Francies Construction Inc
- Based in
- Placerville
- On San Francisco permits
- Sep 2008 to Apr 2025
- Last 24 months
- 3 permits filed
34 permits since 2000: 27 completed, 1 in progress, 3 never finaled, 3 expired or cancelled.
Of the 3 never-finaled permits, 3 are 3 to 5 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
2 deck permits: 2 completed. Typically 0 days from filing to permit and 90 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 17, 2014 | Completed final sign-off Oct 2014 | 120 Funston Av | build new deck 18'x9'x +/- 9' above ground. remove existing window and replace with a french door, replace 1 window with new of same size. replace 2nd window with a single doorDetails
build new deck 18'x9'x +/- 9' above ground. remove existing window and replace with a french door, replace 1 window with new of same size. replace 2nd window with a single door | $20,000 |
| Apr 3, 2014 | Completed final sign-off Apr 2014 | 14 Macondray Ln | stair & deck dry rot repair. remove dect tip boards and correct deck slope and replace deck boards. stair dry rot repair to a few treads less than 50% not visable from streetDetails
stair & deck dry rot repair. remove dect tip boards and correct deck slope and replace deck boards. stair dry rot repair to a few treads less than 50% not visable from street | $7,000 |