Fine Line Group Inc
- Based in
- San Francisco
- On San Francisco permits
- Feb 2000 to Sep 2010
- Last 24 months
- 0 permits filed
131 permits since 2000: 88 completed, 16 never finaled, 27 expired or cancelled.
Of the 16 never-finaled permits, 16 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
8 stairs permits: 6 completed, 2 expired or cancelled. Typically 3 days from filing to permit and 192 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 11, 2010 | Completed final sign-off May 2010 | 800 Market St | revision to pa# 2008.12.19.8917. provude new landing at ground / street level (e) main stair.Details
revision to pa# 2008.12.19.8917. provude new landing at ground / street level (e) main stair. | $2,500 |
| Jun 23, 2009 | Completed final sign-off Apr 2010 | 660 Market St | new men's restroom on the 4th floor. new walls to enclose open stair and elevator lobby per plan. lighting under separate permit.Details
new men's restroom on the 4th floor. new walls to enclose open stair and elevator lobby per plan. lighting under separate permit. | $15,000 |
| Apr 23, 2009 | Completed final sign-off Sep 2009 | 648 Market St | demo, concrete doors, glazing, drywall/framing tile & stone, plmg, hvac, electrical. installing pre-fab cabinets, new sink and drain build wood stairs and mezzanine. relocate electrical panel install freezer.Details
demo, concrete doors, glazing, drywall/framing tile & stone, plmg, hvac, electrical. installing pre-fab cabinets, new sink and drain build wood stairs and mezzanine. relocate electrical panel install freezer. | $250,864 |
| Feb 6, 2009 | Completed final sign-off May 2010 | 800 Market St | slab cut-out in 2 locations: ground floor for n elevator pit. 3rd floor for n communicating stairway. work in advance of complete ti permi uner 200812198917. elevator under ti permit.Details
slab cut-out in 2 locations: ground floor for n elevator pit. 3rd floor for n communicating stairway. work in advance of complete ti permi uner 200812198917. elevator under ti permit. | $2,000 |
| Mar 14, 2008 | Completed final sign-off May 2008 | 134 Maiden Ln | interior finish upgrade to an existing mercantile space including new interior finishes, relocation and supplement of existing light fixtures, new display casework, new hand and guard rails of existing stairs. mep under separate permitDetails
interior finish upgrade to an existing mercantile space including new interior finishes, relocation and supplement of existing light fixtures, new display casework, new hand and guard rails of existing stairs. mep under separate permit | $535,000 |
| Nov 17, 2004 | Completed final sign-off Nov 2005 | 1699 Van Ness Av | new connecting non exit stair between 3rd & 4th floor. infill of previous stair opening.Details
new connecting non exit stair between 3rd & 4th floor. infill of previous stair opening. | $65,000 |
| Jan 2, 2001 | Expired or cancelled expired May 2001 | 292 Ivy St | revised appl#200002172132r1 stair layout & details which were not sufficient outlined in previousDetails
revised appl#200002172132r1 stair layout & details which were not sufficient outlined in previous | $500 |
| Jul 19, 2000 | Expired or cancelled withdrawn May 2001 | 212 Stockton St | revision to application#9918747: add sheetrock fire proofing at stair openingDetails
revision to application#9918747: add sheetrock fire proofing at stair opening | $500 |