Block 0978, lot 012
2725 Pacific Ave
- City’s use
- Single Family Residential
- Built
- 1974
- Stories
- 2
- Units
- 1
- Rooms
- 3 bedrooms, 3 bathrooms
- Building
- 4,354 sq ft
- Lot
- 4,020 sq ft
- Zoning
- RH1
- Construction type
- B
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
30 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Aug 16, 2018 | Completed final sign-off Dec 2020 | 2725 Pacific Av | Marmol Radziner Arch Corp | interior renovation. replacement of mep systems to be design build. renovation to interior non bearing walls. replacement of select doors and windows. relocation of e cold plunge pool and addition of exterior dry saunaDetails
interior renovation. replacement of mep systems to be design build. renovation to interior non bearing walls. replacement of select doors and windows. relocation of e cold plunge pool and addition of exterior dry sauna | $500,000 |
| Aug 3, 2015 | Never finaled issued Aug 2015, no final | 2725 Pacific Av | street space permitDetails
street space permit | ||
| Mar 24, 2015 | Never finaled issued Mar 2015, no final | 2725 Pacific Av | street space permitDetails
street space permit | ||
| Jan 23, 2015 | Never finaled issued Feb 2015, no final | 2725 Pacific Av | Forsythe General Contractors | total 10 windows facing to the street replace with new metal framed windows with no divisions with double pane & low e. remove clay tile roof over second level at front and replace tieh new slate or standing metal seam roof.Details
total 10 windows facing to the street replace with new metal framed windows with no divisions with double pane & low e. remove clay tile roof over second level at front and replace tieh new slate or standing metal seam roof. | |
| Jul 30, 2014 | Completed final sign-off Jun 2016 | 2725 Pacific Av | Forsythe General Contractors | addition to extg roof deck. 2nd egress. hot tub on new deck. glass guard rail.Details
addition to extg roof deck. 2nd egress. hot tub on new deck. glass guard rail. | $88,500 |
| Jun 27, 2014 | Never finaled issued Aug 2014, no final | 2725 Pacific Av | remove and replace existing windows in kind. remove and replace existing metal guard rail at facade in kind with new metal guard rail.Details
remove and replace existing windows in kind. remove and replace existing metal guard rail at facade in kind with new metal guard rail. | $15,000 | |
| Jun 13, 2014 | Completed final sign-off Apr 2016 | 2725 Pacific Av | Forsythe General Contractors | remove ext stucco finish on exterior walls. replace with new integral gray natural concrete looking smooth finishes. replace extg sectional garage door with new sectional wood garage door.Details
remove ext stucco finish on exterior walls. replace with new integral gray natural concrete looking smooth finishes. replace extg sectional garage door with new sectional wood garage door. | $40,000 |
| Mar 3, 2014 | Completed final sign-off Jun 2014 | 2725 Pacific Av | Forsythe General Contractors | replace back doors. replace and add lighting in back yard. add wood trim in backyardDetails
replace back doors. replace and add lighting in back yard. add wood trim in backyard | $5,000 |
| Oct 24, 2013 | Completed final sign-off Oct 2013 | 2725 Pacific Av | Forsythe General Contractors | reroofingDetails
reroofing | $4,000 |
| Oct 17, 2013 | Completed final sign-off Jun 2014 | 2725 Pacific Av | Forsythe General Contractors | revision to 201303142216. revise detail 11 and 12/a6.4 wall assembly. add horizontal wood finish at 3 walls at 2nd fl at interior of cmu wall and lath with plaster at exterior cmu wall.Details
revision to 201303142216. revise detail 11 and 12/a6.4 wall assembly. add horizontal wood finish at 3 walls at 2nd fl at interior of cmu wall and lath with plaster at exterior cmu wall. | $1,500 |
| Jun 13, 2013 | Completed final sign-off Jul 2014 | 2725 Pacific Av | Herrero Builders Incorporated | shoring and soil nails in relation to excavation at 2750 jackson street.Details
shoring and soil nails in relation to excavation at 2750 jackson street. | $1,000 |
| Mar 21, 2013 | Completed final sign-off Jul 2013 | 2725 Pacific Av | Forsythe General Contractors | obtain final sinepction for work approved under pa# 2011-0113-8317. all work is complete. original scope of work-pool modifications of shape & new pool cover, lighting & misc other work (pool)Details
obtain final sinepction for work approved under pa# 2011-0113-8317. all work is complete. original scope of work-pool modifications of shape & new pool cover, lighting & misc other work (pool) | |
| Mar 14, 2013 | Completed final sign-off Jun 2014 | 2725 Pacific Av | Forsythe General Contractors | rear yard only. proposed new roof deck 499 sq. ft. proposed new steel stairs from 3rd level to 3rd level roof. new exterior lighting.Details
rear yard only. proposed new roof deck 499 sq. ft. proposed new steel stairs from 3rd level to 3rd level roof. new exterior lighting. | $100,000 |
