Back to bathroom remodel contractors
Forsythe General Contractors
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Apr 2025
- Last 24 months
- 2 permits filed
128 permits since 2000: 81 completed, 3 in progress, 19 never finaled, 25 expired or cancelled.
Of the 19 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
25 bathroom remodel permits: 18 completed, 2 in progress, 1 never finaled, 4 expired or cancelled. Typically 4 days from filing to permit and 370 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 5, 2025 | In progress issued Jun 2025 | 175 Saint Germain Av | revision to bpa# 202404190359: lower level bathroom renovation, fixtures to be replaced in kind. 1/f kitchen renovation. 2/f bedroom and bathroom renovation. new skylights at roof. new hvac system and electrical system upgrades. exterior patching in kind replacement of cladding as needed.Details
revision to bpa# 202404190359: lower level bathroom renovation, fixtures to be replaced in kind. 1/f kitchen renovation. 2/f bedroom and bathroom renovation. new skylights at roof. new hvac system and electrical system upgrades. exterior patching in kind replacement of cladding as needed. | $100,000 |
| May 2, 2024 | Completed final sign-off May 2025 | 3943 19th St | primary bathroom remove and refinishes in kind due to water damage.Details
primary bathroom remove and refinishes in kind due to water damage. | $20,000 |
| Apr 19, 2024 | In progress issued May 2024 | 175 Saint Germain Av | lower level bathroom renovation, fixtures to be replaced in kind. new laundry fitness room. remodel den. convert "studio" space to bedroom.Details
lower level bathroom renovation, fixtures to be replaced in kind. new laundry fitness room. remodel den. convert "studio" space to bedroom. | $45,000 |
| May 28, 2021 | Completed final sign-off Feb 2022 | 1500 Cole St | bathroom renovation includes: removal of (e) full bath & closet, rebuild powder room off of hallway. rebuild bedroom closet, (n) full bath of off bedroom. all work is on the 2nd flr.Details
bathroom renovation includes: removal of (e) full bath & closet, rebuild powder room off of hallway. rebuild bedroom closet, (n) full bath of off bedroom. all work is on the 2nd flr. | $13,000 |
| Dec 1, 2020 | Completed final sign-off Nov 2022 | 76 Montcalm St | revision to pa# 201411141573. reduced scope of work: reduce proposed floor area (1912sf to 1709sf). eliminate approved 11.5"lx9.5"wx9.5"h horizontal addition at 3rd fl. revise window sizes & adjust floor plan. (relocate stairways & 3rd fl bathroom) to accomodate decreased area.Details
revision to pa# 201411141573. reduced scope of work: reduce proposed floor area (1912sf to 1709sf). eliminate approved 11.5"lx9.5"wx9.5"h horizontal addition at 3rd fl. revise window sizes & adjust floor plan. (relocate stairways & 3rd fl bathroom) to accomodate decreased area. | |
| Feb 28, 2020 | Completed final sign-off May 2021 | 3035 Pierce St | interior remodel 503 sq fr e conditioned basement w interior addition of 277 sq ft new conditioned space. remodel e bath, laundry rm, family rm, new guest beeroom, rebuild stairs in sideyard enlarge window wellDetails
interior remodel 503 sq fr e conditioned basement w interior addition of 277 sq ft new conditioned space. remodel e bath, laundry rm, family rm, new guest beeroom, rebuild stairs in sideyard enlarge window well | $200,000 |
| Dec 18, 2019 | Completed final sign-off Aug 2020 | 760 San Jose Av | interior residential renovation invluding renovate kitchen, new partitions, structural work, new lighting, new finishes & fixtures. no exterior work. interior remodel, open stairs between levels, room on ground floor with full bath and 3-foot wet bar with 12" sink.Details
interior residential renovation invluding renovate kitchen, new partitions, structural work, new lighting, new finishes & fixtures. no exterior work. interior remodel, open stairs between levels, room on ground floor with full bath and 3-foot wet bar with 12" sink. | $75,000 |
| Dec 7, 2017 | Completed final sign-off Aug 2021 | 526 Duncan St | addition of study/room at rear of (e) single family house. renovation of (e) water closet to full bath at entry doorDetails
addition of study/room at rear of (e) single family house. renovation of (e) water closet to full bath at entry door | $300,000 |
| Dec 19, 2016 | Expired or cancelled withdrawn Aug 2019 | 1475 04th St | erect a one story type 5 construction bath house/day spa*Details
erect a one story type 5 construction bath house/day spa* | $1,500,000 |
| Jun 27, 2016 | Expired or cancelled expired Apr 2019 | 1110 Green St | renovation of an existing single family residence rearrange bathroom fixture(s), enlarge window(s) at the front & rear.Details
renovation of an existing single family residence rearrange bathroom fixture(s), enlarge window(s) at the front & rear. | $30,000 |
| Jul 20, 2015 | Completed final sign-off Feb 2017 | 1559 Willard St | upper flr int. remodel including add 2 new bedrooms & 1 bath, door replacement & window removal, door installation @ rear. 951 s.f. of (e) 1st floor to become habitable including move kitchen, living to lower level. add 1/2 bath + mech rm, foundation. replacement (n) shear walls. footprint unchangeDetails
upper flr int. remodel including add 2 new bedrooms & 1 bath, door replacement & window removal, door installation @ rear. 951 s.f. of (e) 1st floor to become habitable including move kitchen, living to lower level. add 1/2 bath + mech rm, foundation. replacement (n) shear walls. footprint unchange | $550,000 |
