Back to bathroom remodel contractors
Foley Construction
- Based in
- San Bruno
- On San Francisco permits
- Mar 2009 to Mar 2018
- Last 24 months
- 0 permits filed
63 permits since 2000: 55 completed, 5 never finaled, 3 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
16 bathroom remodel permits: 15 completed, 1 expired or cancelled. Typically 2 days from filing to permit and 323 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Mar 30, 2015 | Completed final sign-off Jul 2016 | 385 Liberty St | revision to pa# 2014 1223 4339 - remodel 3rd flr including 3 bedrooms & 2 bathrooms. relocate skylightDetails
revision to pa# 2014 1223 4339 - remodel 3rd flr including 3 bedrooms & 2 bathrooms. relocate skylight | $20,000 |
| Jun 27, 2014 | Expired or cancelled cancelled Oct 2014 | 3725 Washington St | remodel e kitchen, laundry room, full bath, 1/2 bath. no structural work. all work within existing footprint.Details
remodel e kitchen, laundry room, full bath, 1/2 bath. no structural work. all work within existing footprint. | $107,607 |
| May 22, 2014 | Completed final sign-off Apr 2015 | 465 Diamond St | remodel 2 extg kitchens, master bathroom, hallway bathroom and half bath. replace extg sliding door in kind at rear elevation. no new space to be added, no work within view of public right of way.Details
remodel 2 extg kitchens, master bathroom, hallway bathroom and half bath. replace extg sliding door in kind at rear elevation. no new space to be added, no work within view of public right of way. | $68,375 |
| Nov 7, 2013 | Completed final sign-off May 2014 | 350 Collingwood St | interior remodel of master bathroom and closet along with seperate bathroom at 2/f.Details
interior remodel of master bathroom and closet along with seperate bathroom at 2/f. | $10,000 |
| Aug 30, 2013 | Completed final sign-off Jul 2016 | 385 Liberty St | expansion under (e) house, envelop into (e) crawl space convert crawl space into new bedroom, bathroom and laundry, egress, excavation for legal light and air and landscaping/retaining wallsDetails
expansion under (e) house, envelop into (e) crawl space convert crawl space into new bedroom, bathroom and laundry, egress, excavation for legal light and air and landscaping/retaining walls | $100,000 |
| Mar 26, 2013 | Completed final sign-off Dec 2014 | 143 Upper Tr | revision to pa# 2012/11/13/4068. horizontal addition at (e) 3rd floor to enlarge master bedroom & bathroom. scope also includes a roof deck at the 3rd floor & a skylight over (e) interior stair.Details
revision to pa# 2012/11/13/4068. horizontal addition at (e) 3rd floor to enlarge master bedroom & bathroom. scope also includes a roof deck at the 3rd floor & a skylight over (e) interior stair. | $10,000 |
| Nov 13, 2012 | Completed final sign-off Dec 2014 | 143 Upper Tr | remodel of existing residence including conversion of existing garage level into habitable space, 2 bedrooms, 2 full baths, entertainment room. 2nd fl: remodel kitchen, new stair,family rm. 3rd fl reconfigure master bedroom and 2baths, remodel 2 other bedrooms, and windows. gas fireplace,skylightsDetails
remodel of existing residence including conversion of existing garage level into habitable space, 2 bedrooms, 2 full baths, entertainment room. 2nd fl: remodel kitchen, new stair,family rm. 3rd fl reconfigure master bedroom and 2baths, remodel 2 other bedrooms, and windows. gas fireplace,skylights | $425,000 |
| Sep 5, 2012 | Completed final sign-off Dec 2016 | 80 Laidley St | rear yard addition one story vertical and roof deck. interior remodel including kitchen and bathrooms.Details
rear yard addition one story vertical and roof deck. interior remodel including kitchen and bathrooms. | $495,000 |
