Back to bathroom remodel contractors
Federico Cusigch
- Based in
- San Francisco
- On San Francisco permits
- Jul 2002 to Mar 2025
- Last 24 months
- 5 permits filed
71 permits since 2000: 65 completed, 2 never finaled, 4 expired or cancelled.
Of the 2 never-finaled permits, 1 is 5 to 10 years old, 1 is over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
18 bathroom remodel permits: 17 completed, 1 never finaled. Typically 0 days from filing to permit and 176 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Nov 16, 2021 | Completed final sign-off Oct 2023 | 77 Santa Rosa Av | interior residential renovations to include kitchen, master bedroom, master bath and closet improvents, (n) laundry closet, (n) heat pump water heater, upgrade electrical pane and wiring, and voluntry seismic upgrades.Details
interior residential renovations to include kitchen, master bedroom, master bath and closet improvents, (n) laundry closet, (n) heat pump water heater, upgrade electrical pane and wiring, and voluntry seismic upgrades. | $125,000 |
| Jul 15, 2021 | Completed final sign-off Apr 2023 | 1083 Portola Dr | remodel (e) kitchen and bathroom replace concrete steps at rear, add (2) shed dormer to upper level at rear, replace (7) wood windows in kind and add 2 skylights and (1) exterior doorDetails
remodel (e) kitchen and bathroom replace concrete steps at rear, add (2) shed dormer to upper level at rear, replace (7) wood windows in kind and add 2 skylights and (1) exterior door | $10,000 |
| Jun 4, 2021 | Completed final sign-off Aug 2021 | 1150 Wayland St | bathroom remodel:size 7'5"x7'5" removed bathtub,wash basin,toilet, medicine cabinet,install new ones, remove wall and floor tile,provide plumbing connection for double wash basin,202m/o gfci outlets and air fan,install a pocket door and finish it.no (n) wall and no (e) wall relocation w/ cec150.0k5Details
bathroom remodel:size 7'5"x7'5" removed bathtub,wash basin,toilet, medicine cabinet,install new ones, remove wall and floor tile,provide plumbing connection for double wash basin,202m/o gfci outlets and air fan,install a pocket door and finish it.no (n) wall and no (e) wall relocation w/ cec150.0k5 | $14,500 |
| Oct 15, 2019 | Completed final sign-off Nov 2020 | 3461 Sacramento St | revision to app#201910104152 on bathroom 1st floor on permit the present of dry rot under the floor due to a broken sewer lines that needed to be replace and redirect water supply line and dry rot repairs.Details
revision to app#201910104152 on bathroom 1st floor on permit the present of dry rot under the floor due to a broken sewer lines that needed to be replace and redirect water supply line and dry rot repairs. | $4,500 |
| May 26, 2017 | Completed final sign-off Jun 2017 | 272 Upper Tr | small bathroom remodle (5'x7') on 2nd floor, remove existing wall & floor tile, replace bathtub & wash basin, plumbing will lreamin, install new tile on tub & floor, install heating floorDetails
small bathroom remodle (5'x7') on 2nd floor, remove existing wall & floor tile, replace bathtub & wash basin, plumbing will lreamin, install new tile on tub & floor, install heating floor | $13,941 |
| Nov 1, 2016 | Never finaled issued May 2017, no final | 81 Aztec St | (n) entry/stair addition and renovate (e) second level. (n) addition & renovation at first level to create (n) bedrooms & baths.Details
(n) entry/stair addition and renovate (e) second level. (n) addition & renovation at first level to create (n) bedrooms & baths. | $312,000 |
| Jan 29, 2016 | Completed final sign-off Mar 2016 | 2195 Green St | bathroom remodel: replace bathtub, install new shower valve, replace ceramic floor and wall, install new wash basin, replace door for 2 pocket door, install a ceiling fan. no alteration to layout. all new lights are led.Details
bathroom remodel: replace bathtub, install new shower valve, replace ceramic floor and wall, install new wash basin, replace door for 2 pocket door, install a ceiling fan. no alteration to layout. all new lights are led. | $7,500 |
| Dec 30, 2015 | Completed final sign-off Mar 2016 | 1531 11th Av | cosmetic renovation of kitchen and 2 bathrooms, kitchen: new cabinets & counter tops,demo non-bearing wall between dining rm,new 4'-0" wide pass thru window to living rm,hall bath: new finishes,no plumbing/elec,master bath: new finishes-add 2nd sink & add'l gfci outlet at sink.Details
