Back to kitchen remodel contractors
Gavin Painting & Cont* See 934867*
- Based in
- San Bruno
- On San Francisco permits
- Jun 2000 to Oct 2014
- Last 24 months
- 0 permits filed
189 permits since 2000: 111 completed, 26 never finaled, 52 expired or cancelled.
Of the 26 never-finaled permits, 26 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
43 kitchen remodel permits: 26 completed, 9 never finaled, 8 expired or cancelled. Typically 0 days from filing to permit and 198 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 24, 2012 | Expired or cancelled expired May 2015 | 2220 Clay St | remodel kitchen and adjacent guest bathroom, mep to be deferred permit, remodeling includes: finish & fixute upgrade, no structural work, all partitions to remain. no lighting under this permit.Details
remodel kitchen and adjacent guest bathroom, mep to be deferred permit, remodeling includes: finish & fixute upgrade, no structural work, all partitions to remain. no lighting under this permit. | $20,000 |
| Nov 16, 2010 | Never finaled issued Dec 2010, no final | 3368 Jackson St | interior remodel to include kitchen & baths, new itnerior stair. reconfigure layouts for all floors. no work at exterior.Details
interior remodel to include kitchen & baths, new itnerior stair. reconfigure layouts for all floors. no work at exterior. | $350,000 |
| Aug 30, 2010 | Never finaled issued Aug 2010, no final | 2531 Gough St | work to be done on #2531 only- non structrual remodel of kitchen and 2 bathrooms, upgrades throughout the unit on 3/fDetails
work to be done on #2531 only- non structrual remodel of kitchen and 2 bathrooms, upgrades throughout the unit on 3/f | $3,500 |
| Apr 6, 2010 | Never finaled issued Apr 2010, no final | 2527 Washington St | kitchen & bathroom remodel, replace fixtures & fittings, non structural. 50% watt in h.e. light @ kitchen, h.e. or manual on o.s. @ bath.Details
kitchen & bathroom remodel, replace fixtures & fittings, non structural. 50% watt in h.e. light @ kitchen, h.e. or manual on o.s. @ bath. | $5,000 |
| Aug 13, 2009 | Completed final sign-off Mar 2010 | 385 Day St | non-structural kitchen and bedroom remodel, kitchen counter/cabinets and hardwood floor; bathroom: new tiles, cabinets and fixtures and fittings. electrical and plumbing work under separate permit. provide high efficacy light per title 24 requirementDetails
non-structural kitchen and bedroom remodel, kitchen counter/cabinets and hardwood floor; bathroom: new tiles, cabinets and fixtures and fittings. electrical and plumbing work under separate permit. provide high efficacy light per title 24 requirement | $30,000 |
| May 7, 2009 | Never finaled issued May 2009, no final | 228 Hyde St | work @ unit# 228 only. replace kitchen cabinets. no structural work.Details
work @ unit# 228 only. replace kitchen cabinets. no structural work. | $3,000 |
| Apr 22, 2009 | Expired or cancelled expired Jul 2012 | 160 17th Av | work on unit#160 only. non structural bathroom (6'x6') and kitchen (19'x9'). remodel. replacement of existing with new cabinets only. no shower pans and some electrical work in both kitchen and bathroom. no upgrade needed 50% kitchen light watts in fluorescent. fluorescent or manual on or sensor inDetails
work on unit#160 only. non structural bathroom (6'x6') and kitchen (19'x9'). remodel. replacement of existing with new cabinets only. no shower pans and some electrical work in both kitchen and bathroom. no upgrade needed 50% kitchen light watts in fluorescent. fluorescent or manual on or sensor in | $28,085 |
| Jan 20, 2009 | Completed final sign-off Jul 2009 | 765 Market St | condo remodel unit 24g: interior renovation of existing living rm, dining rm, kitchen, powder room, and guest bathroom.Details
condo remodel unit 24g: interior renovation of existing living rm, dining rm, kitchen, powder room, and guest bathroom. | $57,000 |
| Aug 12, 2008 | Completed final sign-off Sep 2013 | 1881 15th St | remodel a kitchen & bathroom from storage area. cap off all plumbing and electrical.Details
remodel a kitchen & bathroom from storage area. cap off all plumbing and electrical. | $4,000 |
| Mar 11, 2008 | Completed final sign-off Apr 2009 | 176 Merced Av | amendment to appl #200712059655 - removal of one wall in the kitchen, addition of partition walls in garage, installation of sill anchor & plywood shoring.Details
