Back to kitchen remodel contractors
G C Builders
- Based in
- Berkeley
- On San Francisco permits
- Jun 2010 to Mar 2022
- Last 24 months
- 0 permits filed
41 permits since 2000: 37 completed, 3 never finaled, 1 expired or cancelled.
Of the 3 never-finaled permits, 3 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
2 kitchen remodel permits: 2 completed. Typically 0 days from filing to permit and 84 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 17, 2011 | Completed final sign-off Sep 2011 | 740 Diamond St | remodel kitchen cabinets, floor, move rough plumbing, paint and change header from kitchen to dining area. add island cabinet, add half bath on 2nd level and remodel bathroom at 3rd floor (no wall relocation). add door to rear deck and repatch wall holes where damaged and paint thru out house.Details
remodel kitchen cabinets, floor, move rough plumbing, paint and change header from kitchen to dining area. add island cabinet, add half bath on 2nd level and remodel bathroom at 3rd floor (no wall relocation). add door to rear deck and repatch wall holes where damaged and paint thru out house. | $40,000 |
| Sep 27, 2010 | Completed final sign-off Dec 2010 | 1001 Pine St | remodel bathroom tile, tub, vanity sink and light fixture, replacement upgrade electrical gfi and change shower valve, remodel kitchen replacement cabinets and counter tops, upgrade electrical to gfi and new floorings and wall replacementDetails
remodel bathroom tile, tub, vanity sink and light fixture, replacement upgrade electrical gfi and change shower valve, remodel kitchen replacement cabinets and counter tops, upgrade electrical to gfi and new floorings and wall replacement | $17,000 |