Back to kitchen remodel contractors
Francies Construction Inc
- Based in
- Placerville
- On San Francisco permits
- Sep 2008 to Apr 2025
- Last 24 months
- 3 permits filed
34 permits since 2000: 27 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
8 kitchen remodel permits: 5 completed, 2 never finaled, 1 expired or cancelled. Typically 11 days from filing to permit and 135 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2025 | Completed final sign-off Feb 2026 | 30 Perego Tr | replace (e) gas furnace with (n) air handler and outdoor condenser unit. remodel (e) 3rd fl (no structural work). remodel bathroom & kitchen. replace (e) sliding doors (match size to existing) add new skylights on third floor.Details
replace (e) gas furnace with (n) air handler and outdoor condenser unit. remodel (e) 3rd fl (no structural work). remodel bathroom & kitchen. replace (e) sliding doors (match size to existing) add new skylights on third floor. | $95,000 |
| Jul 15, 2024 | Expired or cancelled expired May 2026 | 4055 25th St | revision to permit 202310199063. remodel existing kitchen and laundry room on 1/f.Details
revision to permit 202310199063. remodel existing kitchen and laundry room on 1/f. | $15,000 |
| Jul 25, 2023 | Completed final sign-off Dec 2023 | 414 Collingwood St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $50,000 |
| Jul 6, 2023 | Completed final sign-off Dec 2023 | 414 Collingwood St | between kitchen and dining room, widen door opening and replace door.Details
between kitchen and dining room, widen door opening and replace door. | $1,000 |
| Jul 6, 2022 | Never finaled issued Jul 2022, no final | 1718 Great Hy | in kind kitchen and bathroom remodelDetails
in kind kitchen and bathroom remodel | $50,000 |
| Sep 8, 2020 | Completed final sign-off Jul 2023 | 1857 Church St | kitchen & bath remodel, selective demo & build back (e) spaces. no work to front facade. mep under seperate permit. vertical/horizontal expansion of (e) building envelope. demo rear sunroom structure & construct new 2-story 352 sq ft crate breakfast nook, remodel bathroom, create garden storage areaDetails
kitchen & bath remodel, selective demo & build back (e) spaces. no work to front facade. mep under seperate permit. vertical/horizontal expansion of (e) building envelope. demo rear sunroom structure & construct new 2-story 352 sq ft crate breakfast nook, remodel bathroom, create garden storage area | $95,700 |
| Dec 31, 2019 | Never finaled issued Aug 2023, no final | 533 Union St | legalize one unit on 1st floor with: one bedroom & two bathroom, two home offices, media room, with kitchen per legalization program ordinane no. 43-14.Details
legalize one unit on 1st floor with: one bedroom & two bathroom, two home offices, media room, with kitchen per legalization program ordinane no. 43-14. | $85,000 |
| Feb 12, 2013 | Completed final sign-off Mar 2013 | 3301 Broderick St | work in unit 104: kitchen remodel - change cabinets, add dishwasher, add outlets to counter, add 2 utility circuits, tile floor. bathroom remodel - re-tile, new shower valve, new toilet supply, add exhaust fan, move sub-panel out of closet.Details
work in unit 104: kitchen remodel - change cabinets, add dishwasher, add outlets to counter, add 2 utility circuits, tile floor. bathroom remodel - re-tile, new shower valve, new toilet supply, add exhaust fan, move sub-panel out of closet. | $16,000 |