Back to bathroom remodel contractors
Fay Tat Construction Co
- Based in
- San Francisco
- On San Francisco permits
- Sep 2001 to Mar 2025
- Last 24 months
- 1 permit filed
81 permits since 2000: 57 completed, 2 in progress, 15 never finaled, 7 expired or cancelled.
Of the 15 never-finaled permits, 3 are 5 to 10 years old, 12 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
34 bathroom remodel permits: 27 completed, 1 in progress, 4 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 179 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 23, 2024 | In progress issued Jul 2024 | 1175 Capitol Av | interior remodel: remodel full baths & kitchen. 1 (n) full bath & officeDetails
interior remodel: remodel full baths & kitchen. 1 (n) full bath & office | $65,000 |
| Jun 25, 2020 | Completed final sign-off Oct 2024 | 1590 25th Av | 1/f: add 2 full bathrooms, den, office and media room.Details
1/f: add 2 full bathrooms, den, office and media room. | $50,000 |
| Jan 23, 2018 | Never finaled issued Mar 2018, no final | 1356 Grant Av | commercial: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. comply with wood frame seismic retrofit program on 1st fl. ada bathrooms. (residential pa #201803052840)Details
commercial: soft story retrofit per sfebc chapter 4d engineering criteria 2016 cebc appendix a-4. comply with wood frame seismic retrofit program on 1st fl. ada bathrooms. (residential pa #201803052840) | $80,000 |
| Jan 19, 2017 | Completed final sign-off Nov 2017 | 370 Guttenberg St | 1st floor: add two bedrooms, two baths, a home office area w/wet bar. in 2nd floor: convert (e) closet into a full bath. add a rear deck.Details
1st floor: add two bedrooms, two baths, a home office area w/wet bar. in 2nd floor: convert (e) closet into a full bath. add a rear deck. | $65,000 |
| Nov 17, 2016 | Completed final sign-off Feb 2017 | 195 Rome St | remodel (e) bathroom on uppler level, no change in walls and opening layout; high efficacy lighting or controlled by manuel-on sensor with high efficacy main light.Details
remodel (e) bathroom on uppler level, no change in walls and opening layout; high efficacy lighting or controlled by manuel-on sensor with high efficacy main light. | $7,000 |
| Jul 6, 2016 | Completed final sign-off Dec 2016 | 324 Hanover St | construct 2 rear decks w/stairs at rear of (e) bld. add 2 bedroom, 1 family room 2 full bathrooms and laundry rm on (e) grnd flr. add 1 full bathroom & remodel (e) kitchen and bathroom on 2nd flr. replace (e) gypboard, plumb, ele on 2ndDetails
construct 2 rear decks w/stairs at rear of (e) bld. add 2 bedroom, 1 family room 2 full bathrooms and laundry rm on (e) grnd flr. add 1 full bathroom & remodel (e) kitchen and bathroom on 2nd flr. replace (e) gypboard, plumb, ele on 2nd | $110,000 |
| Mar 7, 2016 | Completed final sign-off Oct 2016 | 1863 Donner Av | revision to app#201603021025 to comply with complaint #201601861 dated 2/9/16. to add one full bathroom on 2nd flr and replace extg damaged sheet rock. plumbing and electrical on 2nd floor per plan.Details
revision to app#201603021025 to comply with complaint #201601861 dated 2/9/16. to add one full bathroom on 2nd flr and replace extg damaged sheet rock. plumbing and electrical on 2nd floor per plan. | $25,000 |
| Mar 2, 2016 | Completed final sign-off Jul 2016 | 1863 Donner Av | remodel kitchen and one bathroom on g/f.Details
remodel kitchen and one bathroom on g/f. | $20,000 |
| Feb 1, 2016 | Completed final sign-off Aug 2016 | 1863 Donner Av | to comply with n.o.v. #201572442, items #2 and #7: to add 2 bedrooms, 2 full bathrooms and laundry on extg ground floor per plan.Details
to comply with n.o.v. #201572442, items #2 and #7: to add 2 bedrooms, 2 full bathrooms and laundry on extg ground floor per plan. | $50,000 |
| Jul 22, 2015 | Never finaled issued Jul 2015, no final | 3974 Cesar Chavez St | remodel 2/f bathroom: no walls moved, removed or added or infilled. all (e) layouts to remain unchanged.Details
remodel 2/f bathroom: no walls moved, removed or added or infilled. all (e) layouts to remain unchanged. | $12,700 |
