Back to bathroom remodel contractors
Forest Building Construction
- Based in
- Daly City
- On San Francisco permits
- Oct 2008 to Jun 2013
- Last 24 months
- 0 permits filed
43 permits since 2000: 38 completed, 3 never finaled, 2 expired or cancelled.
Of the 3 never-finaled permits, 3 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
22 bathroom remodel permits: 20 completed, 1 never finaled, 1 expired or cancelled. Typically 7 days from filing to permit and 258 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 18, 2013 | Completed final sign-off Apr 2015 | 2040 15th Av | revision to app#201305217456.1)convert extg laundry room to new bedroom and new bath. 2)reinforce extg retaining wall with new 5th retaining wall. 3)new staircase to extg garage. 4)revise approved floor plan.Details
revision to app#201305217456.1)convert extg laundry room to new bedroom and new bath. 2)reinforce extg retaining wall with new 5th retaining wall. 3)new staircase to extg garage. 4)revise approved floor plan. | $48,000 |
| May 21, 2013 | Completed final sign-off Apr 2015 | 2040 15th Av | kitchen remodel, legalize upstairs half bathroom, new staircase to basement, legalize basement-1 bedroom, 1 office & 1 bathroomDetails
kitchen remodel, legalize upstairs half bathroom, new staircase to basement, legalize basement-1 bedroom, 1 office & 1 bathroom | $15,000 |
| May 21, 2012 | Completed final sign-off Aug 2013 | 234 Pope St | comply with complaint #201040699-add 3 storage rooms & 2 bathrooms on ground floor. add 2 bathrooms & remodel (e) bathroom on 2nd floor. pour 3'x 5' exterior concrete landing.Details
comply with complaint #201040699-add 3 storage rooms & 2 bathrooms on ground floor. add 2 bathrooms & remodel (e) bathroom on 2nd floor. pour 3'x 5' exterior concrete landing. | $50,000 |
| Apr 18, 2012 | Completed final sign-off Mar 2013 | 3226 Anza St | add 1 bedroom, 1 bath at ground level. remodel kitchen, bathroom, and add 2nd bathroom at 2nd floorDetails
add 1 bedroom, 1 bath at ground level. remodel kitchen, bathroom, and add 2nd bathroom at 2nd floor | $10,000 |
| May 3, 2011 | Expired or cancelled withdrawn Jul 2012 | 521 Gates St | nov 201075166, add bedroom and 1 bath on gr floor. add 1 garage on gr fl, add interior staircase between gr fl and 1st floor. add exterior stair case between gr fl and 1st flDetails
nov 201075166, add bedroom and 1 bath on gr floor. add 1 garage on gr fl, add interior staircase between gr fl and 1st floor. add exterior stair case between gr fl and 1st fl | $40,000 |
| Mar 28, 2011 | Completed final sign-off Sep 2011 | 2537 24th St | remodel bathroom to comply with ada requirments. remodel front entrance to comply with ada requirements. existing full service restaurant.Details
remodel bathroom to comply with ada requirments. remodel front entrance to comply with ada requirements. existing full service restaurant. | $15,000 |
| Jun 28, 2010 | Completed final sign-off Apr 2012 | 950 Plymouth Av | two stories horizontal addition to rear of the exsiting building total. addition area is 457 sf. remove one bathroom @ the exsting 2nd floor.Details
two stories horizontal addition to rear of the exsiting building total. addition area is 457 sf. remove one bathroom @ the exsting 2nd floor. | $60,000 |
| Mar 31, 2010 | Completed final sign-off Sep 2010 | 521 Gates St | interior remodel: add two half bath at 2nd. flr. & 1st. flr. relocate (e) furnace to 2nd. flr. & 1st. flr. no exterior change.Details
interior remodel: add two half bath at 2nd. flr. & 1st. flr. relocate (e) furnace to 2nd. flr. & 1st. flr. no exterior change. | $16,000 |
| Dec 24, 2009 | Completed final sign-off Sep 2010 | 2806 Van Ness Av | comply with nov 200923248. interior remodel. add 2 new bedrooms & closets at 4th floor. legalize bedrooms, home office at garage fl. add 11/2 baths at garage floor. no exterior change.Details
comply with nov 200923248. interior remodel. add 2 new bedrooms & closets at 4th floor. legalize bedrooms, home office at garage fl. add 11/2 baths at garage floor. no exterior change. | $16,000 |
| Dec 22, 2009 | Completed final sign-off Apr 2010 | 412 University St | remodel 2nd floor (e) bathroom, replace tile, painting. repair (e) fixturesDetails
remodel 2nd floor (e) bathroom, replace tile, painting. repair (e) fixtures | $4,000 |
| Dec 2, 2009 | Completed final sign-off Apr 2010 | 412 University St | add 1 full bath at 2nd floor ( above garage/first floor)Details
