Block 1305, lot 013
358 El Camino Del Mar
- City’s use
- Single Family Residential
- Built
- 1924
- Stories
- 2
- Units
- 1
- Rooms
- 2 bathrooms
- Building
- 4,550 sq ft
- Lot
- 4,000 sq ft
- Zoning
- RH1D
- Construction type
- D
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
7 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Sep 17, 2025 | In progress issued Sep 2025 | 358 El Camino Del Mar | Forney Construction, Colindres & Associates | exterior stucco, brick, and wood siding replacement in-kind. street visible.Details
exterior stucco, brick, and wood siding replacement in-kind. street visible. | $200,000 |
| May 22, 2025 | In progress issued May 2025 | 358 El Camino Del Mar | Forney Construction, Colindres & Associates | revision to pa# 202503252967, kitchen and 3 1/2 bathrooms remodel, update electrical and plumbing. window replacement like for like, dryrot repairs on exterior decorative balcony like for like, voluntary str strengthening 1/f walls and alteration of closet walls at 3/f.Details
revision to pa# 202503252967, kitchen and 3 1/2 bathrooms remodel, update electrical and plumbing. window replacement like for like, dryrot repairs on exterior decorative balcony like for like, voluntary str strengthening 1/f walls and alteration of closet walls at 3/f. | $100,000 |
| May 6, 2025 | Completed final sign-off May 2025 | 358 El Camino Del Mar | Shaughnessy Roofing Inc | re-roof (detached garage) with torch down.Details
re-roof (detached garage) with torch down. | $7,800 |
| Mar 25, 2025 | In progress issued Mar 2025 | 358 El Camino Del Mar | Forney Construction, Colindres & Associates | in kind minor dryrot, repair in kind exterior, (3) in kind bathroom remodel(s)Details
in kind minor dryrot, repair in kind exterior, (3) in kind bathroom remodel(s) | $40,000 |
| May 8, 2003 | Never finaled issued May 2003, no final | 358 El Camino Del Mar | street spaceDetails
street space | ||
| May 8, 2003 | Expired or cancelled expired Jul 2006 | 358 El Camino Del Mar | Scott & Warner Builders Inc | repair/restore front balcony, fix leaks and water damage at sameDetails
repair/restore front balcony, fix leaks and water damage at same | $40,000 |
| Apr 23, 2002 | Expired or cancelled expired Jan 2004 | 358 El Camino Del Mar | remove existing closet n/b walls replace (e) bathrm fixtures (shower water closet vanity) replaceDetails
remove existing closet n/b walls replace (e) bathrm fixtures (shower water closet vanity) replace | $30,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- Colindres & Associates (3), Forney Construction (3), Scott & Warner Builders Inc, Shaughnessy Roofing Inc
- Engineers
- Randy E. Collins
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.