| Apr 22, 2015 | Completed final sign-off Oct 2020 | 2829 25th St | horizontal & vertical addition to a single family building for 4 residential units including (n) bathrooms, bedrooms & kitchens for all units.Details
horizontal & vertical addition to a single family building for 4 residential units including (n) bathrooms, bedrooms & kitchens for all units. | $800,000 |
| Mar 4, 2015 | Completed final sign-off Sep 2016 | 566 Congo St | comply with 201525711, no change to exterior envelope, remodel bathrooms, upgrade structural where interior walls removed, remodel kitchen, new finishes and fixtures in kitchen and 2 baths.Details
comply with 201525711, no change to exterior envelope, remodel bathrooms, upgrade structural where interior walls removed, remodel kitchen, new finishes and fixtures in kitchen and 2 baths. | $15,000 |
| Sep 8, 2014 | Completed final sign-off May 2015 | 2943 Sacramento St | renovate (e) bath room: increase (e) shower pan, (n) tile wall, (n) shower door and (n) plumbing fixturesDetails
renovate (e) bath room: increase (e) shower pan, (n) tile wall, (n) shower door and (n) plumbing fixtures | $3,000 |
| Jun 27, 2014 | Never finaled issued Aug 2014, no final | 3974 Cesar Chavez St | remodel ground floor bathroom. new water heater and furnace. two new skylights at roof. legalized offce at ground fl.Details
remodel ground floor bathroom. new water heater and furnace. two new skylights at roof. legalized offce at ground fl. | $13,000 |
| Dec 26, 2013 | Never finaled issued Dec 2013, no final | 4187 24th St | remodel kitchen and 1 half bath. to comply with 150(k) 8 & 10Details
remodel kitchen and 1 half bath. to comply with 150(k) 8 & 10 | $28,000 |
| Oct 2, 2013 | Expired or cancelled expired Nov 2022 | 462 Arch St | 2-story rear addition including 2 new bedrooms at ground floor & extend 2 (e) bedrooms at 2nd floor. add 1 new bathroom & storage at ground floor.Details
2-story rear addition including 2 new bedrooms at ground floor & extend 2 (e) bedrooms at 2nd floor. add 1 new bathroom & storage at ground floor. | $50,000 |
| Sep 11, 2013 | Completed final sign-off May 2014 | 147 Peralta Av | alteration upper & lower units. new bedrm, bathrm,lanundry area at existing 1st floor useable space. add new spiral stair connect to garage. remodel/relocate (e)kitchen & bathroom at 2nd floor & 3rd floor. add 2 dormers. replace (e)front windows inkind w/aluminum wood clad. replace (e)window @ rear.Details
alteration upper & lower units. new bedrm, bathrm,lanundry area at existing 1st floor useable space. add new spiral stair connect to garage. remodel/relocate (e)kitchen & bathroom at 2nd floor & 3rd floor. add 2 dormers. replace (e)front windows inkind w/aluminum wood clad. replace (e)window @ rear. | $78,000 |
| Oct 12, 2012 | Completed final sign-off Apr 2013 | 2409 18th Av | work in apt. #2: kitchen and bathroom remodel. lighting to comply with cec 180kDetails
work in apt. #2: kitchen and bathroom remodel. lighting to comply with cec 180k | $14,500 |
| Apr 27, 2012 | Completed final sign-off Jul 2012 | 15 Red Rock Wy | to comply nov#201211263 & 201211264. repair plumbing & electrical. install baseboards, new fireplace mantel & plaster wall around fireplace to make smooth. repair fireplace. install kitchen & bath counter tops only.Details
to comply nov#201211263 & 201211264. repair plumbing & electrical. install baseboards, new fireplace mantel & plaster wall around fireplace to make smooth. repair fireplace. install kitchen & bath counter tops only. | $9,000 |
| Nov 15, 2010 | Completed final sign-off Nov 2010 | 56 Newburg St | revision to pa# 2009-0617-0634-master bathroom got extend to 2'x7' (in garage) & an extra step from staircase landing into family roomDetails
revision to pa# 2009-0617-0634-master bathroom got extend to 2'x7' (in garage) & an extra step from staircase landing into family room | |
