code and replace cabinetry and countertops, appliancesDetails
demo 2 kitchens and bathrooms and upgrade electrical and plumbing to code and replace cabinetry and countertops, appliances | $75,000 |
| Feb 8, 2013 | Completed final sign-off Aug 2013 | 522 Alvarado St | conversion ground flr storage in (n) habitable space includ family rm,storage, bedroom, bathroom & laundry, replace stair, finishes, fixtures,casework,plbg, elec & havac, (n) slab at lowered elevation,foundation strengthed is req'd, (n) rear yard steps, retaining walls & slab. ref #2012.0912.9581.Details
conversion ground flr storage in (n) habitable space includ family rm,storage, bedroom, bathroom & laundry, replace stair, finishes, fixtures,casework,plbg, elec & havac, (n) slab at lowered elevation,foundation strengthed is req'd, (n) rear yard steps, retaining walls & slab. ref #2012.0912.9581. | $88,679 |
| Dec 11, 2012 | Completed final sign-off Oct 2013 | 282 28th Av | interior remdoel to include addition of (n) cabinetry & media unit and nw wall w/pocket door and overhead beam at 1st fl. partial excavation at basement level w/(n) bathroom, study, laundry, storage and office. garage door and opening to be widened. (n) window at front at basement level.Details
interior remdoel to include addition of (n) cabinetry & media unit and nw wall w/pocket door and overhead beam at 1st fl. partial excavation at basement level w/(n) bathroom, study, laundry, storage and office. garage door and opening to be widened. (n) window at front at basement level. | $125,000 |
| Nov 29, 2012 | Completed final sign-off Oct 2013 | 282 28th Av | demo existing bathroom, new location for toilet/sink & shower, tile & paint on 2nd floor; no change on walls and openingDetails
demo existing bathroom, new location for toilet/sink & shower, tile & paint on 2nd floor; no change on walls and opening | $14,000 |
| Oct 16, 2012 | Completed final sign-off Aug 2014 | 414 Liberty St | conversion of basement to habitable space including excavading to previous required hea heights & infill to match upper rear facade - new bathroom, study & family room. relocation of basement stair-remodle master bath/closet - relocate 2nd floor bath -remodel kitchen - replace (e) decks, & pavedDetails
conversion of basement to habitable space including excavading to previous required hea heights & infill to match upper rear facade - new bathroom, study & family room. relocation of basement stair-remodle master bath/closet - relocate 2nd floor bath -remodel kitchen - replace (e) decks, & paved | $30,252 |
| Sep 13, 2012 | Completed final sign-off Jun 2013 | 1 Hoffman Av | remodel of (e) condo unit#b. remodel of kitchen & bathroom. addition of new bathroom. replacement of vinyl windows w/ new vinyl windows. installation of new forced air unit & tankless water heater w/in condo unit.Details
remodel of (e) condo unit#b. remodel of kitchen & bathroom. addition of new bathroom. replacement of vinyl windows w/ new vinyl windows. installation of new forced air unit & tankless water heater w/in condo unit. | $159,000 |
| Sep 12, 2012 | Completed final sign-off Aug 2013 | 522 Alvarado St | remodel e single family dwelling. remodel e rear addition structure including support structure below. full remodel of e kitchen -addition of new water closet on 2nd fl. new windows and replacement windows to exterior facades. new bath on 3rd fl. remodel e bath on 3rd flDetails
remodel e single family dwelling. remodel e rear addition structure including support structure below. full remodel of e kitchen -addition of new water closet on 2nd fl. new windows and replacement windows to exterior facades. new bath on 3rd fl. remodel e bath on 3rd fl | $138,897 |
| Mar 23, 2012 | Completed final sign-off Jul 2012 | 186 Stanyan St | demo two (e) kitchens/bathrooms. replace w/ new cabinets & fixtures. no change on walls & openings.Details
demo two (e) kitchens/bathrooms. replace w/ new cabinets & fixtures. no change on walls & openings. | $95,000 |
| Nov 14, 2011 | Completed final sign-off Jul 2012 | 3791 21st St | replace windows, upgrade kitchen, bathroom, electrical and plumbing. repair deck as needed at rear.Details
replace windows, upgrade kitchen, bathroom, electrical and plumbing. repair deck as needed at rear. | $117,000 |
| Apr 7, 2011 | Completed final sign-off Feb 2012 | 22 Chabot Tr | remodel kitchen and bath at 2nd floor. new interior stair between 1st and 2nd fl, change window to french door, convert storage at gr floor to bedroom, family room, and bath. elec, plumb, mech under sep permitDetails
remodel kitchen and bath at 2nd floor. new interior stair between 1st and 2nd fl, change window to french door, convert storage at gr floor to bedroom, family room, and bath. elec, plumb, mech under sep permit | $250,000 |
| Dec 3, 2009 | Never finaled issued Feb 2010, no final | 53 Chabot Tr | the scope of work to (e) sfd includes remodel/renovation to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd & 3rd floors. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floorDetails
the scope of work to (e) sfd includes remodel/renovation to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd & 3rd floors. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floor | $200,000 |
| Dec 3, 2009 | Completed final sign-off Sep 2010 | 28 Chabot Tr | remodel/renovate to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd floor. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floorDetails
remodel/renovate to provide new contemp. kitchen to the 2nd fl, bathroom facilities to the 2nd floor. new interior stairwy, family room, bedroom & other accomodations to the rear of the ground floor | $200,000 |
| Apr 8, 2009 | Completed final sign-off Dec 2009 | 395 Collingwood St | create new conditioned space on 1st floor within extg garage/storage area. add powder room, bathroom, bedroom, family room, study and laundry room. add new wndws and exterior door. rebuild extg interior stair.Details
create new conditioned space on 1st floor within extg garage/storage area. add powder room, bathroom, bedroom, family room, study and laundry room. add new wndws and exterior door. rebuild extg interior stair. | $185,000 |
| Aug 21, 2008 | Completed final sign-off Dec 2008 | 4120 24th St | interior remodeling of unit#2. remodel kitchen, bathroom, living rm and dinning rm. widen openings between kitchen and living rm. new back door, new forced air unit in basement and all related services and ductingDetails
interior remodeling of unit#2. remodel kitchen, bathroom, living rm and dinning rm. widen openings between kitchen and living rm. new back door, new forced air unit in basement and all related services and ducting | $38,000 |
| Aug 27, 2007 | Completed final sign-off Nov 2007 | 231 Eureka St | work @ unit# 229 (top floor). demo & remodel bathroom as per plan. new skylight.Details
work @ unit# 229 (top floor). demo & remodel bathroom as per plan. new skylight. | $11,500 |