add 1 full bath at 2nd floor ( above garage/first floor) | $6,000 |
| Oct 30, 2009 | Completed final sign-off Apr 2010 | 412 University St | ground floor (garage)-add family room, laundry room, bedroom, storage & a full bathroomDetails
ground floor (garage)-add family room, laundry room, bedroom, storage & a full bathroom | $43,000 |
| Oct 23, 2009 | Completed final sign-off Aug 2010 | 20 Morningside Dr | interior remodel. add 1 master bathroom on 2nd floor, replace all windows as existing style on 2nd floor, reduce windows at kitchen & bathroom.no kitchen remodel; add new counter only.Details
interior remodel. add 1 master bathroom on 2nd floor, replace all windows as existing style on 2nd floor, reduce windows at kitchen & bathroom.no kitchen remodel; add new counter only. | $16,000 |
| Oct 21, 2009 | Never finaled issued Nov 2009, no final | 2482 19th Av | interior remodel; add one family, one office and one full bath on garage level.Details
interior remodel; add one family, one office and one full bath on garage level. | $20,000 |
| Aug 19, 2009 | Completed final sign-off Aug 2010 | 20 Morningside Dr | two new bedrooms, one full bath room, family rm at ground/garage level. replace (e) wood beam and posts at ground floor.Details
two new bedrooms, one full bath room, family rm at ground/garage level. replace (e) wood beam and posts at ground floor. | $40,000 |
| Aug 11, 2009 | Completed final sign-off Oct 2009 | 994 Junipero Serra Bl | interior remodel. remove (e) touilet and sink and replace with new full bath room at garage level. work also to legalize (e) bedroom on this floorDetails
interior remodel. remove (e) touilet and sink and replace with new full bath room at garage level. work also to legalize (e) bedroom on this floor | $20,000 |
| Jul 13, 2009 | Completed final sign-off Sep 2010 | 521 Gates St | for both units: new sheetrock & shearwall, electrical & plumbing. repair rotten drywall. location - bathroom, kitchen & 1 bedroom. replace kitchen broken floor tiles & living room carpet. replace broken kitchen cabinets. insulation, painting.Details
for both units: new sheetrock & shearwall, electrical & plumbing. repair rotten drywall. location - bathroom, kitchen & 1 bedroom. replace kitchen broken floor tiles & living room carpet. replace broken kitchen cabinets. insulation, painting. | $62,942 |
| Jul 1, 2009 | Completed final sign-off Dec 2009 | 2211 25th Av | interior remodel: add 2 new bedroom, 1 new bath, 1 game room at 1st floor; remofel (e) bath at 2nd floor & add 1 new bath at 2nd floor.Details
interior remodel: add 2 new bedroom, 1 new bath, 1 game room at 1st floor; remofel (e) bath at 2nd floor & add 1 new bath at 2nd floor. | $20,000 |
| May 28, 2009 | Completed final sign-off May 2010 | 500 Dellbrook Av | tile existing upstair bathroom, paint upstair bedroom & living room, resurface (e) upstair hardwood floor.Details
tile existing upstair bathroom, paint upstair bedroom & living room, resurface (e) upstair hardwood floor. | $2,000 |
| Apr 23, 2009 | Completed final sign-off Apr 2011 | 430 Balboa St | comply with nov 200708030 to repair fire damages at west and east property line. replace 12ft 4" section of foundation at west property line, repair existing foundation. interior remodel, relocate interior staircase. remove 1 bathroom.Details
comply with nov 200708030 to repair fire damages at west and east property line. replace 12ft 4" section of foundation at west property line, repair existing foundation. interior remodel, relocate interior staircase. remove 1 bathroom. | $120,000 |
| Feb 4, 2009 | Completed final sign-off Apr 2009 | 238 Silver Av | to comply w/n.o.v. #200987720, #200988226, #200987701, #200987702, #200988311, remove stove, accessories, blocked area, garage 1 illegal kitchen & bathroom.Details
to comply w/n.o.v. #200987720, #200988226, #200987701, #200987702, #200988311, remove stove, accessories, blocked area, garage 1 illegal kitchen & bathroom. | $800 |
| Oct 8, 2008 | Completed final sign-off May 2009 | 223 Dore St | repair water damaged sheetrock, electrical, framing, siding & roofing at the 2nd floor in the kitchen & bathroom area. new cabinets, appliance, bathroom fixtures, flooring.Details
repair water damaged sheetrock, electrical, framing, siding & roofing at the 2nd floor in the kitchen & bathroom area. new cabinets, appliance, bathroom fixtures, flooring. | $10,000 |