Back to kitchen remodel contractors
Forney Construction
- Based in
- Novato
- On San Francisco permits
- May 2019 to May 2026
- Last 24 months
- 6 permits filed
28 permits since 2000: 20 completed, 5 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 4 completed, 1 in progress, 1 never finaled. Typically 0 days from filing to permit and 361 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | Completed final sign-off Jul 2026 | 1839 15th St | bathroom remodel in kind, new shower, new vanity, new floor in bathroom, new backsplash in kitchen. new elecrical panel & (2) new electrical outlets in kitchen per code.Details
bathroom remodel in kind, new shower, new vanity, new floor in bathroom, new backsplash in kitchen. new elecrical panel & (2) new electrical outlets in kitchen per code. | $50,000 |
| May 22, 2025 | In progress issued May 2025 | 358 El Camino Del Mar | revision to pa# 202503252967, kitchen and 3 1/2 bathrooms remodel, update electrical and plumbing. window replacement like for like, dryrot repairs on exterior decorative balcony like for like, voluntary str strengthening 1/f walls and alteration of closet walls at 3/f.Details
revision to pa# 202503252967, kitchen and 3 1/2 bathrooms remodel, update electrical and plumbing. window replacement like for like, dryrot repairs on exterior decorative balcony like for like, voluntary str strengthening 1/f walls and alteration of closet walls at 3/f. | $100,000 |
| Sep 5, 2024 | Completed final sign-off Sep 2025 | 470 Collingwood St | unit 9# demo kitchen and install new electrical to code and cabinets sinks. demo 2 bathroom install 2 walk in showers and recessed lights, new flooring throughout. like for like. change in place of (e) tubs no new plumbing fixtures count.Details
unit 9# demo kitchen and install new electrical to code and cabinets sinks. demo 2 bathroom install 2 walk in showers and recessed lights, new flooring throughout. like for like. change in place of (e) tubs no new plumbing fixtures count. | $80,000 |
| Jun 29, 2022 | Completed final sign-off Mar 2024 | 2100 Green St | unit 104: interior remodel including removal of partition walls: kitchen remodel, laundry room remodel, master bathroom with new closet. new soundproof section of ceiling.Details
unit 104: interior remodel including removal of partition walls: kitchen remodel, laundry room remodel, master bathroom with new closet. new soundproof section of ceiling. | $50,000 |
| Jun 7, 2021 | Completed final sign-off May 2022 | 2255 Market St | unit 12: remove sheetrock- reinstall sheetrock- install kitchen cabinets- unit 12- one non structural kitchen remodel.Details
unit 12: remove sheetrock- reinstall sheetrock- install kitchen cabinets- unit 12- one non structural kitchen remodel. | $20,000 |
| May 15, 2019 | Never finaled issued May 2019, no final | 160 Liberty St | unit 3: remove sheetrock and plaster in kitchen. remove cabinets & countertops. replace wit like in kind. kitchen remodel.Details
unit 3: remove sheetrock and plaster in kitchen. remove cabinets & countertops. replace wit like in kind. kitchen remodel. | $20,000 |