Foley Construction
- Based in
- San Bruno
- On San Francisco permits
- Mar 2009 to Mar 2018
- Last 24 months
- 0 permits filed
63 permits since 2000: 55 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
11 stairs permits: 10 completed, 1 never finaled. Typically 63 days from filing to permit and 363 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Dec 23, 2014 | Completed final sign-off Jul 2016 | 385 Liberty St | revision to pa#201308305702. new elevator serving garage, 1/f and 2/f. rebuilt entry stairs from entry up to 1/f, remodel existing kitchen and powder room, install wetbar at existing living room. no change to exterior envelope, no increase in building area.Details
revision to pa#201308305702. new elevator serving garage, 1/f and 2/f. rebuilt entry stairs from entry up to 1/f, remodel existing kitchen and powder room, install wetbar at existing living room. no change to exterior envelope, no increase in building area. | $20,000 |
| Mar 26, 2013 | Completed final sign-off Dec 2014 | 143 Upper Tr | revision to pa# 2012/11/13/4068. horizontal addition at (e) 3rd floor to enlarge master bedroom & bathroom. scope also includes a roof deck at the 3rd floor & a skylight over (e) interior stair.Details
revision to pa# 2012/11/13/4068. horizontal addition at (e) 3rd floor to enlarge master bedroom & bathroom. scope also includes a roof deck at the 3rd floor & a skylight over (e) interior stair. | $10,000 |
| Nov 13, 2012 | Completed final sign-off Dec 2014 | 143 Upper Tr | remodel of existing residence including conversion of existing garage level into habitable space, 2 bedrooms, 2 full baths, entertainment room. 2nd fl: remodel kitchen, new stair,family rm. 3rd fl reconfigure master bedroom and 2baths, remodel 2 other bedrooms, and windows. gas fireplace,skylightsDetails
remodel of existing residence including conversion of existing garage level into habitable space, 2 bedrooms, 2 full baths, entertainment room. 2nd fl: remodel kitchen, new stair,family rm. 3rd fl reconfigure master bedroom and 2baths, remodel 2 other bedrooms, and windows. gas fireplace,skylights | $425,000 |
| Jul 11, 2012 | Completed final sign-off Mar 2013 | 3076 Washington St | partial lightwell infill to provide internal stair access from (e) 2nd floor down to (e) 1st floor. new rated windows at infill addition.Details
partial lightwell infill to provide internal stair access from (e) 2nd floor down to (e) 1st floor. new rated windows at infill addition. | $35,000 |
| Apr 12, 2011 | Completed final sign-off Oct 2011 | 1027 Cole St | revision to pa# 2011-0127-9148-changes in dimension @ new bsment stairs & rear yard patio. repl in kind dry rot portion of exterior wall, roof at main level, relocate fireplace to exterior, change bath tub to shower @basement. enlarge closet at upper level master bedrm, structural changes to framingDetails
revision to pa# 2011-0127-9148-changes in dimension @ new bsment stairs & rear yard patio. repl in kind dry rot portion of exterior wall, roof at main level, relocate fireplace to exterior, change bath tub to shower @basement. enlarge closet at upper level master bedrm, structural changes to framing | |
| Feb 7, 2011 | Never finaled issued Aug 2011, no final | 4085 20th St | horizontal addition to basement, 1st & 2nd floors. front addition to balcony on 1st floor and 2nd floor. ground floor enlarge deck and repair (e) stair.Details
horizontal addition to basement, 1st & 2nd floors. front addition to balcony on 1st floor and 2nd floor. ground floor enlarge deck and repair (e) stair. | $19,000 |
| Jan 27, 2011 | Completed final sign-off Oct 2011 | 1027 Cole St | remodel (e) residence including kitchen, 4 bathrooms, new interior stair. reconfigured windows & doors at rear yard elevation, (less than 50sf total) glazing to be added. reconfigure (e) rear yard on-grade steps. addition of 211sf habitable space to (e) habitable basement.Details
remodel (e) residence including kitchen, 4 bathrooms, new interior stair. reconfigured windows & doors at rear yard elevation, (less than 50sf total) glazing to be added. reconfigure (e) rear yard on-grade steps. addition of 211sf habitable space to (e) habitable basement. | $400,000 |
| Dec 23, 2010 | Completed final sign-off Oct 2012 | 179 Henry St | to comply w/ nov 200337272 of 2/7/03, nov 200883924 of 12/03/08. new habitable rooms built in (e)basement and (e) attic. new deck on grade. add 4 dormers and a porch at (e) roof. partial removal and repair of (e)rear deck and stairs less than 50%. replacment in kind windows at st elev. struc upgradeDetails
to comply w/ nov 200337272 of 2/7/03, nov 200883924 of 12/03/08. new habitable rooms built in (e)basement and (e) attic. new deck on grade. add 4 dormers and a porch at (e) roof. partial removal and repair of (e)rear deck and stairs less than 50%. replacment in kind windows at st elev. struc upgrade | $220,000 |
| Nov 9, 2010 | Completed final sign-off Sep 2014 | 4085 20th St | interior alterations with bearing & non-bearing walls relocated, see arch & structural drawings. new powder room on 1st floor, new bathrooom on bottom floor (basement), rebuild stair.Details
interior alterations with bearing & non-bearing walls relocated, see arch & structural drawings. new powder room on 1st floor, new bathrooom on bottom floor (basement), rebuild stair. | $185,000 |
| Oct 21, 2009 | Completed final sign-off May 2010 | 2104 Castro St | 3rd floor rear extension - add 2 bedrooms, infill lightwell & reconfigure 2nd floor bathroom; add exterior windows. add 3rd floor exterior deck. reconfigure 1st floor stair; add skylight.Details
3rd floor rear extension - add 2 bedrooms, infill lightwell & reconfigure 2nd floor bathroom; add exterior windows. add 3rd floor exterior deck. reconfigure 1st floor stair; add skylight. | $35,000 |
| Jun 30, 2009 | Completed final sign-off May 2010 | 2104 Castro St | interior remodel. add new stair btn ground fl and main fl. remodel kitchen. remove partial concrete at ground floorDetails
interior remodel. add new stair btn ground fl and main fl. remodel kitchen. remove partial concrete at ground floor | $15,500 |