Block 2618A, lot 039
143 Upper Ter
- City’s use
- Single Family Residential
- Built
- 1919
- Stories
- 3
- Rooms
- 5 bedrooms, 4 bathrooms
- Building
- 3,768 sq ft
- Lot
- 2,613 sq ft
- Zoning
- RH1D
- Construction type
- NA
From the assessor's latest secured roll, which can lag recent work. Lot plans, zoning and planning history on the city’s Property Information Map
Permits filed here
9 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Jun 25, 2018 | Never finaled issued Jun 2018, no final | 143 Upper Tr | street spaceDetails
street space | ||
| May 30, 2018 | Expired or cancelled withdrawn Mar 2019 | 143 Upper Tr | expand side yard fence, 6'-0" max heightDetails
expand side yard fence, 6'-0" max height | $1,000 | |
| May 22, 2014 | Never finaled issued May 2014, no final | 143 Upper Tr | street spaceDetails
street space | ||
| Nov 21, 2013 | Never finaled issued Nov 2013, no final | 143 Upper Tr | street space permitDetails
street space permit | ||
| Nov 8, 2013 | Completed final sign-off Jan 2015 | 143 Upper Tr | Excellent Technical Roofing Co, Inc. | reroofingDetails
reroofing | $9,500 |
| Jun 5, 2013 | Completed final sign-off Dec 2014 | 143 Upper Tr | Foley Construction | replace in kind existing windows at street (west) elevation. repair stucco siding, dryrot trim & replace tile at entry steps.Details
replace in kind existing windows at street (west) elevation. repair stucco siding, dryrot trim & replace tile at entry steps. | $10,000 |
| May 22, 2013 | Never finaled issued May 2013, no final | 143 Upper Tr | street spaceDetails
street space | ||
| Mar 26, 2013 | Completed final sign-off Dec 2014 | 143 Upper Tr | Foley Construction | revision to pa# 2012/11/13/4068. horizontal addition at (e) 3rd floor to enlarge master bedroom & bathroom. scope also includes a roof deck at the 3rd floor & a skylight over (e) interior stair.Details
revision to pa# 2012/11/13/4068. horizontal addition at (e) 3rd floor to enlarge master bedroom & bathroom. scope also includes a roof deck at the 3rd floor & a skylight over (e) interior stair. | $10,000 |
| Nov 13, 2012 | Completed final sign-off Dec 2014 | 143 Upper Tr | Foley Construction | remodel of existing residence including conversion of existing garage level into habitable space, 2 bedrooms, 2 full baths, entertainment room. 2nd fl: remodel kitchen, new stair,family rm. 3rd fl reconfigure master bedroom and 2baths, remodel 2 other bedrooms, and windows. gas fireplace,skylightsDetails
remodel of existing residence including conversion of existing garage level into habitable space, 2 bedrooms, 2 full baths, entertainment room. 2nd fl: remodel kitchen, new stair,family rm. 3rd fl reconfigure master bedroom and 2baths, remodel 2 other bedrooms, and windows. gas fireplace,skylights | $425,000 |
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover single-family homes like this one.