Back to kitchen remodel contractors
Federico Cusigch
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to Mar 2025
- Last 24 months
- 5 permits filed
71 permits since 2000: 65 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
15 kitchen remodel permits: 15 completed. Typically 0 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2021 | Completed final sign-off Oct 2023 | 77 Santa Rosa Av | interior residential renovations to include kitchen, master bedroom, master bath and closet improvents, (n) laundry closet, (n) heat pump water heater, upgrade electrical pane and wiring, and voluntry seismic upgrades.Details
interior residential renovations to include kitchen, master bedroom, master bath and closet improvents, (n) laundry closet, (n) heat pump water heater, upgrade electrical pane and wiring, and voluntry seismic upgrades. | $125,000 |
| Jul 15, 2021 | Completed final sign-off Apr 2023 | 1083 Portola Dr | remodel (e) kitchen and bathroom replace concrete steps at rear, add (2) shed dormer to upper level at rear, replace (7) wood windows in kind and add 2 skylights and (1) exterior doorDetails
remodel (e) kitchen and bathroom replace concrete steps at rear, add (2) shed dormer to upper level at rear, replace (7) wood windows in kind and add 2 skylights and (1) exterior door | $10,000 |
| Dec 30, 2015 | Completed final sign-off Mar 2016 | 1531 11th Av | cosmetic renovation of kitchen and 2 bathrooms, kitchen: new cabinets & counter tops,demo non-bearing wall between dining rm,new 4'-0" wide pass thru window to living rm,hall bath: new finishes,no plumbing/elec,master bath: new finishes-add 2nd sink & add'l gfci outlet at sink.Details
cosmetic renovation of kitchen and 2 bathrooms, kitchen: new cabinets & counter tops,demo non-bearing wall between dining rm,new 4'-0" wide pass thru window to living rm,hall bath: new finishes,no plumbing/elec,master bath: new finishes-add 2nd sink & add'l gfci outlet at sink. | $25,000 |
| Apr 27, 2015 | Completed final sign-off Dec 2016 | 559 19th Av | horizontal & vertical addition. (e)deck&stairs at the rear of bld will be removed at the 1/flr.(e)storage at g/flr will converted to living space 72 sq ft will be add to match new fl above. renovated(e)office&kitchen at 1/fl. add 1/2 and full bath. add new deck in rear 2nd level.Details
horizontal & vertical addition. (e)deck&stairs at the rear of bld will be removed at the 1/flr.(e)storage at g/flr will converted to living space 72 sq ft will be add to match new fl above. renovated(e)office&kitchen at 1/fl. add 1/2 and full bath. add new deck in rear 2nd level. | $75,000 |
| Mar 19, 2015 | Completed final sign-off May 2015 | 1112 Filbert St | kitchen renovation. removal (e) cabinetry, relocate sink, washing machine, fridge, range/oven to remain, install recessed lightingDetails
kitchen renovation. removal (e) cabinetry, relocate sink, washing machine, fridge, range/oven to remain, install recessed lighting | $15,000 |
| Nov 6, 2014 | Completed final sign-off Oct 2015 | 2550 22nd Av | remove existing deck and replace with a new deck per plan. first floor interior remodel include kitchen and relocate toilet per plans.Details
remove existing deck and replace with a new deck per plan. first floor interior remodel include kitchen and relocate toilet per plans. | $45,000 |
| Mar 10, 2014 | Completed final sign-off Nov 2014 | 217 Ellsworth St | kitchen remodel and parition wall removed kitchen and dining rmDetails
kitchen remodel and parition wall removed kitchen and dining rm | $25,000 |
| Sep 3, 2013 | Completed final sign-off Dec 2013 | 660 10th Av | interior residential kitchen remodel. new cabinets, appliances (in same location as existing) new laundry machine closet, 3 new solatube skylights. no structural workDetails
interior residential kitchen remodel. new cabinets, appliances (in same location as existing) new laundry machine closet, 3 new solatube skylights. no structural work | $15,000 |
| Jun 21, 2011 | Completed final sign-off Nov 2012 | 174 Jersey St | interior alteration, kitchen remodel, new bathroom, new concrete footings, new spiral staircase, new skylights (flat), new furnaceDetails
interior alteration, kitchen remodel, new bathroom, new concrete footings, new spiral staircase, new skylights (flat), new furnace | $55,000 |
| Jan 28, 2011 | Completed final sign-off May 2011 | 637 08th Av | remove counter tile, kitchen remove wall tile & sheetrock, remove old linoleum & install floor. (n) stone counter & tile backsplash. (n) eng. wood flooring. (no cabinets to be remove, painted).Details
remove counter tile, kitchen remove wall tile & sheetrock, remove old linoleum & install floor. (n) stone counter & tile backsplash. (n) eng. wood flooring. (no cabinets to be remove, painted). | $4,800 |
| Jan 20, 2010 | Completed final sign-off Jul 2010 | 2206 44th Av | repair corner stud from ground to roof on front of the house (left side) due to water damage. repair bath sub fl. dry rot. plumbing, new circuit for gfi, tile floor & walls, fixtures. kitchen. new sink, counter top. appliances, circuits and 6 lights on ceiling controlled by a dimmer switch.Details
repair corner stud from ground to roof on front of the house (left side) due to water damage. repair bath sub fl. dry rot. plumbing, new circuit for gfi, tile floor & walls, fixtures. kitchen. new sink, counter top. appliances, circuits and 6 lights on ceiling controlled by a dimmer switch. | $9,200 |
| Aug 19, 2008 | Completed final sign-off Feb 2009 | 341 Monticello St | remodel kitchen on 2nd floor - remove cabinets, open up walls, layout plumbing & electrical, remove partition wall, install new cabinets. electrical & plumbing on separate permit. no structural work.Details
remodel kitchen on 2nd floor - remove cabinets, open up walls, layout plumbing & electrical, remove partition wall, install new cabinets. electrical & plumbing on separate permit. no structural work. | $8,500 |
| Feb 12, 2008 | Completed final sign-off Jul 2009 | 3235 Folsom St | demolition of 2 decks and stairs to the yard. remodelling 2nd floor (within existing building envelope) into a sun room (a new kitchen was previously built), 2-new decks & stairs with fire wall.Details
demolition of 2 decks and stairs to the yard. remodelling 2nd floor (within existing building envelope) into a sun room (a new kitchen was previously built), 2-new decks & stairs with fire wall. | $85,000 |
| Oct 18, 2006 | Completed final sign-off Sep 2007 | 75 Lily St | renovation of bathrooms and kitchens no windows ,no doors. lighting will be flourcent in bathroom and kitchen no sheet rock . removal & no structural work.Details
renovation of bathrooms and kitchens no windows ,no doors. lighting will be flourcent in bathroom and kitchen no sheet rock . removal & no structural work. | $100,000 |
| Sep 20, 2004 | Completed final sign-off Nov 2004 | 15 Nobles Al | removal of plaster on ceiling and walls on kitchen, hallway, 2nd bath, due to water damage, sheetrocDetails
removal of plaster on ceiling and walls on kitchen, hallway, 2nd bath, due to water damage, sheetroc | $3,500 |