Back to bathroom remodel contractors
Ferrer Framing Construction Dba Af Gc.
- Based in
- San Jose
- On San Francisco permits
- Sep 2012 to Jun 2015
- Last 24 months
- 0 permits filed
10 permits since 2000: 9 completed, 1 never finaled.
Of the 1 never-finaled permit, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Bathroom remodel permits
3 bathroom remodel permits: 3 completed. Typically 5 days from filing to permit and 420 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jun 9, 2015 | Completed final sign-off Jun 2017 | 1578 Fulton St | convert storage to garage, bedroom,bath, media rm, wash/dry @ basement. reconfigure plan to incl liv,dining,kitchen, 2 bedrm,2 baths, (n) stairs to basement @ 1st fl. reconfig incl liv,dining,kitchen,2 bedrm,2 baths,(n) stair to attic @ 2nd fl. add 2 bedrm, 2 baths, fam rm, windows & deck @ attic.Details
convert storage to garage, bedroom,bath, media rm, wash/dry @ basement. reconfigure plan to incl liv,dining,kitchen, 2 bedrm,2 baths, (n) stairs to basement @ 1st fl. reconfig incl liv,dining,kitchen,2 bedrm,2 baths,(n) stair to attic @ 2nd fl. add 2 bedrm, 2 baths, fam rm, windows & deck @ attic. | $1,050,000 |
| Nov 13, 2014 | Completed final sign-off Oct 2015 | 1248 Utah St | 1st fl remodel area behind garage to include media room, laundry, bedroom and bath. 2nd fl reconfig plan to include liv rm,din rm, kitchen, family rm, 1/2 bath. 3rd fl reconfig 3 bedrooms, 2 baths. replace deck at rear with smaller, enclose lightwell 3rd fl maher not reqDetails
1st fl remodel area behind garage to include media room, laundry, bedroom and bath. 2nd fl reconfig plan to include liv rm,din rm, kitchen, family rm, 1/2 bath. 3rd fl reconfig 3 bedrooms, 2 baths. replace deck at rear with smaller, enclose lightwell 3rd fl maher not req | $320,000 |
| Mar 7, 2014 | Completed final sign-off May 2015 | 10 Loyola Tr | remove 3 story rear stairs at rear yard. 1st fl. convert storage at back of garage to bedroom, bath, and family room. stairs to 2nd fl unit 10. enclose area below 2nd fl at rear yard. create 1 hr egress from rear yard to street. 2nd fl reconfigure walls, add bath. remodel kitchen and bath. replaceDetails
remove 3 story rear stairs at rear yard. 1st fl. convert storage at back of garage to bedroom, bath, and family room. stairs to 2nd fl unit 10. enclose area below 2nd fl at rear yard. create 1 hr egress from rear yard to street. 2nd fl reconfigure walls, add bath. remodel kitchen and bath. replace | $245,000 |