Back to bathroom remodel contractors
Fay Construction & Restoration Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Jul 2026
- Last 24 months
- 4 permits filed
114 permits since 2000: 95 completed, 6 in progress, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
38 bathroom remodel permits: 30 completed, 3 in progress, 2 never finaled, 3 expired or cancelled. Typically 0 days from filing to permit and 224 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 2677 California St | interior remodel at kitchen and bathrooms: converting (e) bath and toilet rooms into 2 full baths, kitchen in new location (n) opening at kitchen wall, in kind windows replacements (not street visible) and new bath #3Details
interior remodel at kitchen and bathrooms: converting (e) bath and toilet rooms into 2 full baths, kitchen in new location (n) opening at kitchen wall, in kind windows replacements (not street visible) and new bath #3 | $240,000 |
| Jan 3, 2023 | In progress issued Dec 2023 | 130 Stanford Heights Av | convert 480sf of garage space to living space w/bedroom, bath & laundry, voluntary structural upgrades to framing & deckDetails
convert 480sf of garage space to living space w/bedroom, bath & laundry, voluntary structural upgrades to framing & deck | $75,000 |
| Dec 16, 2022 | In progress issued Jan 2025 | 1448 Plymouth Av | const n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass.Details
const n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass. | $100,000 |
| Apr 27, 2021 | Completed final sign-off Oct 2021 | 281 Berkeley Wy | bathroom remodel of ist floor office. replacement in kind of tile floors, tile walls, sheetrock (5/8") walls and ceiling and plumbing fixtures in existing locations. no structural alterations. no framing modification.Details
bathroom remodel of ist floor office. replacement in kind of tile floors, tile walls, sheetrock (5/8") walls and ceiling and plumbing fixtures in existing locations. no structural alterations. no framing modification. | $15,000 |
| Feb 16, 2021 | Never finaled issued Jun 2021, no final | 12 Stratford Dr | kitchen & master bathroom remodel. addition of bathroom at 1st floor with interior doorways altered pepr plan. remodel family room. add rear deck. termite & rot repair at 1st & 2nd floor at southwest corner & north wall.Details
kitchen & master bathroom remodel. addition of bathroom at 1st floor with interior doorways altered pepr plan. remodel family room. add rear deck. termite & rot repair at 1st & 2nd floor at southwest corner & north wall. | $185,000 |
| Aug 20, 2020 | Completed final sign-off Feb 2022 | 333 Twin Peaks Bl | remodel master bathroom(~9'x12'): removal & replace sheetrock, tile shower walls & floor, & fixtures. repair of 1st fl deck(~4'x18') & stairs and 2nd fl deck & frame(~7'x20') at rear: replace in kind of frame & deck boards.(<50% of structure). replace 6 wood windows (2nd fl) on rear. all in kind.Details
remodel master bathroom(~9'x12'): removal & replace sheetrock, tile shower walls & floor, & fixtures. repair of 1st fl deck(~4'x18') & stairs and 2nd fl deck & frame(~7'x20') at rear: replace in kind of frame & deck boards.(<50% of structure). replace 6 wood windows (2nd fl) on rear. all in kind. | $43,000 |
| Apr 17, 2019 | Expired or cancelled expired May 2022 | 846 Faxon Av | remodel 2 existing bathrooms, replacement in kindDetails
remodel 2 existing bathrooms, replacement in kind | $36,000 |
| Jan 22, 2019 | Completed final sign-off Jun 2021 | 199 Capistrano Av | interior remodel to (e) single family home - 1st fl - add bedroom, family room, play room & bath; 2nd fl - remodel (e) bath & add (n) bathDetails
interior remodel to (e) single family home - 1st fl - add bedroom, family room, play room & bath; 2nd fl - remodel (e) bath & add (n) bath | $400,000 |
| Aug 14, 2018 | Completed final sign-off Dec 2018 | 757 Panorama Dr | main floor bathroom remodel: replacement in kind with new tile floor and tub walls. new bathtub, toilet, vanity, sheetrock and paint. dimension approx 6'x12'-72 sq ft.Details
main floor bathroom remodel: replacement in kind with new tile floor and tub walls. new bathtub, toilet, vanity, sheetrock and paint. dimension approx 6'x12'-72 sq ft. | $19,500 |
