Back to kitchen remodel contractors
Fay Tat Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Mar 2025
- Last 24 months
- 1 permit filed
81 permits since 2000: 57 completed, 2 in progress, 15 never finaled, 7 expired or cancelled.
Of the 15 never-finaled permits, 3 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
25 kitchen remodel permits: 18 completed, 1 in progress, 4 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 154 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2024 | In progress issued Jul 2024 | 1175 Capitol Av | interior remodel: remodel full baths & kitchen. 1 (n) full bath & officeDetails
interior remodel: remodel full baths & kitchen. 1 (n) full bath & office | $65,000 |
| Mar 27, 2018 | Completed final sign-off Mar 2019 | 320 Santa Clara Av | interior remodel of kitchen and den changing window in kind at main level at kitchen at south elevationDetails
interior remodel of kitchen and den changing window in kind at main level at kitchen at south elevation | $50,000 |
| Aug 23, 2016 | Never finaled issued Aug 2016, no final | 640 Victoria St | remove kitchen cabinets. no alteration of wall, window & doorDetails
remove kitchen cabinets. no alteration of wall, window & door | $1,000 |
| Jul 28, 2016 | Completed final sign-off Nov 2016 | 3622 Quintara St | remodel (e) kitchen upgrade light fixtures in kitchen, dining and living roomsDetails
remodel (e) kitchen upgrade light fixtures in kitchen, dining and living rooms | $12,000 |
| Jul 6, 2016 | Completed final sign-off Dec 2016 | 324 Hanover St | construct 2 rear decks w/stairs at rear of (e) bld. add 2 bedroom, 1 family room 2 full bathrooms and laundry rm on (e) grnd flr. add 1 full bathroom & remodel (e) kitchen and bathroom on 2nd flr. replace (e) gypboard, plumb, ele on 2ndDetails
construct 2 rear decks w/stairs at rear of (e) bld. add 2 bedroom, 1 family room 2 full bathrooms and laundry rm on (e) grnd flr. add 1 full bathroom & remodel (e) kitchen and bathroom on 2nd flr. replace (e) gypboard, plumb, ele on 2nd | $110,000 |
| Mar 2, 2016 | Completed final sign-off Jul 2016 | 1863 Donner Av | remodel kitchen and one bathroom on g/f.Details
remodel kitchen and one bathroom on g/f. | $20,000 |
| Apr 22, 2015 | Completed final sign-off Oct 2020 | 2829 25th St | horizontal & vertical addition to a single family building for 4 residential units including (n) bathrooms, bedrooms & kitchens for all units.Details
horizontal & vertical addition to a single family building for 4 residential units including (n) bathrooms, bedrooms & kitchens for all units. | $800,000 |
| Mar 4, 2015 | Completed final sign-off Sep 2016 | 566 Congo St | comply with 201525711, no change to exterior envelope, remodel bathrooms, upgrade structural where interior walls removed, remodel kitchen, new finishes and fixtures in kitchen and 2 baths.Details
comply with 201525711, no change to exterior envelope, remodel bathrooms, upgrade structural where interior walls removed, remodel kitchen, new finishes and fixtures in kitchen and 2 baths. | $15,000 |
| Jul 24, 2014 | Completed final sign-off May 2015 | 2943 Sacramento St | kitchen remodel including: 1)change cabinet. relocate stove, dishwasher. 2)add electrical lights and outlets. 3)remove extg non bearing wall, finish extg wood floor.Details
kitchen remodel including: 1)change cabinet. relocate stove, dishwasher. 2)add electrical lights and outlets. 3)remove extg non bearing wall, finish extg wood floor. | $5,000 |
| Mar 25, 2014 | Never finaled issued Mar 2014, no final | 3974 Cesar Chavez St | remodel (e) kitchen at 2nd floor. painting.Details
remodel (e) kitchen at 2nd floor. painting. | $12,000 |
| Dec 26, 2013 | Never finaled issued Dec 2013, no final | 4187 24th St | remodel kitchen and 1 half bath. to comply with 150(k) 8 & 10Details
remodel kitchen and 1 half bath. to comply with 150(k) 8 & 10 | $28,000 |
| Sep 11, 2013 | Completed final sign-off May 2014 | 147 Peralta Av | alteration upper & lower units. new bedrm, bathrm,lanundry area at existing 1st floor useable space. add new spiral stair connect to garage. remodel/relocate (e)kitchen & bathroom at 2nd floor & 3rd floor. add 2 dormers. replace (e)front windows inkind w/aluminum wood clad. replace (e)window @ rear.Details
alteration upper & lower units. new bedrm, bathrm,lanundry area at existing 1st floor useable space. add new spiral stair connect to garage. remodel/relocate (e)kitchen & bathroom at 2nd floor & 3rd floor. add 2 dormers. replace (e)front windows inkind w/aluminum wood clad. replace (e)window @ rear. | $78,000 |
