Fay Construction & Restoration Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Jul 2026
- Last 24 months
- 4 permits filed
114 permits since 2000: 95 completed, 6 in progress, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for stairs across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Stairs permits
13 stairs permits: 11 completed, 2 in progress. Typically 6 days from filing to permit and 382 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| May 12, 2026 | In progress issued May 2026 | 425 Pacheco St | replacement in kind of (2) windows in front of house, street facing alum clad wood, (2) patio doors in rear. termite and rot damage replacement in front of house @ se corner and under front stairs, and in rear of building along w wall. replace sheetrock in kitchen ceiling & main level bedroom.Details
replacement in kind of (2) windows in front of house, street facing alum clad wood, (2) patio doors in rear. termite and rot damage replacement in front of house @ se corner and under front stairs, and in rear of building along w wall. replace sheetrock in kitchen ceiling & main level bedroom. | $18,000 |
| Dec 16, 2022 | In progress issued Jan 2025 | 1448 Plymouth Av | const n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass.Details
const n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass. | $100,000 |
| Oct 12, 2021 | Completed final sign-off Dec 2023 | 180 09th Av | interior remodel at 2nd fl. enclose e lightwell at norths side, 1st and 2nd fl. replace e wood stair at rear with new metal spiral, seismic improvements on 1st flDetails
interior remodel at 2nd fl. enclose e lightwell at norths side, 1st and 2nd fl. replace e wood stair at rear with new metal spiral, seismic improvements on 1st fl | $250,000 |
| Aug 20, 2020 | Completed final sign-off Feb 2022 | 333 Twin Peaks Bl | remodel master bathroom(~9'x12'): removal & replace sheetrock, tile shower walls & floor, & fixtures. repair of 1st fl deck(~4'x18') & stairs and 2nd fl deck & frame(~7'x20') at rear: replace in kind of frame & deck boards.(<50% of structure). replace 6 wood windows (2nd fl) on rear. all in kind.Details
remodel master bathroom(~9'x12'): removal & replace sheetrock, tile shower walls & floor, & fixtures. repair of 1st fl deck(~4'x18') & stairs and 2nd fl deck & frame(~7'x20') at rear: replace in kind of frame & deck boards.(<50% of structure). replace 6 wood windows (2nd fl) on rear. all in kind. | $43,000 |
| Feb 16, 2017 | Completed final sign-off Mar 2018 | 373 Clipper St | exterior improvements to include new entry door and replacement of front entry stair in kind. new interior coat closet.Details
exterior improvements to include new entry door and replacement of front entry stair in kind. new interior coat closet. | $5,000 |
| Jun 9, 2016 | Completed final sign-off Jul 2017 | 541 Prentiss St | 1/f- relocate kitchen/dining to 1/f, new 1/2 bath/laundry/living room, revert interior stair, replace rear door, strengthen foundation/framing, new tankess water heater/furnace. 2/f- convert (e) kitchen/dining to bedroom/bath, dining to family room, revert (e) stair. new skylite, upgrade elec/plum/mDetails
1/f- relocate kitchen/dining to 1/f, new 1/2 bath/laundry/living room, revert interior stair, replace rear door, strengthen foundation/framing, new tankess water heater/furnace. 2/f- convert (e) kitchen/dining to bedroom/bath, dining to family room, revert (e) stair. new skylite, upgrade elec/plum/m | $150,000 |
| Oct 23, 2015 | Completed final sign-off Jun 2019 | 900 Filbert St | interior renovation of 3 unit condo work includes replacing interior stairs with (n) elevator, renvoation of kitchens, bathrooms, bedrooms, additon of 3 bathrooms, exterior work under separate pa #201507302942.Details
interior renovation of 3 unit condo work includes replacing interior stairs with (n) elevator, renvoation of kitchens, bathrooms, bedrooms, additon of 3 bathrooms, exterior work under separate pa #201507302942. | $250,000 |
| Oct 13, 2015 | Completed final sign-off Nov 2015 | 1809 Jones St | replace in kind stair treads, risers, stringers due to damp rot on rear/garden stairs, replacement in kind, less than 50% of structure.Details
replace in kind stair treads, risers, stringers due to damp rot on rear/garden stairs, replacement in kind, less than 50% of structure. | $3,500 |
| Jul 30, 2015 | Completed final sign-off Jun 2019 | 900 Filbert St | window replacement , (n) windows on the north & west elevations. new roof deck w/6'-0" wind screens, & guardrail. new spiral stair accessing, new roof deck dedicated to top floor unit. new residential elevator overrun. sprinklers/elevator deferred.Details
window replacement , (n) windows on the north & west elevations. new roof deck w/6'-0" wind screens, & guardrail. new spiral stair accessing, new roof deck dedicated to top floor unit. new residential elevator overrun. sprinklers/elevator deferred. | $50,000 |
| Jul 2, 2015 | Completed final sign-off Sep 2015 | 1787 16th Av | replace 4'x4' landing for garden stairs & 10'x4' rear deck due to rot damage. replacement in-kind. less than 50%.Details
replace 4'x4' landing for garden stairs & 10'x4' rear deck due to rot damage. replacement in-kind. less than 50%. | $6,500 |
| Mar 20, 2015 | Completed final sign-off Oct 2017 | 1945 Eddy St | to comply with physical inspection report #cc-7309. legalize rear deck and stairs.Details
to comply with physical inspection report #cc-7309. legalize rear deck and stairs. | $8,500 |
| Aug 23, 2011 | Completed final sign-off Sep 2011 | 2885 Union St | replace wood rotten treads & risers on back stairway (exterior) replacement in-kind less than 50% of structure.Details
replace wood rotten treads & risers on back stairway (exterior) replacement in-kind less than 50% of structure. | $3,400 |
| Jun 23, 2006 | Completed final sign-off Jul 2006 | 200 Francisco St | dry rot replacements to framing members on rear decks and stairways, appros 20% to 30% of total deck replace with pressure treatred wood. to comply w/compliant #20565453Details
dry rot replacements to framing members on rear decks and stairways, appros 20% to 30% of total deck replace with pressure treatred wood. to comply w/compliant #20565453 | $6,200 |