| Jun 22, 2018 | Completed final sign-off Sep 2020 | 1012 Tennessee St | new master bedroom, bathroom, and laundry on 1st story. kitchen remodel on 2nd story. interior work only. all exterior work under separate permi. **n/a for maher** no exterior work approved - requires coaDetails
new master bedroom, bathroom, and laundry on 1st story. kitchen remodel on 2nd story. interior work only. all exterior work under separate permi. **n/a for maher** no exterior work approved - requires coa | $50,000 |
| Apr 4, 2017 | Completed final sign-off Jun 2017 | 1450 Franklin St | #804- remove bath tub and replace with shower pan, replace tile & underlaynet (replacement in kind).Details
#804- remove bath tub and replace with shower pan, replace tile & underlaynet (replacement in kind). | $6,000 |
| Mar 8, 2017 | Completed final sign-off Jun 2019 | 900 Filbert St | revision to 201510230636 to include one additional full bathroom. remove retail space at ground floor- no b occupancy to remain. move private roof deck out of rear yard setbackDetails
revision to 201510230636 to include one additional full bathroom. remove retail space at ground floor- no b occupancy to remain. move private roof deck out of rear yard setback | |
| Sep 12, 2016 | Completed final sign-off Feb 2017 | 999 Green St | unit #905: remodel bathroom - remove and replace sheetrock, tile, tub/shower, and vanity. replacement in kind.Details
unit #905: remodel bathroom - remove and replace sheetrock, tile, tub/shower, and vanity. replacement in kind. | $21,000 |
| Jul 19, 2016 | Completed final sign-off Mar 2018 | 373 Clipper St | interior renovation of 2nd floor living area with new hallway,powder room & laundry room, as well as renovation of (e)3rd flr bathroom.changes to rear facade include the removal of an (e)window,relocation of (e)exterior door, & new transom window.Details
interior renovation of 2nd floor living area with new hallway,powder room & laundry room, as well as renovation of (e)3rd flr bathroom.changes to rear facade include the removal of an (e)window,relocation of (e)exterior door, & new transom window. | $85,000 |
| Jun 9, 2016 | Completed final sign-off Jul 2017 | 541 Prentiss St | 1/f- relocate kitchen/dining to 1/f, new 1/2 bath/laundry/living room, revert interior stair, replace rear door, strengthen foundation/framing, new tankess water heater/furnace. 2/f- convert (e) kitchen/dining to bedroom/bath, dining to family room, revert (e) stair. new skylite, upgrade elec/plum/mDetails
1/f- relocate kitchen/dining to 1/f, new 1/2 bath/laundry/living room, revert interior stair, replace rear door, strengthen foundation/framing, new tankess water heater/furnace. 2/f- convert (e) kitchen/dining to bedroom/bath, dining to family room, revert (e) stair. new skylite, upgrade elec/plum/m | $150,000 |
| May 4, 2016 | Expired or cancelled cancelled Jul 2021 | 3852 21st St | remodel kitchen and bathrooms (2) replaced in kind.remove sheetrock throughoutDetails
remodel kitchen and bathrooms (2) replaced in kind.remove sheetrock throughout | $88,600 |
| Mar 10, 2016 | Completed final sign-off Jul 2017 | 541 Prentiss St | demolish exterior surfaces, kitchen and bathroom in prep for remodelDetails
demolish exterior surfaces, kitchen and bathroom in prep for remodel | $6,000 |
| Feb 17, 2016 | Completed final sign-off Jul 2016 | 150 Stanford Heights Av | remodel kitchen and 2 bathrooms with no alterations to walls. replace sheetrock, cabinets, and fixtures - same location.Details
remodel kitchen and 2 bathrooms with no alterations to walls. replace sheetrock, cabinets, and fixtures - same location. | $73,000 |
| Nov 25, 2015 | Completed final sign-off Jan 2016 | 229 Brannan St | partial remodel of master bath to include replacement of wall and floor tiles. replace vanity countertop. move light fixtures and add single outlet. replace guest bath tile flooring and replace vanity with and topDetails
partial remodel of master bath to include replacement of wall and floor tiles. replace vanity countertop. move light fixtures and add single outlet. replace guest bath tile flooring and replace vanity with and top | $13,500 |