| Oct 12, 2012 | Completed final sign-off Apr 2013 | 2409 18th Av | work in apt. #2: kitchen and bathroom remodel. lighting to comply with cec 180kDetails
work in apt. #2: kitchen and bathroom remodel. lighting to comply with cec 180k | $14,500 |
| Jul 24, 2012 | Completed final sign-off Jan 2013 | 438 34th Av | kitchen remodel for both units. lighting will comply w/title 24.Details
kitchen remodel for both units. lighting will comply w/title 24. | $25,000 |
| May 4, 2012 | Completed final sign-off Jul 2012 | 100 Carmel St | one kitchen remodel, non structural in kindDetails
one kitchen remodel, non structural in kind | $7,000 |
| Apr 27, 2012 | Completed final sign-off Jul 2012 | 15 Red Rock Wy | to comply nov#201211263 & 201211264. repair plumbing & electrical. install baseboards, new fireplace mantel & plaster wall around fireplace to make smooth. repair fireplace. install kitchen & bath counter tops only.Details
to comply nov#201211263 & 201211264. repair plumbing & electrical. install baseboards, new fireplace mantel & plaster wall around fireplace to make smooth. repair fireplace. install kitchen & bath counter tops only. | $9,000 |
| Jan 18, 2012 | Completed final sign-off Mar 2012 | 514 Cayuga Av | remodel kitchen on 2nd floor. layout to stay the same with new appliances and cabinets. (all(n) lighting must comply with cec 150 (k) 8)Details
remodel kitchen on 2nd floor. layout to stay the same with new appliances and cabinets. (all(n) lighting must comply with cec 150 (k) 8) | $5,000 |
| Apr 12, 2010 | Completed final sign-off May 2010 | 20 Crestline Dr | unit# 4 at 2nd floor. update kitchn cabinet and kitchen sink. no change in equipments.Details
unit# 4 at 2nd floor. update kitchn cabinet and kitchen sink. no change in equipments. | $5,000 |
| Sep 23, 2008 | Completed final sign-off Jan 2009 | 1069 York St | alteration to kitchen and half-bath on second floorDetails
alteration to kitchen and half-bath on second floor | $15,000 |
| Jun 20, 2008 | Expired or cancelled expired Jan 2017 | 3735 Anza St | interior remodel: unit#7-relocate kitchen & study rm, add 1 bathrm, master bedrm w/new bathrm, remodel (e) bathrms & bedrms, unit #4,5,6-remodel (e) bathrms & kitchen, relocate entry doors & add 1 door to living rm, unit #1,2,3-remodel (e) bathrm/kitchen, relocate entry doors, non structural partitiDetails
interior remodel: unit#7-relocate kitchen & study rm, add 1 bathrm, master bedrm w/new bathrm, remodel (e) bathrms & bedrms, unit #4,5,6-remodel (e) bathrms & kitchen, relocate entry doors & add 1 door to living rm, unit #1,2,3-remodel (e) bathrm/kitchen, relocate entry doors, non structural partiti | $100,000 |
| Jun 13, 2008 | Never finaled issued Jun 2008, no final | 195 Ney St | remodel existing kitchen. cabinets, counters, flooring replaced new lighting to be ove 50% fluorescent.Details
remodel existing kitchen. cabinets, counters, flooring replaced new lighting to be ove 50% fluorescent. | $11,000 |
| Mar 6, 2007 | Completed final sign-off Sep 2007 | 1075 York St | no exzterior work except painting & replace windows. interior remodeling of (e) building 2nd & groundfloor. new kitchen, remodel (e) 2 baths, repair stair, replace windows at rear of building with same size. repair/replace plaster w/ (n) sheetrock paint. no structural work.Details
no exzterior work except painting & replace windows. interior remodeling of (e) building 2nd & groundfloor. new kitchen, remodel (e) 2 baths, repair stair, replace windows at rear of building with same size. repair/replace plaster w/ (n) sheetrock paint. no structural work. | $80,000 |
| Sep 13, 2004 | Completed final sign-off Jan 2005 | 1536 Lake St | rehab kitchen cabinetsDetails
rehab kitchen cabinets | $12,000 |
| Apr 27, 2004 | Completed final sign-off Jul 2004 | 1425 Rivera St | add 1 full bath room&relocate kitchen on exist grd fl. convert exist kitchen to bedroom use per planDetails
add 1 full bath room&relocate kitchen on exist grd fl. convert exist kitchen to bedroom use per plan | $12,000 |
| Apr 1, 2003 | Expired or cancelled expired Sep 2004 | 191 Pine St | install kitchen equipment & type 1 grease hood, install grease exhust duct and make0up fan w/ducts.pDetails
install kitchen equipment & type 1 grease hood, install grease exhust duct and make0up fan w/ducts.p | $22,000 |