amendment to appl #200712059655 - removal of one wall in the kitchen, addition of partition walls in garage, installation of sill anchor & plywood shoring. | $2,500 |
| Jan 30, 2008 | Completed final sign-off Jul 2009 | 48 Clifford Tr | non conforming structure. rear yard remodel. fill in lightwell, interior upgrades, replacment of windows, voluntary seismic upgrade 1st floor: add 1 bedroom, 1 bath, laundry, familyroom. 2nd flr: stairs, enlarge kitchen, 1/2 back, deck, 3rd fl: new bath, remove 1 bedroomDetails
non conforming structure. rear yard remodel. fill in lightwell, interior upgrades, replacment of windows, voluntary seismic upgrade 1st floor: add 1 bedroom, 1 bath, laundry, familyroom. 2nd flr: stairs, enlarge kitchen, 1/2 back, deck, 3rd fl: new bath, remove 1 bedroom | $200,000 |
| Jan 4, 2008 | Completed final sign-off Jan 2009 | 901 Union St | this project includes a structural strengthening of the (e) garage level and interior remodel of each of the six units above. the garage will receive partial new slab on grade. in each of the dwelling units, an open plan with new kitchen, dining and living areas will be provided. there will beDetails
this project includes a structural strengthening of the (e) garage level and interior remodel of each of the six units above. the garage will receive partial new slab on grade. in each of the dwelling units, an open plan with new kitchen, dining and living areas will be provided. there will be | $350,000 |
| Dec 5, 2007 | Never finaled issued Dec 2007, no final | 176 Merced Av | full remodel of kitchen and bathroom, replacement of all appliances, cabinetry, floor covering toilet, sink, etc. non-structural.Details
full remodel of kitchen and bathroom, replacement of all appliances, cabinetry, floor covering toilet, sink, etc. non-structural. | $34,000 |
| Sep 18, 2007 | Never finaled issued Sep 2007, no final | 531 Precita Av | remodel of 2 bathrooms and a kitchen changing out of all fixtures and cabinets, replacement of appliances moving of plmg, and elec. as needed. work to be done in 531. bathroom lighting to be flourescent or on occupant sensor. 50% of wattage of kitchen lighting to be flourencentDetails
remodel of 2 bathrooms and a kitchen changing out of all fixtures and cabinets, replacement of appliances moving of plmg, and elec. as needed. work to be done in 531. bathroom lighting to be flourescent or on occupant sensor. 50% of wattage of kitchen lighting to be flourencent | $25,000 |
| Apr 27, 2007 | Expired or cancelled expired Jan 2010 | 195 Eureka St | renovate kitchen and bath. create opening in wall between kitchen and living room. expand bathroom into current panty areaDetails
renovate kitchen and bath. create opening in wall between kitchen and living room. expand bathroom into current panty area | $36,000 |
| Apr 10, 2007 | Completed final sign-off Aug 2007 | 531 Andover St | non structural kitchen remodel, new plumbing fixtures, appliances, lighting fixtures, tile, countertops, cabinets and painting, pantry area to be converted to laundry area.Details
non structural kitchen remodel, new plumbing fixtures, appliances, lighting fixtures, tile, countertops, cabinets and painting, pantry area to be converted to laundry area. | $30,000 |
| Feb 16, 2007 | Completed final sign-off Apr 2007 | 541 Gates St | basic kitchen remodel, cabinet replacement, countertop replacement, all new appliances etc no open wall work. no kitchen sink changed, no lighting changeDetails
basic kitchen remodel, cabinet replacement, countertop replacement, all new appliances etc no open wall work. no kitchen sink changed, no lighting change | $4,000 |
| Dec 7, 2006 | Completed final sign-off Feb 2008 | 4135 23rd St | rear horizontal addition @ 1st, 2nd & 3rd flrs. demolition of (e) rear deck & construction of new wood deck. replacement of (e) vinyl windows with wood & clad windows. conversion of part of garage to habitable space. interior remodel including kitchen, bathrooms & (n) interior stair from 1st to 2ndDetails
rear horizontal addition @ 1st, 2nd & 3rd flrs. demolition of (e) rear deck & construction of new wood deck. replacement of (e) vinyl windows with wood & clad windows. conversion of part of garage to habitable space. interior remodel including kitchen, bathrooms & (n) interior stair from 1st to 2nd | $150,000 |
