Back to bathroom remodel contractors
Forney Construction
- Based in
- Novato
- On San Francisco permits
- May 2019 to May 2026
- Last 24 months
- 6 permits filed
28 permits since 2000: 20 completed, 5 in progress, 2 never finaled, 1 expired or cancelled.
Of the 2 never-finaled permits, 1 is 3 to 5 years old, 1 is 5 to 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
12 bathroom remodel permits: 9 completed, 2 in progress, 1 expired or cancelled. Typically 0 days from filing to permit and 273 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 6, 2026 | Completed final sign-off Jul 2026 | 1839 15th St | bathroom remodel in kind, new shower, new vanity, new floor in bathroom, new backsplash in kitchen. new elecrical panel & (2) new electrical outlets in kitchen per code.Details
bathroom remodel in kind, new shower, new vanity, new floor in bathroom, new backsplash in kitchen. new elecrical panel & (2) new electrical outlets in kitchen per code. | $50,000 |
| Apr 14, 2026 | Completed final sign-off May 2026 | 1220 Russia Av | bathroom remodel: replace like for like shower, vanity and toilet.Details
bathroom remodel: replace like for like shower, vanity and toilet. | $16,000 |
| May 22, 2025 | In progress issued May 2025 | 358 El Camino Del Mar | revision to pa# 202503252967, kitchen and 3 1/2 bathrooms remodel, update electrical and plumbing. window replacement like for like, dryrot repairs on exterior decorative balcony like for like, voluntary str strengthening 1/f walls and alteration of closet walls at 3/f.Details
revision to pa# 202503252967, kitchen and 3 1/2 bathrooms remodel, update electrical and plumbing. window replacement like for like, dryrot repairs on exterior decorative balcony like for like, voluntary str strengthening 1/f walls and alteration of closet walls at 3/f. | $100,000 |
| Mar 25, 2025 | In progress issued Mar 2025 | 358 El Camino Del Mar | in kind minor dryrot, repair in kind exterior, (3) in kind bathroom remodel(s)Details
in kind minor dryrot, repair in kind exterior, (3) in kind bathroom remodel(s) | $40,000 |
| Sep 5, 2024 | Completed final sign-off Sep 2025 | 470 Collingwood St | unit 9# demo kitchen and install new electrical to code and cabinets sinks. demo 2 bathroom install 2 walk in showers and recessed lights, new flooring throughout. like for like. change in place of (e) tubs no new plumbing fixtures count.Details
unit 9# demo kitchen and install new electrical to code and cabinets sinks. demo 2 bathroom install 2 walk in showers and recessed lights, new flooring throughout. like for like. change in place of (e) tubs no new plumbing fixtures count. | $80,000 |
| Apr 20, 2023 | Completed final sign-off Sep 2023 | 1718 17th Av | demo bathroom remove tub, install new shiwer pan. install new shower valve. install new toilet, install new tiles, vent lights and outlets.Details
demo bathroom remove tub, install new shiwer pan. install new shower valve. install new toilet, install new tiles, vent lights and outlets. | $25,000 |
| Aug 2, 2022 | Completed final sign-off Mar 2024 | 2100 Green St | rev to pa#202206297358 to correct scope of work on coversheet of pa#202206297358 to state a total of three baths to be remodeled.Details
rev to pa#202206297358 to correct scope of work on coversheet of pa#202206297358 to state a total of three baths to be remodeled. | |
| Jun 29, 2022 | Completed final sign-off Mar 2024 | 2100 Green St | unit 104: interior remodel including removal of partition walls: kitchen remodel, laundry room remodel, master bathroom with new closet. new soundproof section of ceiling.Details
unit 104: interior remodel including removal of partition walls: kitchen remodel, laundry room remodel, master bathroom with new closet. new soundproof section of ceiling. | $50,000 |
| Feb 8, 2022 | Completed final sign-off Aug 2022 | 1682 48th Av | remodel bathroom, add lighting, repair plumbing, add vent and tile.Details
remodel bathroom, add lighting, repair plumbing, add vent and tile. | $5,000 |
| Dec 1, 2021 | Completed final sign-off Oct 2022 | 158 Cervantes Bl | upper floor: remove (e) bathroom and non-load bearing walls in master bedroom and closets. to restore bedroom. rebuild bathroom in new location.Details
upper floor: remove (e) bathroom and non-load bearing walls in master bedroom and closets. to restore bedroom. rebuild bathroom in new location. | $50,000 |
| Jun 21, 2021 | Expired or cancelled cancelled Jan 2026 | 501 Beale St | remove one bathrom (7x7), fixutre, lighting, flooring, one multi use bathroom to remain. remove walls on old bathroom.Details
remove one bathrom (7x7), fixutre, lighting, flooring, one multi use bathroom to remain. remove walls on old bathroom. | $32,000 |
| Jun 7, 2021 | Completed final sign-off Mar 2022 | 140 El Verano Wy | remodel bathrooms (2) install new lighting, vents, shower valves and reinstall- sheetrock, fixtrures and tiles like for likeDetails
remodel bathrooms (2) install new lighting, vents, shower valves and reinstall- sheetrock, fixtrures and tiles like for like | $30,000 |