| Sep 17, 2014 | Completed final sign-off Jun 2016 | 420 El Camino Del Mar | interior renovation of bathrooms & kitchen. window replacement. conversion of existing unfinished 1st floor into finished 1st floor, voluntary seismic structural upgrade.Details
interior renovation of bathrooms & kitchen. window replacement. conversion of existing unfinished 1st floor into finished 1st floor, voluntary seismic structural upgrade. | $450,000 |
| Apr 28, 2014 | Completed final sign-off Aug 2016 | 412 Lombard St | revision to 201102220706 : new hottub at roof deck. new gas vented fire place at 2nd fl. new tempered glass wall in hallway at 1st fl. at basement level, 3 pipe stubs for future bath,revise shape of wine cellar wall. structural changes 1,2, roof,west prop line wall. no exterior changes to facade.Details
revision to 201102220706 : new hottub at roof deck. new gas vented fire place at 2nd fl. new tempered glass wall in hallway at 1st fl. at basement level, 3 pipe stubs for future bath,revise shape of wine cellar wall. structural changes 1,2, roof,west prop line wall. no exterior changes to facade. | $5,000 |
| Jan 3, 2014 | Never finaled issued Jan 2014, no final | 945 Green St | #7- minor bath remodel, new tile in shower, replace shower valves, no change on walls.Details
#7- minor bath remodel, new tile in shower, replace shower valves, no change on walls. | $15,000 |
| Nov 18, 2013 | Completed final sign-off Aug 2016 | 412 Lombard St | revision to app#200811076053, which is a residential remodel. scope of work for this revision includes interior changes of e. staircase, e- hallway, 2e bathrooms, e. storage room and e. master suite. change of hallway space to study on level 3. no change to front facade.Details
revision to app#200811076053, which is a residential remodel. scope of work for this revision includes interior changes of e. staircase, e- hallway, 2e bathrooms, e. storage room and e. master suite. change of hallway space to study on level 3. no change to front facade. | |
| Mar 27, 2012 | Completed final sign-off Apr 2013 | 1635 Green St | revision to appl #2010.0312.8122 - media room: addition of half bath & bar sink, remove media room lightwell. install skylight in hallway. ref pa #2012.0313.6009, 2008.0115.2525, 2010.0312.8122 & 2011.0114.8406.Details
revision to appl #2010.0312.8122 - media room: addition of half bath & bar sink, remove media room lightwell. install skylight in hallway. ref pa #2012.0313.6009, 2008.0115.2525, 2010.0312.8122 & 2011.0114.8406. | $3,000 |
| Feb 25, 2011 | Completed final sign-off Sep 2011 | 29 Ora Wy | master bathroom remodel, new finishes, no new walls, new fixtures, no moving walls, new electrical, high efficency lighting or occupancy sensor.Details
master bathroom remodel, new finishes, no new walls, new fixtures, no moving walls, new electrical, high efficency lighting or occupancy sensor. | $14,000 |
| Mar 16, 2010 | Completed final sign-off Apr 2010 | 2232 Green St | revision to app#200806104109 to show accurate scope of work. bath remodel new shower stall and tileDetails
revision to app#200806104109 to show accurate scope of work. bath remodel new shower stall and tile | |
| Nov 2, 2009 | Completed final sign-off Jan 2011 | 862 Pacheco St | dryrot repair and new surfaces at e deck. replace deck joist in kind at deck and surfaces with new cladding, landscape at front, new fixtures, surfaces at e bath, same location. replace e windows at kitchen and entry doorDetails
dryrot repair and new surfaces at e deck. replace deck joist in kind at deck and surfaces with new cladding, landscape at front, new fixtures, surfaces at e bath, same location. replace e windows at kitchen and entry door | $80,000 |
| Apr 30, 2009 | Completed final sign-off Oct 2009 | 313 Duncan St | replacement of kitchen cabinets. remodel master bath. same size & location of both kitchen & bath. no new wall. no modification of existing wall. all work is non structural only.Details
replacement of kitchen cabinets. remodel master bath. same size & location of both kitchen & bath. no new wall. no modification of existing wall. all work is non structural only. | $50,000 |
| Jun 10, 2008 | Expired or cancelled cancelled May 2010 | 2230 Green St | bath remodel, new shower stall, tileDetails
bath remodel, new shower stall, tile | $10,000 |
| Jan 24, 2007 | Completed final sign-off Dec 2007 | 765 Market St | remodel of two full bathrooms and installation of new kitchen cabinets. fluorescent lighting in one unit (#ph1e)Details
remodel of two full bathrooms and installation of new kitchen cabinets. fluorescent lighting in one unit (#ph1e) | $15,000 |
| Oct 3, 2005 | Completed final sign-off Jun 2006 | 50 Cameo Wy | 1st floor: replace (e) bath, add dressing room, replace windowsDetails
1st floor: replace (e) bath, add dressing room, replace windows | $50,000 |
| Nov 3, 2004 | Completed final sign-off Dec 2005 | 1001 California St | remodel kitchen, master bed & bath, guest bed & bath. family room. no structural work.Details
remodel kitchen, master bed & bath, guest bed & bath. family room. no structural work. | $300,000 |
| Jun 29, 2004 | Expired or cancelled expired Feb 2006 | 2711 Scott St | remodel (e)master bath on 3/fDetails
remodel (e)master bath on 3/f | $15,000 |