| Sep 13, 2006 | Completed final sign-off Nov 2007 | 587 Pennsylvania Av | interior and exterior remodel, attic conversion,new dormers, new windows,new interior stairs,kitchen and bathroom,living area remodel.Details
interior and exterior remodel, attic conversion,new dormers, new windows,new interior stairs,kitchen and bathroom,living area remodel. | $150,000 |
| Aug 4, 2006 | Completed final sign-off Dec 2006 | 757 Page St | non structural kitchen remodel - new countertops, new cabinets, new insulation, new pocket door, new hardwood floors, replacing appliances into same. no structural work.Details
non structural kitchen remodel - new countertops, new cabinets, new insulation, new pocket door, new hardwood floors, replacing appliances into same. no structural work. | $9,000 |
| Jun 30, 2006 | Completed final sign-off Nov 2006 | 952 Greenwich St | small kitchen remodel, replacement of cabinets, new electrical, countertop, new sink-non structural.Details
small kitchen remodel, replacement of cabinets, new electrical, countertop, new sink-non structural. | $15,000 |
| Jun 20, 2006 | Completed final sign-off Apr 2007 | 241 Ashbury St | non structural kitchen remodel, moving gas line for stove, new plumbing for dishwasher, sink, refrigerator. flourescent light.unit#2Details
non structural kitchen remodel, moving gas line for stove, new plumbing for dishwasher, sink, refrigerator. flourescent light.unit#2 | $28,000 |
| Jun 14, 2006 | Completed final sign-off Apr 2007 | 26 Atalaya Tr | new 3rd floor 1 kitchen renovation to include new cabinets, counters, finishes electrical & lighting. replace (e) kitchen rear exterior 1 door, new transome window above. glazing to be safty glass x header to be 4 x 6 min.Details
new 3rd floor 1 kitchen renovation to include new cabinets, counters, finishes electrical & lighting. replace (e) kitchen rear exterior 1 door, new transome window above. glazing to be safty glass x header to be 4 x 6 min. | $47,600 |
| Mar 30, 2006 | Expired or cancelled expired Apr 2007 | 207 San Juan Av | remodel existing kitchen - new kitchen cabinets, counter top, upgrade electrical, plumbing & new appliances. replace floor coverings.Details
remodel existing kitchen - new kitchen cabinets, counter top, upgrade electrical, plumbing & new appliances. replace floor coverings. | $40,000 |
| Mar 27, 2006 | Completed final sign-off Feb 2007 | 1893 San Jose Av | remodel 2 bathrooms & kitchen upstairs. remodel bathroom down stairs. non-structural remodel-new units, cabinets, floor upgrade elctrical, plumbing.Details
remodel 2 bathrooms & kitchen upstairs. remodel bathroom down stairs. non-structural remodel-new units, cabinets, floor upgrade elctrical, plumbing. | $25,000 |
| Mar 9, 2006 | Completed final sign-off Aug 2006 | 57 Jersey St | remodel existing kitchen.non structural.replace cabinets,update electrical,plumbing,cabinets,countertop, floor.Details
remodel existing kitchen.non structural.replace cabinets,update electrical,plumbing,cabinets,countertop, floor. | $15,180 |
| Mar 3, 2006 | Completed final sign-off Sep 2006 | 872 Chestnut St | remodel kitchen, non structural, no change to existing walls, replace lath & plaster replace all kitchen cabs, install new cabs & new flooring, nwe units, dishwasher/fridge sinksDetails
remodel kitchen, non structural, no change to existing walls, replace lath & plaster replace all kitchen cabs, install new cabs & new flooring, nwe units, dishwasher/fridge sinks | $12,900 |
| Feb 1, 2006 | Never finaled issued Feb 2006, no final | 65 Webster St | front bldg - remove sheetrock,bathroom & kitchen fixtures (open up a few area to explore structural layout). not to exceed 300 sq ft area total.Details
front bldg - remove sheetrock,bathroom & kitchen fixtures (open up a few area to explore structural layout). not to exceed 300 sq ft area total. | $5,000 |
| Nov 10, 2005 | Completed final sign-off Jun 2006 | 459 Potrero Av | remodel kitchen & 2 bathrooms.non structural. remove existing cabinets & appliances.replace with new, upgrade plumbing & electricalDetails
remodel kitchen & 2 bathrooms.non structural. remove existing cabinets & appliances.replace with new, upgrade plumbing & electrical | $25,000 |
