Back to bathroom remodel contractors
Francies Construction Inc
- Based in
- Placerville
- On San Francisco permits
- Sep 2008 to Apr 2025
- Last 24 months
- 3 permits filed
34 permits since 2000: 27 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
14 bathroom remodel permits: 12 completed, 2 never finaled. Typically 0 days from filing to permit and 102 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2025 | Completed final sign-off Feb 2026 | 30 Perego Tr | replace (e) gas furnace with (n) air handler and outdoor condenser unit. remodel (e) 3rd fl (no structural work). remodel bathroom & kitchen. replace (e) sliding doors (match size to existing) add new skylights on third floor.Details
replace (e) gas furnace with (n) air handler and outdoor condenser unit. remodel (e) 3rd fl (no structural work). remodel bathroom & kitchen. replace (e) sliding doors (match size to existing) add new skylights on third floor. | $95,000 |
| Mar 25, 2025 | Completed final sign-off May 2025 | 1990 Green St | in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s).Details
in-kind remodeling of 1 bathroom(s) in 2nd fl with 0 shower pan(s). | $15,000 |
| Jul 25, 2023 | Completed final sign-off Dec 2023 | 414 Collingwood St | in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s).Details
in-kind remodeling of 1 kitchen(s) in 1st fl and in-kind remodeling of 1 bathroom(s) in 1st fl with 0 shower pan(s). | $50,000 |
| Jul 6, 2022 | Never finaled issued Jul 2022, no final | 1718 Great Hy | in kind kitchen and bathroom remodelDetails
in kind kitchen and bathroom remodel | $50,000 |
| Sep 8, 2020 | Completed final sign-off Jul 2023 | 1857 Church St | kitchen & bath remodel, selective demo & build back (e) spaces. no work to front facade. mep under seperate permit. vertical/horizontal expansion of (e) building envelope. demo rear sunroom structure & construct new 2-story 352 sq ft crate breakfast nook, remodel bathroom, create garden storage areaDetails
kitchen & bath remodel, selective demo & build back (e) spaces. no work to front facade. mep under seperate permit. vertical/horizontal expansion of (e) building envelope. demo rear sunroom structure & construct new 2-story 352 sq ft crate breakfast nook, remodel bathroom, create garden storage area | $95,700 |
| Jul 29, 2020 | Completed final sign-off Oct 2020 | 414 Collingwood St | bathroom remodel in kind. replacement of damaged plaster in hallway.Details
bathroom remodel in kind. replacement of damaged plaster in hallway. | $25,000 |
| Dec 31, 2019 | Never finaled issued Aug 2023, no final | 533 Union St | legalize one unit on 1st floor with: one bedroom & two bathroom, two home offices, media room, with kitchen per legalization program ordinane no. 43-14.Details
legalize one unit on 1st floor with: one bedroom & two bathroom, two home offices, media room, with kitchen per legalization program ordinane no. 43-14. | $85,000 |
| Oct 31, 2013 | Completed final sign-off Oct 2014 | 1835 Franklin St | install pocket door in non-bearing partition wall to replace (e) standard door, retile two bathrooms, floor & showers, re-do 2 shower pans, revise plumbing to accommodate 2 new washlet toilets, add electrical for 2 washlet, add outlet inside vanity.Details
install pocket door in non-bearing partition wall to replace (e) standard door, retile two bathrooms, floor & showers, re-do 2 shower pans, revise plumbing to accommodate 2 new washlet toilets, add electrical for 2 washlet, add outlet inside vanity. | $20,000 |
| Jun 6, 2013 | Completed final sign-off Jan 2014 | 3295 Clay St | unit #4: bathroom remodel, remove (e) shower stall, repl (e) tub, vanity & exhaust fan, tile tub surround and install tile floor w/under floor radiant heat, install 4 new recessed lights.Details
unit #4: bathroom remodel, remove (e) shower stall, repl (e) tub, vanity & exhaust fan, tile tub surround and install tile floor w/under floor radiant heat, install 4 new recessed lights. | $12,500 |
| Mar 27, 2013 | Completed final sign-off Jul 2013 | 1102 Fulton St | revision of pa# 201303182387. plans required - reconfiguration of powder room - wall up door way & create new doorway, add radiant fan on master bath, add stand alone shower & move tub.Details
revision of pa# 201303182387. plans required - reconfiguration of powder room - wall up door way & create new doorway, add radiant fan on master bath, add stand alone shower & move tub. | |
| Mar 18, 2013 | Completed final sign-off Jul 2013 | 1102 Fulton St | 1st floor - remodel of bathroom & powder room. in bathroom: add shower over existing tub, exhaust fan, tile floor. in powder rom: relcoate light & outlet, put in new vanity plumbing & toilet plumbing, sheetrock.Details
1st floor - remodel of bathroom & powder room. in bathroom: add shower over existing tub, exhaust fan, tile floor. in powder rom: relcoate light & outlet, put in new vanity plumbing & toilet plumbing, sheetrock. | $16,000 |
| Feb 12, 2013 | Completed final sign-off Mar 2013 | 3301 Broderick St | work in unit 104: kitchen remodel - change cabinets, add dishwasher, add outlets to counter, add 2 utility circuits, tile floor. bathroom remodel - re-tile, new shower valve, new toilet supply, add exhaust fan, move sub-panel out of closet.Details
work in unit 104: kitchen remodel - change cabinets, add dishwasher, add outlets to counter, add 2 utility circuits, tile floor. bathroom remodel - re-tile, new shower valve, new toilet supply, add exhaust fan, move sub-panel out of closet. | $16,000 |
| Dec 10, 2008 | Completed final sign-off Jan 2009 | 71 06th Av | bathroom remodel move tub location, move toilet & vanity location, remove & add wall between laundry & bathroom. move door way & change swing, intall 5 recessed lights, 1 gfi outlet, 1 vent fan & 2 switches, sheetrock walls & ceiling, tile floor. tub surround & wain coat ht. on walls.Details
bathroom remodel move tub location, move toilet & vanity location, remove & add wall between laundry & bathroom. move door way & change swing, intall 5 recessed lights, 1 gfi outlet, 1 vent fan & 2 switches, sheetrock walls & ceiling, tile floor. tub surround & wain coat ht. on walls. | $15,000 |
| Sep 4, 2008 | Completed final sign-off Oct 2008 | 608 12th Av | bathroom remodel. put in pocket door between w/c and bath, consolidate separate tub and shower into combo shower over tub. add 2 outlets, fanlight, and 2 sconces. sheetrock and tile (floor and surround)Details
bathroom remodel. put in pocket door between w/c and bath, consolidate separate tub and shower into combo shower over tub. add 2 outlets, fanlight, and 2 sconces. sheetrock and tile (floor and surround) | $18,000 |