Federico Cusigch
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to Mar 2025
- Last 24 months
- 5 permits filed
71 permits since 2000: 65 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for deck across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Deck permits
4 deck permits: 4 completed. Typically 146 days from filing to permit and 309 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 27, 2015 | Completed final sign-off Dec 2016 | 559 19th Av | horizontal & vertical addition. (e)deck&stairs at the rear of bld will be removed at the 1/flr.(e)storage at g/flr will converted to living space 72 sq ft will be add to match new fl above. renovated(e)office&kitchen at 1/fl. add 1/2 and full bath. add new deck in rear 2nd level.Details
horizontal & vertical addition. (e)deck&stairs at the rear of bld will be removed at the 1/flr.(e)storage at g/flr will converted to living space 72 sq ft will be add to match new fl above. renovated(e)office&kitchen at 1/fl. add 1/2 and full bath. add new deck in rear 2nd level. | $75,000 |
| Nov 6, 2014 | Completed final sign-off Oct 2015 | 2550 22nd Av | remove existing deck and replace with a new deck per plan. first floor interior remodel include kitchen and relocate toilet per plans.Details
remove existing deck and replace with a new deck per plan. first floor interior remodel include kitchen and relocate toilet per plans. | $45,000 |
| Aug 24, 2012 | Completed final sign-off Dec 2012 | 370 Moscow St | replace (e) foundation as required & rebuild (e) deck at rear in kindDetails
replace (e) foundation as required & rebuild (e) deck at rear in kind | $12,500 |
| Feb 12, 2008 | Completed final sign-off Jul 2009 | 3235 Folsom St | demolition of 2 decks and stairs to the yard. remodelling 2nd floor (within existing building envelope) into a sun room (a new kitchen was previously built), 2-new decks & stairs with fire wall.Details
demolition of 2 decks and stairs to the yard. remodelling 2nd floor (within existing building envelope) into a sun room (a new kitchen was previously built), 2-new decks & stairs with fire wall. | $85,000 |