16 permits filed for this property since 2000.
| Filed | Outcome | Address | Contractor | Work described on the permit | Declared cost |
|---|---|---|---|---|---|
| Apr 3, 2025 | Completed final sign-off Aug 2025 | 1578 Fulton St | Norcal Pro Construction | 2 (e) decks to remove (e) subfloor and replace with new including gaco waterproof system, new tile, install (e) guardrail. remove water damage bdrm sheetrock,r/r 3 lights.install linear drain on deck.Details
2 (e) decks to remove (e) subfloor and replace with new including gaco waterproof system, new tile, install (e) guardrail. remove water damage bdrm sheetrock,r/r 3 lights.install linear drain on deck. | $15,000 |
| Aug 30, 2022 | Completed final sign-off Sep 2022 | 1578 Fulton St | Mooney Builder | to comply with physical inspection report #cc 8536 to install handrail to main entry stairway. provide code compliant exhaust termination for laundry. install appropriate house numbers. rear yard handrail.Details
to comply with physical inspection report #cc 8536 to install handrail to main entry stairway. provide code compliant exhaust termination for laundry. install appropriate house numbers. rear yard handrail. | $6,000 |
| Nov 21, 2017 | Completed final sign-off Jan 2018 | 1578 Fulton St | A F General Contractors Inc | raise driveway- remove approx 8 feet of (e) drivway inside p.l. form and pour approx six inches higher to accomodate low clearance automobile. no work within the p.r.w.Details
raise driveway- remove approx 8 feet of (e) drivway inside p.l. form and pour approx six inches higher to accomodate low clearance automobile. no work within the p.r.w. | $7,650 |
| Aug 10, 2017 | Completed final sign-off Aug 2017 | 1578 Fulton St | A F General Contractors Inc | replace all windows at front (south) elevation in (e) openings w/ marvin ultimate alum clad wood windows. replace (2) entry doors with wood panel doors: u factor not > .32Details
replace all windows at front (south) elevation in (e) openings w/ marvin ultimate alum clad wood windows. replace (2) entry doors with wood panel doors: u factor not > .32 | $9,800 |
| May 30, 2017 | Completed final sign-off Jun 2017 | 1578 Fulton St | revision to 201605066738 & 201506098445: add wet bar at basement gym/media room.Details
revision to 201605066738 & 201506098445: add wet bar at basement gym/media room. | $750 | |
| Sep 28, 2016 | Completed final sign-off Jun 2017 | 1578 Fulton St | A F General Contractors Inc | revision to 201506097445 and 201605066738 - demo rear wing foundation and replace w/newDetails
revision to 201506097445 and 201605066738 - demo rear wing foundation and replace w/new | |
| Sep 9, 2016 | Never finaled issued Sep 2016, no final | 1578 Fulton St | street spaceDetails
street space | ||
| Jun 30, 2016 | Completed final sign-off Jun 2017 | 1578 Fulton St | San Francisco Fire Protection | sprinkler waterflow & supervisory system. install new control unit, heat detector above and pull station near panel in the garage area. install monitor modules to tie-in waterflow and 2 tamper switches to new panel. ti #2015-0609-8445 & 2016-0429-6130Details
sprinkler waterflow & supervisory system. install new control unit, heat detector above and pull station near panel in the garage area. install monitor modules to tie-in waterflow and 2 tamper switches to new panel. ti #2015-0609-8445 & 2016-0429-6130 | $2,800 |
| May 6, 2016 | Completed final sign-off Jun 2017 | 1578 Fulton St | A F General Contractors Inc | revision to 2015-0609-8445 - remove (2) 2 story bay @ east elevation. add (2) 8'x8' dormers. replace mudroom @ rear elevation with roof deck. remove bay @ 1st fl @ rear elevation. remove (e) stairs @ rear deck. replace fence @ rear deck - reconfigure kitchens @ both unitsDetails
revision to 2015-0609-8445 - remove (2) 2 story bay @ east elevation. add (2) 8'x8' dormers. replace mudroom @ rear elevation with roof deck. remove bay @ 1st fl @ rear elevation. remove (e) stairs @ rear deck. replace fence @ rear deck - reconfigure kitchens @ both units | $55,000 |
| Apr 29, 2016 | Completed final sign-off Jun 2017 | 1578 Fulton St | Califire Protection | new fire sprinkler system nfpa-13r for resident above and garage nfpa-13.Details
new fire sprinkler system nfpa-13r for resident above and garage nfpa-13. | $18,000 |
| Mar 1, 2016 | Never finaled issued Mar 2016, no final | 1578 Fulton St | street spaceDetails
street space | ||
| Jun 9, 2015 | Completed final sign-off Jun 2017 | 1578 Fulton St | Ferrer Framing Construction Dba Af Gc. | convert storage to garage, bedroom,bath, media rm, wash/dry @ basement. reconfigure plan to incl liv,dining,kitchen, 2 bedrm,2 baths, (n) stairs to basement @ 1st fl. reconfig incl liv,dining,kitchen,2 bedrm,2 baths,(n) stair to attic @ 2nd fl. add 2 bedrm, 2 baths, fam rm, windows & deck @ attic.Details
convert storage to garage, bedroom,bath, media rm, wash/dry @ basement. reconfigure plan to incl liv,dining,kitchen, 2 bedrm,2 baths, (n) stairs to basement @ 1st fl. reconfig incl liv,dining,kitchen,2 bedrm,2 baths,(n) stair to attic @ 2nd fl. add 2 bedrm, 2 baths, fam rm, windows & deck @ attic. | $1,050,000 |
| Nov 17, 2009 | Expired or cancelled expired Sep 2022 | 1580 Fulton St | remodel (e) bathroom, remove wall between bathroom & 1/2 bath, relocate door to bath. add sink to 1/2 bath.Details
remodel (e) bathroom, remove wall between bathroom & 1/2 bath, relocate door to bath. add sink to 1/2 bath. | $10,800 | |
| Jun 5, 2008 | Never finaled issued Jun 2008, no final | 1578 Fulton St | sidewalk permitDetails
sidewalk permit | ||
| Aug 15, 2003 | Completed final sign-off Dec 2003 | 1578 Fulton St | repair interior wall. remove tub and add shower and toilet.Details
repair interior wall. remove tub and add shower and toilet. | $4,798 | |
| Dec 19, 2001 | Expired or cancelled expired Jun 2002 | 1580 Fulton St | Mark's Roofing Co. | reroofingDetails
reroofing | $7,000 |
Who worked here
Everyone with a license on these permits, by role, with how many permits each is on.
- Contractors
- A F General Contractors Inc (4), Califire Protection, Ferrer Framing Construction Dba Af Gc., Mark's Roofing Co., Mooney Builder, Norcal Pro Construction, San Francisco Fire Protection
- Architects
- Bill Egan (3)
- Engineers
- D. Townsend Brown (2)
- Designers
- D. Townsend Brown
Find contractors for work like this
Starts from the last permit filed here; change it to describe your own project. Results cover every building: the city does not class this parcel as single-family, two-family or apartments.