Ferrer Framing Construction Dba Af Gc.
- Based in
- San Jose
- On San Francisco permits
- Sep 2012 to Jun 2015
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Stairs permits
3 stairs permits: 3 completed. Typically 27 days from filing to permit and 420 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2015 | Completed final sign-off Jun 2017 | 1578 Fulton St | convert storage to garage, bedroom,bath, media rm, wash/dry @ basement. reconfigure plan to incl liv,dining,kitchen, 2 bedrm,2 baths, (n) stairs to basement @ 1st fl. reconfig incl liv,dining,kitchen,2 bedrm,2 baths,(n) stair to attic @ 2nd fl. add 2 bedrm, 2 baths, fam rm, windows & deck @ attic.Details
convert storage to garage, bedroom,bath, media rm, wash/dry @ basement. reconfigure plan to incl liv,dining,kitchen, 2 bedrm,2 baths, (n) stairs to basement @ 1st fl. reconfig incl liv,dining,kitchen,2 bedrm,2 baths,(n) stair to attic @ 2nd fl. add 2 bedrm, 2 baths, fam rm, windows & deck @ attic. | $1,050,000 |
| Apr 17, 2014 | Completed final sign-off May 2015 | 10 Loyola Tr | revision to app#201403070130. add decks at 2nd & 3rd floors @ rear yard. add interior stairway to roof @ 3rd floor. add stair penthouse, deck & mech.rm @ roof.Details
revision to app#201403070130. add decks at 2nd & 3rd floors @ rear yard. add interior stairway to roof @ 3rd floor. add stair penthouse, deck & mech.rm @ roof. | $10,000 |
| Mar 7, 2014 | Completed final sign-off May 2015 | 10 Loyola Tr | remove 3 story rear stairs at rear yard. 1st fl. convert storage at back of garage to bedroom, bath, and family room. stairs to 2nd fl unit 10. enclose area below 2nd fl at rear yard. create 1 hr egress from rear yard to street. 2nd fl reconfigure walls, add bath. remodel kitchen and bath. replaceDetails
remove 3 story rear stairs at rear yard. 1st fl. convert storage at back of garage to bedroom, bath, and family room. stairs to 2nd fl unit 10. enclose area below 2nd fl at rear yard. create 1 hr egress from rear yard to street. 2nd fl reconfigure walls, add bath. remodel kitchen and bath. replace | $245,000 |