- 0 permits filed
41 permits since 2000: 37 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
17 bathroom remodel permits: 17 completed. Typically 0 days from filing to permit and 44 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 7, 2021 | Completed final sign-off Jan 2022 | 100 Quintara St | 4 window replacement same size and location,facing yard uf lo.3. 1 french door replacement. same size location. facing backyard. 1 window at gr fl bathroom to face side of house, not street facing uf lo.3.Details
4 window replacement same size and location,facing yard uf lo.3. 1 french door replacement. same size location. facing backyard. 1 window at gr fl bathroom to face side of house, not street facing uf lo.3. | $21,200 |
| Jan 18, 2019 | Completed final sign-off Jul 2022 | 85 Midcrest Wy | add (1) bath, closet & family room under (e) bldg portion that is elevated from ground by column. add interior stair. add an exterior door, guard-height wall & steps on the side of the proposed addition. add gates.Details
add (1) bath, closet & family room under (e) bldg portion that is elevated from ground by column. add interior stair. add an exterior door, guard-height wall & steps on the side of the proposed addition. add gates. | $150,000 |
| Mar 19, 2018 | Completed final sign-off May 2018 | 520 South Van Ness Av | remodel bathroom replace toilet, shower stall & vanity sink in unit#157. n/a for maher.Details
remodel bathroom replace toilet, shower stall & vanity sink in unit#157. n/a for maher. | $15,000 |
| Feb 21, 2018 | Completed final sign-off Mar 2018 | 1011 Howard St | replace and install grab bars in hotel bathroom public 3c; n/a maherDetails
replace and install grab bars in hotel bathroom public 3c; n/a maher | $3,000 |
| Feb 21, 2018 | Completed final sign-off Mar 2018 | 34 06th St | install or replace grab bars in shower tub bathroom in units 102, 203.Details
install or replace grab bars in shower tub bathroom in units 102, 203. | $3,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2018 | 520 South Van Ness Av | units 111, 112 & 139c: install grab bars in unit bath tub areas, maher ord 155-13 naDetails
units 111, 112 & 139c: install grab bars in unit bath tub areas, maher ord 155-13 na | $4,000 |
| Nov 30, 2017 | Completed final sign-off Feb 2018 | 405 Valencia St | units 204 & 508: install grab bars in unit bath tub areas, maher ord 155-13 naDetails
units 204 & 508: install grab bars in unit bath tub areas, maher ord 155-13 na | $4,000 |
| Nov 1, 2017 | Completed final sign-off Feb 2018 | 74 06th St | remove tile from 2nd & 3rd floor shower stall, remove any dryrot in framing, replace shower valve and re-ajust floor drain. replace old receptacles and light switches, replace exhaust fan in kind in room 343 & 330. remodel 2 bathrooms, to comply with nov# 2017400241Details
remove tile from 2nd & 3rd floor shower stall, remove any dryrot in framing, replace shower valve and re-ajust floor drain. replace old receptacles and light switches, replace exhaust fan in kind in room 343 & 330. remodel 2 bathrooms, to comply with nov# 2017400241 | $30,000 |
| Oct 24, 2017 | Completed final sign-off Dec 2017 | 2039 47th Av | comply with nov 201774754 - provide 1 hr rated wall & ceiling assemblies in (e) garage. legalize unpermitted work done by previous owner including family room, bath #2 and storage. electrical work will be performed under separate permit e201703273833Details
comply with nov 201774754 - provide 1 hr rated wall & ceiling assemblies in (e) garage. legalize unpermitted work done by previous owner including family room, bath #2 and storage. electrical work will be performed under separate permit e201703273833 | $8,000 |
| Aug 24, 2017 | Completed final sign-off Sep 2017 | 520 South Van Ness Av | 1/f - 1 bathroom - remove & replace tiles in bathroom & shower floor ; installl new wax ring on toilet. install new waterproofing on floorDetails
1/f - 1 bathroom - remove & replace tiles in bathroom & shower floor ; installl new wax ring on toilet. install new waterproofing on floor | $14,000 |
| Jun 27, 2017 | Completed final sign-off Jul 2017 | 74 06th St | remove and replacee tile in shower/bathroom floor on 3rd floorDetails
remove and replacee tile in shower/bathroom floor on 3rd floor | $6,800 |
| Feb 14, 2017 | Completed final sign-off Mar 2017 | 2791 16th St | to comply with notice of violation #201465801: install grab bars in common area water closets lavatories and bath facilities to comply with ordinance 4 shower, 6 water closetsDetails
to comply with notice of violation #201465801: install grab bars in common area water closets lavatories and bath facilities to comply with ordinance 4 shower, 6 water closets | $3,000 |
| Jan 31, 2017 | Completed final sign-off Feb 2017 | 1011 Howard St | install shower grab bars in 6 bathroom units.Details
install shower grab bars in 6 bathroom units. | $3,000 |
| Jun 17, 2011 | Completed final sign-off Sep 2011 | 740 Diamond St | remodel kitchen cabinets, floor, move rough plumbing, paint and change header from kitchen to dining area. add island cabinet, add half bath on 2nd level and remodel bathroom at 3rd floor (no wall relocation). add door to rear deck and repatch wall holes where damaged and paint thru out house.Details
remodel kitchen cabinets, floor, move rough plumbing, paint and change header from kitchen to dining area. add island cabinet, add half bath on 2nd level and remodel bathroom at 3rd floor (no wall relocation). add door to rear deck and repatch wall holes where damaged and paint thru out house. | $40,000 |
| Sep 29, 2010 | Completed final sign-off Nov 2010 | 1001 Pine St | replace bath tub shower tile and shower valve, no door; no window and no wall work on this permitDetails
replace bath tub shower tile and shower valve, no door; no window and no wall work on this permit | $6,000 |
| Sep 27, 2010 | Completed final sign-off Dec 2010 | 1001 Pine St | remodel bathroom tile, tub, vanity sink and light fixture, replacement upgrade electrical gfi and change shower valve, remodel kitchen replacement cabinets and counter tops, upgrade electrical to gfi and new floorings and wall replacementDetails
remodel bathroom tile, tub, vanity sink and light fixture, replacement upgrade electrical gfi and change shower valve, remodel kitchen replacement cabinets and counter tops, upgrade electrical to gfi and new floorings and wall replacement | $17,000 |
| Jun 1, 2010 | Completed final sign-off Jul 2010 | 1001 Pine St | remodel one bathroom, remove plaster wall, repl w/cement broad) and tile shower, remove toilet vanity and sink, repl all including floor tile, repl all w ith additional channel to support new cement board, no new lightin, no structural workDetails
remodel one bathroom, remove plaster wall, repl w/cement broad) and tile shower, remove toilet vanity and sink, repl all including floor tile, repl all w ith additional channel to support new cement board, no new lightin, no structural work | $6,274 |