Forsythe General Contractors
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Apr 2025
- Last 24 months
- 2 permits filed
128 permits since 2000: 81 completed, 3 in progress, 19 never finaled, 25 expired or cancelled.
Of the 19 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for roof deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Roof deck permits
5 roof deck permits: 4 completed, 1 expired or cancelled. Typically 147 days from filing to permit and 530 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 8, 2015 | Expired or cancelled expired Apr 2019 | 1110 Green St | new exterior stair for roof access. change of slope @ (e) roof section near (e) elevator. new roof deck with 4'h glass parapet added. new balcony of rear bedroomDetails
new exterior stair for roof access. change of slope @ (e) roof section near (e) elevator. new roof deck with 4'h glass parapet added. new balcony of rear bedroom | $67,600 |
| Jul 30, 2014 | Completed final sign-off Jun 2016 | 2725 Pacific Av | addition to extg roof deck. 2nd egress. hot tub on new deck. glass guard rail.Details
addition to extg roof deck. 2nd egress. hot tub on new deck. glass guard rail. | $88,500 |
| Apr 28, 2014 | Completed final sign-off Aug 2016 | 412 Lombard St | revision to 201102220706 : new hottub at roof deck. new gas vented fire place at 2nd fl. new tempered glass wall in hallway at 1st fl. at basement level, 3 pipe stubs for future bath,revise shape of wine cellar wall. structural changes 1,2, roof,west prop line wall. no exterior changes to facade.Details
revision to 201102220706 : new hottub at roof deck. new gas vented fire place at 2nd fl. new tempered glass wall in hallway at 1st fl. at basement level, 3 pipe stubs for future bath,revise shape of wine cellar wall. structural changes 1,2, roof,west prop line wall. no exterior changes to facade. | $5,000 |
| Mar 14, 2013 | Completed final sign-off Jun 2014 | 2725 Pacific Av | rear yard only. proposed new roof deck 499 sq. ft. proposed new steel stairs from 3rd level to 3rd level roof. new exterior lighting.Details
rear yard only. proposed new roof deck 499 sq. ft. proposed new steel stairs from 3rd level to 3rd level roof. new exterior lighting. | $100,000 |
| Oct 7, 2008 | Completed final sign-off Jun 2011 | 1546 19th St | horizontal addition to an (e) single family residence which includes the expansion of both levels of the residence. a new roof deck and stairsDetails
horizontal addition to an (e) single family residence which includes the expansion of both levels of the residence. a new roof deck and stairs | $300,000 |