| Feb 4, 2013 | Completed final sign-off Jul 2013 | 2725 Pacific Av | Forsythe General Contractors | to obtain final inspection for work approved under pa#200809091133 all work is complete.Details
to obtain final inspection for work approved under pa#200809091133 all work is complete. | |
| Sep 27, 2012 | Completed final sign-off Jul 2013 | 2725 Pacific Av | Forsythe General Contractors | remove (e) masonry chimey, new temp glass guardrial to replace (e). (n) laminated glass skylight to replace (e). (n) waterproofing membrane to replace (e).Details
remove (e) masonry chimey, new temp glass guardrial to replace (e). (n) laminated glass skylight to replace (e). (n) waterproofing membrane to replace (e). | $40,000 |
| Jan 19, 2011 | Expired or cancelled withdrawn Nov 2012 | 2725 Pacific Av | revision to 2000910138826 clarify construction detail for guardrail at roof deck. reivsion to roof deck, weather proof deckDetails
revision to 2000910138826 clarify construction detail for guardrail at roof deck. reivsion to roof deck, weather proof deck | $1,000 | |
| Jan 13, 2011 | Expired or cancelled expired Jul 2013 | 2725 Pacific Av | Adams Pool Solutions | modify shape of pool as necessary to accomidate new cover vault.split main drain and add new skimmer at new location. provide power for cover and relocate low voltage pool lighting. new tile at waterline and new plaster in pool.Details
modify shape of pool as necessary to accomidate new cover vault.split main drain and add new skimmer at new location. provide power for cover and relocate low voltage pool lighting. new tile at waterline and new plaster in pool. | $55,028 |
| Aug 3, 2010 | Expired or cancelled expired Jul 2013 | 2725 Pacific Av | Venco Management/Dba Swan Pools | to obtain final inspection for work approved under pa 200809091133; all work is completeDetails
to obtain final inspection for work approved under pa 200809091133; all work is complete | |
| Oct 13, 2009 | Expired or cancelled cancelled Oct 2013 | 2725 Pacific Av | new roof deck & parapet, new exterior stairs & new water spa/hot tubDetails
new roof deck & parapet, new exterior stairs & new water spa/hot tub | $36,000 | |
| Oct 2, 2009 | Never finaled issued Oct 2009, no final | 2725 Pacific Av | street space permit.Details
street space permit. | ||
| Nov 19, 2008 | Never finaled issued Nov 2008, no final | 2725 Pacific Av | street spaceDetails
street space | ||
| Oct 3, 2008 | Never finaled issued Oct 2008, no final | 2725 Pacific Av | street space permit only.Details
street space permit only. | ||
| Sep 9, 2008 | Expired or cancelled expired Mar 2010 | 2725 Pacific Av | Venco Management/Dba Swan Pools | new gunite in ground spa at back yardDetails
new gunite in ground spa at back yard | $38,000 |
| Nov 12, 2003 | Completed final sign-off Dec 2003 | 2725 Pacific Av | revise 2002/03/27/2468. revise windows sizes,eliminate window at master bath, 3rd fl only.Details
revise 2002/03/27/2468. revise windows sizes,eliminate window at master bath, 3rd fl only. | ||
| Aug 21, 2003 | Completed final sign-off Dec 2003 | 2725 Pacific Av | rev to 200203272468. substituted roof joist 1&3/4 x 11&7/8 lvl at 12" with 11&7/8 tji/pro 550@ 16".Details
rev to 200203272468. substituted roof joist 1&3/4 x 11&7/8 lvl at 12" with 11&7/8 tji/pro 550@ 16". | ||
| Jul 28, 2003 | Completed final sign-off Dec 2003 | 2725 Pacific Av | remove proposed1/2 bath @2/f, provide waterproof membrane @new shower in master bath, modify chimneyDetails
remove proposed1/2 bath @2/f, provide waterproof membrane @new shower in master bath, modify chimney | ||
| Jul 10, 2003 | Completed final sign-off Dec 2003 | 2725 Pacific Av | rev#200203272468 .remove greenhouse at deck and revision 3rd flr/roof plans( reduce scope of work).Details
rev#200203272468 .remove greenhouse at deck and revision 3rd flr/roof plans( reduce scope of work). | ||
| Mar 27, 2002 | Completed final sign-off Dec 2003 | 2725 Pacific Av | add 3 story & green house at deckDetails
add 3 story & green house at deck | $150,000 | |
| Mar 23, 2001 | Expired or cancelled cancelled Jan 2002 | 2725 Pacific Av | addition of outdoor roof deck, rear stairs from garden to existing deck & from existing deck to roofDetails
addition of outdoor roof deck, rear stairs from garden to existing deck & from existing deck to roof | $30,000 | |
| Aug 22, 2000 | Completed final sign-off Aug 2000 | 2725 Pacific Av | renewal of application 9806315, 9812748, 9917411 for final inspectionDetails
renewal of application 9806315, 9812748, 9917411 for final inspection |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Forsythe General Contractors (10), Venco Management/Dba Swan Pools (2), Adams Pool Solutions, Herrero Builders Incorporated, Marmol Radziner Arch Corp
- Architects
- Jay Sherlock (4), Jay Sherlock, V Labiano Abello
- Engineers
- David Strandberg (2), Rodrigo Santos
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.