| Oct 23, 2015 | Completed final sign-off Jun 2019 | 900 Filbert St | interior renovation of 3 unit condo work includes replacing interior stairs with (n) elevator, renvoation of kitchens, bathrooms, bedrooms, additon of 3 bathrooms, exterior work under separate pa #201507302942.Details
interior renovation of 3 unit condo work includes replacing interior stairs with (n) elevator, renvoation of kitchens, bathrooms, bedrooms, additon of 3 bathrooms, exterior work under separate pa #201507302942. | $250,000 |
| Feb 11, 2015 | Completed final sign-off Oct 2015 | 531 Clayton St | remodel main floor and pantry. remodel top florr rear west section with new master bedroom and bath. structural improvements to the top floor ceiling and roof and foundation per plansDetails
remodel main floor and pantry. remodel top florr rear west section with new master bedroom and bath. structural improvements to the top floor ceiling and roof and foundation per plans | $140,000 |
| May 30, 2014 | Completed final sign-off Jan 2015 | 507 47th Av | remodel (e) baths @ 1st & 2nd (total 2). kitchen remodel (n) rear deck, (n) skylights per plan. structural upgrade per plan.Details
remodel (e) baths @ 1st & 2nd (total 2). kitchen remodel (n) rear deck, (n) skylights per plan. structural upgrade per plan. | $45,000 |
| Apr 15, 2014 | Completed final sign-off Jan 2015 | 507 47th Av | remodel kitchen and 2 bathrooms with new sheetrock walls and ceilings (5/8 type x gyp. board), new lighting, cabinets and fixtures, install bath fans and range hood, replace window and sliding door in kitchen, max u factor 0.40.Details
remodel kitchen and 2 bathrooms with new sheetrock walls and ceilings (5/8 type x gyp. board), new lighting, cabinets and fixtures, install bath fans and range hood, replace window and sliding door in kitchen, max u factor 0.40. | $90,000 |
| Mar 11, 2014 | Completed final sign-off Jun 2014 | 200 Francisco St | remodel two bathrooms in unit #2: replace with new fixtures, sheetrock walls and ceilings inside bathrooms. no new wall and no existing wall relocation. all new sheet rock shall be 5/8" type x gyp board. lighting in bathroom remodelling shall comply with cec 150(k)10.Details
remodel two bathrooms in unit #2: replace with new fixtures, sheetrock walls and ceilings inside bathrooms. no new wall and no existing wall relocation. all new sheet rock shall be 5/8" type x gyp board. lighting in bathroom remodelling shall comply with cec 150(k)10. | $31,000 |
| Sep 23, 2013 | Completed final sign-off Nov 2014 | 1466 Page St | revision to appl #2012.10.18.2375- all work is at 3rd floor. remove non-bearing interior walls, cut (n) opening in (1) int. bearing wall, add (1) bath, (2) skylights & fireplace, replace sliding door w/french doors.Details
revision to appl #2012.10.18.2375- all work is at 3rd floor. remove non-bearing interior walls, cut (n) opening in (1) int. bearing wall, add (1) bath, (2) skylights & fireplace, replace sliding door w/french doors. | $38,000 |
| Aug 8, 2013 | Completed final sign-off Apr 2014 | 373 Clipper St | install new master bathroom, new closet(master). replace windows, siding and entry door on rear of house (south walls). in kind skylite replacement - max u-factor =0.40Details
install new master bathroom, new closet(master). replace windows, siding and entry door on rear of house (south walls). in kind skylite replacement - max u-factor =0.40 | $81,000 |
| Oct 18, 2012 | Completed final sign-off Nov 2014 | 1466 Page St | remodel kitchen, replace cabinetry install new appliances and countertops, re-sheetrock portions of walls, replace in kind, remodel bathroom, replace floors, sheetrock install new vanity and fixtures, replace in kind.Details
remodel kitchen, replace cabinetry install new appliances and countertops, re-sheetrock portions of walls, replace in kind, remodel bathroom, replace floors, sheetrock install new vanity and fixtures, replace in kind. | $46,000 |
| May 24, 2012 | Completed final sign-off Sep 2012 | 718 Shrader St | remodel (2) bathrooms. replacing walls and fixtures in kind. no structural alterations. (both baths are on the middle level of building). permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors.Details