| Dec 16, 2011 | Completed final sign-off Oct 2012 | 179 Henry St | revision to appl #2010.12.23.7352 including reconfiguration of walls at 4th floor for relocated laundry & added bathroom; added fireplace at 1st floor; reconfigured bathroom shower & added transom window at 2nd floor; closet reconfigured at 3rd floor.Details
revision to appl #2010.12.23.7352 including reconfiguration of walls at 4th floor for relocated laundry & added bathroom; added fireplace at 1st floor; reconfigured bathroom shower & added transom window at 2nd floor; closet reconfigured at 3rd floor. | $11,000 |
| Sep 16, 2011 | Completed final sign-off Sep 2013 | 453 Hill St | interior remodel including kitchen, dining, bedrooms & bathrooms. add 1 new bathroom. no exterior work, no new habitable space on garage levelDetails
interior remodel including kitchen, dining, bedrooms & bathrooms. add 1 new bathroom. no exterior work, no new habitable space on garage level | $60,000 |
| Apr 12, 2011 | Completed final sign-off Oct 2011 | 1027 Cole St | revision to pa# 2011-0127-9148-changes in dimension @ new bsment stairs & rear yard patio. repl in kind dry rot portion of exterior wall, roof at main level, relocate fireplace to exterior, change bath tub to shower @basement. enlarge closet at upper level master bedrm, structural changes to framingDetails
revision to pa# 2011-0127-9148-changes in dimension @ new bsment stairs & rear yard patio. repl in kind dry rot portion of exterior wall, roof at main level, relocate fireplace to exterior, change bath tub to shower @basement. enlarge closet at upper level master bedrm, structural changes to framing | |
| Jan 27, 2011 | Completed final sign-off Oct 2011 | 1027 Cole St | remodel (e) residence including kitchen, 4 bathrooms, new interior stair. reconfigured windows & doors at rear yard elevation, (less than 50sf total) glazing to be added. reconfigure (e) rear yard on-grade steps. addition of 211sf habitable space to (e) habitable basement.Details
remodel (e) residence including kitchen, 4 bathrooms, new interior stair. reconfigured windows & doors at rear yard elevation, (less than 50sf total) glazing to be added. reconfigure (e) rear yard on-grade steps. addition of 211sf habitable space to (e) habitable basement. | $400,000 |
| May 7, 2010 | Completed final sign-off Aug 2010 | 67 Ord St | relocate basement bathroom, interior work only. (e) interior shearwall/holddowns relocated per drawings.Details
relocate basement bathroom, interior work only. (e) interior shearwall/holddowns relocated per drawings. | $1,200 |
| Oct 21, 2009 | Completed final sign-off May 2010 | 2104 Castro St | 3rd floor rear extension - add 2 bedrooms, infill lightwell & reconfigure 2nd floor bathroom; add exterior windows. add 3rd floor exterior deck. reconfigure 1st floor stair; add skylight.Details
3rd floor rear extension - add 2 bedrooms, infill lightwell & reconfigure 2nd floor bathroom; add exterior windows. add 3rd floor exterior deck. reconfigure 1st floor stair; add skylight. | $35,000 |
| Sep 1, 2009 | Completed final sign-off May 2010 | 2104 Castro St | seismic upgrade for entire builidng. interior remodeling 2nd fl incl. add new full bath, remodel (e) full bath and relocation of (e) laundry.Details
seismic upgrade for entire builidng. interior remodeling 2nd fl incl. add new full bath, remodel (e) full bath and relocation of (e) laundry. | $49,800 |
| Apr 28, 2009 | Completed final sign-off May 2010 | 2104 Castro St | interior remodel: reconfigure floor plan to add (1) powder & storage on 1st. floor. reconfigure floor plan to add (1) bath and closets on second floor. separate permit to legalize rear structure.Details
interior remodel: reconfigure floor plan to add (1) powder & storage on 1st. floor. reconfigure floor plan to add (1) bath and closets on second floor. separate permit to legalize rear structure. | $29,000 |