| Nov 8, 2005 | Expired or cancelled expired Feb 2010 | 3351 Clay St | reduction in scope of work. removal of the column of headers, which were to be installed between closets & rear bedroom from the permit. change from glue lam beem to street headers in front of building between (e) kitchen & living room.Details
reduction in scope of work. removal of the column of headers, which were to be installed between closets & rear bedroom from the permit. change from glue lam beem to street headers in front of building between (e) kitchen & living room. | |
| Sep 29, 2005 | Completed final sign-off Mar 2006 | 1635 Castro St | remodel kitchen, new cabinets, new electrical, new plumbing (see plans attached). create an opening on the wall between the kitchen and dinning room.Details
remodel kitchen, new cabinets, new electrical, new plumbing (see plans attached). create an opening on the wall between the kitchen and dinning room. | $16,000 |
| Sep 15, 2005 | Completed final sign-off Mar 2006 | 3960 19th St | remodel of (e)kitchen,non structural,new kitchen cabinets,countertop,upgrade electrical & plumbing,Details
remodel of (e)kitchen,non structural,new kitchen cabinets,countertop,upgrade electrical & plumbing, | $12,500 |
| Aug 3, 2005 | Completed final sign-off Jun 2006 | 1200 Page St | remodel 2 kitchen and bath 4 baths. no structural. reroof and repaint. work in both units. provideDetails
remodel 2 kitchen and bath 4 baths. no structural. reroof and repaint. work in both units. provide | $60,000 |
| May 24, 2005 | Completed final sign-off Oct 2005 | 241 Ashbury St | new kitchen, remove existing kitchen, non structural remodel, new electrical panel, upgrade plumbingDetails
new kitchen, remove existing kitchen, non structural remodel, new electrical panel, upgrade plumbing | $13,350 |
| May 24, 2005 | Expired or cancelled expired Jan 2014 | 686 24th Av | remodel kitchen, non structural changes, remove existing kitchen install new cabinets & new sink, inDetails
remodel kitchen, non structural changes, remove existing kitchen install new cabinets & new sink, in | $12,000 |
| May 24, 2005 | Completed final sign-off Sep 2005 | 176 Tiffany Av | kitchen remodel, this is non structural remodel remove existing kitchen, re-install new kitchen in sDetails
kitchen remodel, this is non structural remodel remove existing kitchen, re-install new kitchen in s | $12,500 |
| Feb 3, 2005 | Never finaled issued Feb 2005, no final | 616 Noe St | remodel kitchen & bath.remove lath&plaster walls & ceiling of bathrooms.remove postion of wall......Details
remodel kitchen & bath.remove lath&plaster walls & ceiling of bathrooms.remove postion of wall...... | $10,000 |
| May 14, 2004 | Never finaled issued May 2004, no final | 1080 Chestnut St | non structural remodel of kitchen & two bathrooms. new cabs, shower, toilets, sinks, electrical outlDetails
non structural remodel of kitchen & two bathrooms. new cabs, shower, toilets, sinks, electrical outl | $35,000 |
| Aug 18, 2003 | Completed final sign-off Nov 2003 | 1935 Jackson St | kitchen remodel, new cabinet. new drywall some new plubing, new elctrical. and no structual changeDetails
kitchen remodel, new cabinet. new drywall some new plubing, new elctrical. and no structual change | $15,000 |
| May 28, 2003 | Expired or cancelled expired Mar 2006 | 3480 17th St | interior non-structural remodel, 2 full bath,1 1/2 bath, remodel kitchen, move sink/new tiles & cabiDetails
interior non-structural remodel, 2 full bath,1 1/2 bath, remodel kitchen, move sink/new tiles & cabi | $23,000 |
| Feb 26, 2003 | Expired or cancelled expired Mar 2004 | 937 Valencia St | kitchen remodle . new cabinets. new drywall, some new plumbing, new electricalDetails
kitchen remodle . new cabinets. new drywall, some new plumbing, new electrical | $12,000 |
| Feb 26, 2003 | Completed final sign-off Jun 2003 | 1931 Jackson St | kitchen remodel new drywall new tile, new cabinets. resesed canes for lighting electrical, new plumbDetails
kitchen remodel new drywall new tile, new cabinets. resesed canes for lighting electrical, new plumb | $29,000 |
| Oct 27, 2000 | Completed final sign-off Mar 2002 | 4023 25th St | demolition of 2 bathrooms & 1 kitchenDetails
demolition of 2 bathrooms & 1 kitchen | $500 |