Gelling & Judd Inc.
- Based in
- San Francisco
- On San Francisco permits
- Feb 2007 to Oct 2021
- Last 24 months
- 0 permits filed
92 permits since 2000: 82 completed, 5 never finaled, 5 expired or cancelled.
Of the 5 never-finaled permits, 1 is 5 to 10 years old, 4 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Deck permits
8 deck permits: 8 completed. Typically 18 days from filing to permit and 225 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 7, 2015 | Completed final sign-off Feb 2016 | 3580 21st St | revision to pa # 2010 1130 5785 - part of remodel to sfd, add (n) paved deck in rear yard to be less than 36" above grade.Details
revision to pa # 2010 1130 5785 - part of remodel to sfd, add (n) paved deck in rear yard to be less than 36" above grade. | $2,500 |
| Jan 8, 2013 | Completed final sign-off Oct 2013 | 282 28th Av | partial excavation of ground floor & horizontal extension at rear under (e) deck. extension of deck to north property line installation of new fire wall & new stairs down to grade.Details
partial excavation of ground floor & horizontal extension at rear under (e) deck. extension of deck to north property line installation of new fire wall & new stairs down to grade. | $42,000 |
| Oct 16, 2012 | Completed final sign-off Aug 2014 | 414 Liberty St | conversion of basement to habitable space including excavading to previous required hea heights & infill to match upper rear facade - new bathroom, study & family room. relocation of basement stair-remodle master bath/closet - relocate 2nd floor bath -remodel kitchen - replace (e) decks, & pavedDetails
conversion of basement to habitable space including excavading to previous required hea heights & infill to match upper rear facade - new bathroom, study & family room. relocation of basement stair-remodle master bath/closet - relocate 2nd floor bath -remodel kitchen - replace (e) decks, & paved | $30,252 |
| Nov 14, 2011 | Completed final sign-off Jul 2012 | 3791 21st St | replace windows, upgrade kitchen, bathroom, electrical and plumbing. repair deck as needed at rear.Details
replace windows, upgrade kitchen, bathroom, electrical and plumbing. repair deck as needed at rear. | $117,000 |
| Feb 2, 2011 | Completed final sign-off Sep 2011 | 2700 Diamond St | removal of lower level, illegal studio and deck with no address. replace garage door. removal of existing lower level door.Details
removal of lower level, illegal studio and deck with no address. replace garage door. removal of existing lower level door. | $15,000 |
| Apr 16, 2010 | Completed final sign-off Dec 2010 | 518 Alvarado St | remodel 1fd-conversion of (e) basement/storage to habitable space, addition of new stair from basement & addition of new wc on 1st fl. remodel of (e) family/dining rms, full remodel 0f (e) kitchen, addition of new storage below (e) rear addition (infill), replace (e) deck, new grading/steps to rearDetails
remodel 1fd-conversion of (e) basement/storage to habitable space, addition of new stair from basement & addition of new wc on 1st fl. remodel of (e) family/dining rms, full remodel 0f (e) kitchen, addition of new storage below (e) rear addition (infill), replace (e) deck, new grading/steps to rear | $182,668 |
| Jan 25, 2010 | Completed final sign-off Nov 2011 | 4206 23rd St | vertical second story addition to exisitng single story hoem with finished basement, remodel of finishes in exisitng floors. horizontal add under (e) permitted deck, relocate rear stair from deck to ground.Details
vertical second story addition to exisitng single story hoem with finished basement, remodel of finishes in exisitng floors. horizontal add under (e) permitted deck, relocate rear stair from deck to ground. | $200,000 |
| Oct 14, 2009 | Completed final sign-off Dec 2009 | 395 Collingwood St | create new deck over e flat roof at 3rd floorDetails
create new deck over e flat roof at 3rd floor | $13,000 |