| Oct 1, 2010 | Completed final sign-off Aug 2011 | 140 Genebern Wy | remodel existing ground floor space to create new family room, bath rooom, sauna, laundry, & mechanical room.new concrete steps on grade to existing rear yard.Details
remodel existing ground floor space to create new family room, bath rooom, sauna, laundry, & mechanical room.new concrete steps on grade to existing rear yard. | $55,000 |
| Jul 26, 2010 | Completed final sign-off May 2011 | 2638 19th Av | add new master suite and bathroom on ground/ garage floor. relocate existin water heater and furnaceDetails
add new master suite and bathroom on ground/ garage floor. relocate existin water heater and furnace | $20,000 |
| Sep 14, 2009 | Completed final sign-off Apr 2010 | 1125 Leavenworth St | interior remodeling - ground floor: add new closet, bathroom & remodel bar sink. 2nd floor: close door at living room & relocate sink & dishwasher. add bathroom & clsoet, remodel (e) bathroom & fixture.Details
interior remodeling - ground floor: add new closet, bathroom & remodel bar sink. 2nd floor: close door at living room & relocate sink & dishwasher. add bathroom & clsoet, remodel (e) bathroom & fixture. | $60,000 |
| Sep 14, 2009 | Completed final sign-off Apr 2010 | 2 Kimball Pl | interior remodeling: remove sauna & add closet to master bedroom, remodel & remove door master bathroom.Details
interior remodeling: remove sauna & add closet to master bedroom, remodel & remove door master bathroom. | $5,000 |
| Sep 23, 2008 | Completed final sign-off Jan 2009 | 1069 York St | alteration to kitchen and half-bath on second floorDetails
alteration to kitchen and half-bath on second floor | $15,000 |
| Apr 16, 2007 | Completed final sign-off Nov 2008 | 75 Lakeshore Dr | convert e storage space on ground floor into 2 bedrooms, 2 bath,1 family room, and 1 laundry roomDetails
convert e storage space on ground floor into 2 bedrooms, 2 bath,1 family room, and 1 laundry room | $30,000 |
| Mar 23, 2007 | Completed final sign-off Jul 2007 | 550 Myra Wy | remodel second flr. 1 bathroom-flourecent lighting.Details
remodel second flr. 1 bathroom-flourecent lighting. | $5,000 |
| Mar 6, 2007 | Completed final sign-off Sep 2007 | 1075 York St | no exzterior work except painting & replace windows. interior remodeling of (e) building 2nd & groundfloor. new kitchen, remodel (e) 2 baths, repair stair, replace windows at rear of building with same size. repair/replace plaster w/ (n) sheetrock paint. no structural work.Details
no exzterior work except painting & replace windows. interior remodeling of (e) building 2nd & groundfloor. new kitchen, remodel (e) 2 baths, repair stair, replace windows at rear of building with same size. repair/replace plaster w/ (n) sheetrock paint. no structural work. | $80,000 |
| Mar 6, 2006 | Completed final sign-off Aug 2006 | 395 Country Club Dr | add rooms at ground floor. computer room, office & full bath.Details
add rooms at ground floor. computer room, office & full bath. | $17,000 |
| Nov 19, 2004 | Completed final sign-off Dec 2005 | 1485 Dolores St | remodel 3 bathroom/remodel 1 kchnDetails
remodel 3 bathroom/remodel 1 kchn | $25,000 |
| Apr 27, 2004 | Completed final sign-off Jul 2004 | 1425 Rivera St | add 1 full bath room&relocate kitchen on exist grd fl. convert exist kitchen to bedroom use per planDetails
add 1 full bath room&relocate kitchen on exist grd fl. convert exist kitchen to bedroom use per plan | $12,000 |
| Nov 19, 2003 | Completed final sign-off Apr 2004 | 395 Head St | to add 1 playroom,2bedroom,1 full bath,laundry on (e) g/fDetails
to add 1 playroom,2bedroom,1 full bath,laundry on (e) g/f | $18,000 |
| Mar 7, 2002 | Completed final sign-off Sep 2002 | 2631 24th Av | toadd two bed rooms. one full bath and one laundry room/storage on existing ground flr per planDetails
toadd two bed rooms. one full bath and one laundry room/storage on existing ground flr per plan | $25,000 |
| Sep 4, 2001 | Expired or cancelled expired Mar 2002 | 234 Silver Av | add 2 bedrooms/1 full bath/1 laundry room/storage on (e) g/floorDetails
add 2 bedrooms/1 full bath/1 laundry room/storage on (e) g/floor | $12,000 |