Back to kitchen remodel contractors
Forest Building Construction
- Based in
- Daly City
- On San Francisco permits
- Oct 2008 to Jun 2013
- Last 24 months
- 0 permits filed
43 permits since 2000: 38 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
10 kitchen remodel permits: 10 completed. Typically 2 days from filing to permit and 246 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 21, 2013 | Completed final sign-off Apr 2015 | 2040 15th Av | kitchen remodel, legalize upstairs half bathroom, new staircase to basement, legalize basement-1 bedroom, 1 office & 1 bathroomDetails
kitchen remodel, legalize upstairs half bathroom, new staircase to basement, legalize basement-1 bedroom, 1 office & 1 bathroom | $15,000 |
| May 13, 2013 | Completed final sign-off Apr 2015 | 2040 15th Av | painting @ dining rm & kitchen, patch holes in dining & kitchen walls (5-7 holes 2" diameter), replace one p-trap (leaking) in kitchen sink, replac eone dining rm swithc with dimmer switch. all existing, no change to current layout or floor plan.Details
painting @ dining rm & kitchen, patch holes in dining & kitchen walls (5-7 holes 2" diameter), replace one p-trap (leaking) in kitchen sink, replac eone dining rm swithc with dimmer switch. all existing, no change to current layout or floor plan. | $1,000 |
| Apr 18, 2012 | Completed final sign-off Mar 2013 | 3226 Anza St | add 1 bedroom, 1 bath at ground level. remodel kitchen, bathroom, and add 2nd bathroom at 2nd floorDetails
add 1 bedroom, 1 bath at ground level. remodel kitchen, bathroom, and add 2nd bathroom at 2nd floor | $10,000 |
| Aug 1, 2011 | Completed final sign-off Oct 2011 | 950 Plymouth Av | remodel kitchen on 2nd. floor. repair outlets & lights.Details
remodel kitchen on 2nd. floor. repair outlets & lights. | $11,000 |
| Jan 28, 2010 | Completed final sign-off Aug 2010 | 20 Morningside Dr | revision to 200910239786, englard kitchen window as side, add 4 lights at kitchen per plan, no replacement of front and rear windows, keep as existing.Details
revision to 200910239786, englard kitchen window as side, add 4 lights at kitchen per plan, no replacement of front and rear windows, keep as existing. | |
| Oct 23, 2009 | Completed final sign-off Aug 2010 | 20 Morningside Dr | interior remodel. add 1 master bathroom on 2nd floor, replace all windows as existing style on 2nd floor, reduce windows at kitchen & bathroom.no kitchen remodel; add new counter only.Details
interior remodel. add 1 master bathroom on 2nd floor, replace all windows as existing style on 2nd floor, reduce windows at kitchen & bathroom.no kitchen remodel; add new counter only. | $16,000 |
| Aug 6, 2009 | Completed final sign-off Dec 2009 | 2211 25th Av | replace existing kitchen cabinets. replace broken tiles in kitchen floor area aprox 25 sf. repair broken sheetrock due to water damage, paint, repair broken window frames, repair holes in wall, remove wall shelf, replace countertopDetails
replace existing kitchen cabinets. replace broken tiles in kitchen floor area aprox 25 sf. repair broken sheetrock due to water damage, paint, repair broken window frames, repair holes in wall, remove wall shelf, replace countertop | $2,400 |
| Jul 13, 2009 | Completed final sign-off Sep 2010 | 521 Gates St | for both units: new sheetrock & shearwall, electrical & plumbing. repair rotten drywall. location - bathroom, kitchen & 1 bedroom. replace kitchen broken floor tiles & living room carpet. replace broken kitchen cabinets. insulation, painting.Details
for both units: new sheetrock & shearwall, electrical & plumbing. repair rotten drywall. location - bathroom, kitchen & 1 bedroom. replace kitchen broken floor tiles & living room carpet. replace broken kitchen cabinets. insulation, painting. | $62,942 |
| Feb 4, 2009 | Completed final sign-off Apr 2009 | 238 Silver Av | to comply w/n.o.v. #200987720, #200988226, #200987701, #200987702, #200988311, remove stove, accessories, blocked area, garage 1 illegal kitchen & bathroom.Details
to comply w/n.o.v. #200987720, #200988226, #200987701, #200987702, #200988311, remove stove, accessories, blocked area, garage 1 illegal kitchen & bathroom. | $800 |
| Oct 8, 2008 | Completed final sign-off May 2009 | 223 Dore St | repair water damaged sheetrock, electrical, framing, siding & roofing at the 2nd floor in the kitchen & bathroom area. new cabinets, appliance, bathroom fixtures, flooring.Details
repair water damaged sheetrock, electrical, framing, siding & roofing at the 2nd floor in the kitchen & bathroom area. new cabinets, appliance, bathroom fixtures, flooring. | $10,000 |