remodel (2) bathrooms. replacing walls and fixtures in kind. no structural alterations. (both baths are on the middle level of building). permanently installed lights in bathroom shall be high efficacy unless they are controlled by manual on occupancy sensors. | $27,000 |
| Mar 1, 2012 | Completed final sign-off Jun 2012 | 45 Naples St | remodel one bathroom, re-tile floors and tub surround, replace sink, toilet, tub maintain existing locationsDetails
remodel one bathroom, re-tile floors and tub surround, replace sink, toilet, tub maintain existing locations | $23,000 |
| Dec 30, 2011 | Completed final sign-off Mar 2012 | 1934 Leavenworth St | remodel 1 bathroom. replace fixture, retile, lighting to comply with cec (150 k)Details
remodel 1 bathroom. replace fixture, retile, lighting to comply with cec (150 k) | $24,000 |
| Dec 16, 2010 | Completed final sign-off Mar 2011 | 3049 20th St | voluntary ada improvements to extg cafe to include: new power assist entry at front door and expansion and renovation of extg unisex bathroom. separate elect. & plmg permit to be applied for.Details
voluntary ada improvements to extg cafe to include: new power assist entry at front door and expansion and renovation of extg unisex bathroom. separate elect. & plmg permit to be applied for. | $12,000 |
| Apr 30, 2010 | Completed final sign-off Sep 2010 | 116 San Carlos St | units #1&3: remodel kitchen and bathroom, repl sheetrock, cabinets, flooring, and countertops in unit #1 and unit #3, comply with cec sec 150Details
units #1&3: remodel kitchen and bathroom, repl sheetrock, cabinets, flooring, and countertops in unit #1 and unit #3, comply with cec sec 150 | $31,000 |
| Nov 10, 2009 | Never finaled issued Nov 2009, no final | 1 Florence St | revision to pa# 2008.10.24.5034. move interior bearing and non bearing walls for kitchen and bathroom remodel. work on 1st floor above ground, unit#3Details
revision to pa# 2008.10.24.5034. move interior bearing and non bearing walls for kitchen and bathroom remodel. work on 1st floor above ground, unit#3 | $3,500 |
| Oct 24, 2008 | Completed final sign-off Nov 2009 | 1 Florence St | remodel kitchen with new cabinetsw (upper and lower), new countertops and appliances. remodel bathroom with new tile, cabinets, and fixtures.Details
remodel kitchen with new cabinetsw (upper and lower), new countertops and appliances. remodel bathroom with new tile, cabinets, and fixtures. | $70,000 |
| Jun 17, 2008 | Completed final sign-off Jul 2009 | 479 Noe St | remodel kitchen and adjoining bathroom on main level (2nd floor). install new cabinetry, counters, update plumbing, electrical and move interior wall. replace one window.Details
remodel kitchen and adjoining bathroom on main level (2nd floor). install new cabinetry, counters, update plumbing, electrical and move interior wall. replace one window. | $100,000 |
| Apr 13, 2006 | Completed final sign-off Oct 2008 | 800 Miramar Av | convert basement stroage area into living space consisting of 2 bdrms and 2 bathrooms/partial foundation replacement and or retrofit and excavation to create headroomDetails
convert basement stroage area into living space consisting of 2 bdrms and 2 bathrooms/partial foundation replacement and or retrofit and excavation to create headroom | $80,000 |
| Feb 28, 2006 | Completed final sign-off Jun 2006 | 281 Berkeley Wy | retile master bathroom, make alteration to shower/interior wall, install new cabinets. tile and cabinet replacemento for 2 other bathrooms, 1 3rd floor and 1 2nd floor half bath. no structural changes to these bathroomsDetails
retile master bathroom, make alteration to shower/interior wall, install new cabinets. tile and cabinet replacemento for 2 other bathrooms, 1 3rd floor and 1 2nd floor half bath. no structural changes to these bathrooms | $22,000 |
| Aug 11, 2004 | Expired or cancelled expired Dec 2006 | 264 Liberty St | replace bathroom window (30"x48") with new single lung 45 min fire rated window measering 30" wideDetails
replace bathroom window (30"x48") with new single lung 45 min fire rated window measering 30" wide | $1,200 |