cosmetic renovation of kitchen and 2 bathrooms, kitchen: new cabinets & counter tops,demo non-bearing wall between dining rm,new 4'-0" wide pass thru window to living rm,hall bath: new finishes,no plumbing/elec,master bath: new finishes-add 2nd sink & add'l gfci outlet at sink. | $25,000 |
| Jun 4, 2015 | Completed final sign-off Dec 2015 | 304 Moultrie St | new master bathroom (enlarge existing) and relocate laundry roomDetails
new master bathroom (enlarge existing) and relocate laundry room | $20,000 |
| May 15, 2015 | Completed final sign-off Jul 2015 | 304 Moultrie St | main bathroom remodel: removed bathtub, double wash basin, removed floor tiles, wall tiles, install new tub, new double wash basin, tile surrouned walls on tub, tile floors, change closet door; on 1st floor.Details
main bathroom remodel: removed bathtub, double wash basin, removed floor tiles, wall tiles, install new tub, new double wash basin, tile surrouned walls on tub, tile floors, change closet door; on 1st floor. | $6,500 |
| Apr 27, 2015 | Completed final sign-off Dec 2016 | 559 19th Av | horizontal & vertical addition. (e)deck&stairs at the rear of bld will be removed at the 1/flr.(e)storage at g/flr will converted to living space 72 sq ft will be add to match new fl above. renovated(e)office&kitchen at 1/fl. add 1/2 and full bath. add new deck in rear 2nd level.Details
horizontal & vertical addition. (e)deck&stairs at the rear of bld will be removed at the 1/flr.(e)storage at g/flr will converted to living space 72 sq ft will be add to match new fl above. renovated(e)office&kitchen at 1/fl. add 1/2 and full bath. add new deck in rear 2nd level. | $75,000 |
| Oct 29, 2013 | Completed final sign-off Aug 2014 | 1112 Filbert St | interior residential remodel of master bath and 2nd bathroom. renovations to include new fixtures and finishes. new wall mounted gas tankless hot water heater to replace extg tank system.Details
interior residential remodel of master bath and 2nd bathroom. renovations to include new fixtures and finishes. new wall mounted gas tankless hot water heater to replace extg tank system. | $9,000 |
| Jun 21, 2011 | Completed final sign-off Nov 2012 | 174 Jersey St | interior alteration, kitchen remodel, new bathroom, new concrete footings, new spiral staircase, new skylights (flat), new furnaceDetails
interior alteration, kitchen remodel, new bathroom, new concrete footings, new spiral staircase, new skylights (flat), new furnace | $55,000 |
| Jan 28, 2011 | Completed final sign-off Jul 2011 | 670 Miramar Av | to legalize bathroom at 2nd flDetails
to legalize bathroom at 2nd fl | $1,800 |
| Jan 20, 2010 | Completed final sign-off Jul 2010 | 2206 44th Av | repair corner stud from ground to roof on front of the house (left side) due to water damage. repair bath sub fl. dry rot. plumbing, new circuit for gfi, tile floor & walls, fixtures. kitchen. new sink, counter top. appliances, circuits and 6 lights on ceiling controlled by a dimmer switch.Details
repair corner stud from ground to roof on front of the house (left side) due to water damage. repair bath sub fl. dry rot. plumbing, new circuit for gfi, tile floor & walls, fixtures. kitchen. new sink, counter top. appliances, circuits and 6 lights on ceiling controlled by a dimmer switch. | $9,200 |
| Oct 18, 2006 | Completed final sign-off Sep 2007 | 75 Lily St | renovation of bathrooms and kitchens no windows ,no doors. lighting will be flourcent in bathroom and kitchen no sheet rock . removal & no structural work.Details
renovation of bathrooms and kitchens no windows ,no doors. lighting will be flourcent in bathroom and kitchen no sheet rock . removal & no structural work. | $100,000 |
| Sep 20, 2004 | Completed final sign-off Nov 2004 | 15 Nobles Al | removal of plaster on ceiling and walls on kitchen, hallway, 2nd bath, due to water damage, sheetrocDetails
removal of plaster on ceiling and walls on kitchen, hallway, 2nd bath, due to water damage, sheetroc | $3,500 |
| Aug 4, 2003 | Completed final sign-off Feb 2004 | 645 Peralta Av | adding a family room and bathroom. replacing existing windows with same size vinyl windows. add slidDetails
adding a family room and bathroom. replacing existing windows with same size vinyl windows. add slid | $23,000 |