Back to kitchen remodel contractors
Fay Construction & Restoration Inc
- Based in
- San Francisco
- On San Francisco permits
- Jun 2004 to Jul 2026
- Last 24 months
- 4 permits filed
114 permits since 2000: 95 completed, 6 in progress, 8 never finaled, 5 expired or cancelled.
Of the 8 never-finaled permits, 3 are 5 to 10 years old, 5 are over 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
26 kitchen remodel permits: 20 completed, 3 in progress, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 236 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Jul 27, 2026 | In progress issued Jul 2026 | 2677 California St | interior remodel at kitchen and bathrooms: converting (e) bath and toilet rooms into 2 full baths, kitchen in new location (n) opening at kitchen wall, in kind windows replacements (not street visible) and new bath #3Details
interior remodel at kitchen and bathrooms: converting (e) bath and toilet rooms into 2 full baths, kitchen in new location (n) opening at kitchen wall, in kind windows replacements (not street visible) and new bath #3 | $240,000 |
| May 12, 2026 | In progress issued May 2026 | 425 Pacheco St | replacement in kind of (2) windows in front of house, street facing alum clad wood, (2) patio doors in rear. termite and rot damage replacement in front of house @ se corner and under front stairs, and in rear of building along w wall. replace sheetrock in kitchen ceiling & main level bedroom.Details
replacement in kind of (2) windows in front of house, street facing alum clad wood, (2) patio doors in rear. termite and rot damage replacement in front of house @ se corner and under front stairs, and in rear of building along w wall. replace sheetrock in kitchen ceiling & main level bedroom. | $18,000 |
| Dec 16, 2022 | In progress issued Jan 2025 | 1448 Plymouth Av | const n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass.Details
const n) footings @ 1st/f build a habitable rm on the open area under the 2nd fl office, plus a bedroom, bathroom & a stair up to the 2nd fl; @ the 2nd fl demo hall closet & bathroom & build 2 new bathrooms & a closet & remodel the kitchen. replace all windows w/ identical windows & insulated glass. | $100,000 |
| Feb 16, 2021 | Never finaled issued Jun 2021, no final | 12 Stratford Dr | kitchen & master bathroom remodel. addition of bathroom at 1st floor with interior doorways altered pepr plan. remodel family room. add rear deck. termite & rot repair at 1st & 2nd floor at southwest corner & north wall.Details
kitchen & master bathroom remodel. addition of bathroom at 1st floor with interior doorways altered pepr plan. remodel family room. add rear deck. termite & rot repair at 1st & 2nd floor at southwest corner & north wall. | $185,000 |
| Jun 22, 2018 | Completed final sign-off Sep 2020 | 1012 Tennessee St | new master bedroom, bathroom, and laundry on 1st story. kitchen remodel on 2nd story. interior work only. all exterior work under separate permi. **n/a for maher** no exterior work approved - requires coaDetails
new master bedroom, bathroom, and laundry on 1st story. kitchen remodel on 2nd story. interior work only. all exterior work under separate permi. **n/a for maher** no exterior work approved - requires coa | $50,000 |
| Jul 19, 2017 | Completed final sign-off Sep 2018 | 573 Haight St | renovation of top fl (3rd fl) unit kitchen, including removing existing chimney & closet, infill (e) floor & roof to match (e). reinstall exhaust ducting. work is on the rear of property.Details
renovation of top fl (3rd fl) unit kitchen, including removing existing chimney & closet, infill (e) floor & roof to match (e). reinstall exhaust ducting. work is on the rear of property. | $15,000 |
| Mar 28, 2017 | Completed final sign-off Dec 2017 | 281 Berkeley Wy | remodel kitchen - replacement in kind for kitchen cabinets. no structural alterations. replace sheetrock (5/8") on ceilings and walls where remodel.Details
remodel kitchen - replacement in kind for kitchen cabinets. no structural alterations. replace sheetrock (5/8") on ceilings and walls where remodel. | $24,000 |
| Jun 9, 2016 | Completed final sign-off Jul 2017 | 541 Prentiss St | 1/f- relocate kitchen/dining to 1/f, new 1/2 bath/laundry/living room, revert interior stair, replace rear door, strengthen foundation/framing, new tankess water heater/furnace. 2/f- convert (e) kitchen/dining to bedroom/bath, dining to family room, revert (e) stair. new skylite, upgrade elec/plum/mDetails
1/f- relocate kitchen/dining to 1/f, new 1/2 bath/laundry/living room, revert interior stair, replace rear door, strengthen foundation/framing, new tankess water heater/furnace. 2/f- convert (e) kitchen/dining to bedroom/bath, dining to family room, revert (e) stair. new skylite, upgrade elec/plum/m | $150,000 |
| May 4, 2016 | Expired or cancelled cancelled Jul 2021 | 3852 21st St | remodel kitchen and bathrooms (2) replaced in kind.remove sheetrock throughoutDetails
remodel kitchen and bathrooms (2) replaced in kind.remove sheetrock throughout | $88,600 |
| Mar 10, 2016 | Completed final sign-off Jul 2017 | 541 Prentiss St | demolish exterior surfaces, kitchen and bathroom in prep for remodelDetails
demolish exterior surfaces, kitchen and bathroom in prep for remodel | $6,000 |
| Mar 2, 2016 | Completed final sign-off Apr 2019 | 379 Flood Av | horiz. 2 story addition into rear yard (does not encroach on rear yard set back); kitchen remodel; relocation of 3rd bedroom to 2nd floor at rear; electrical, mechanical, plumbing and structural work includedDetails
horiz. 2 story addition into rear yard (does not encroach on rear yard set back); kitchen remodel; relocation of 3rd bedroom to 2nd floor at rear; electrical, mechanical, plumbing and structural work included | $310,000 |
| Feb 17, 2016 | Completed final sign-off Jul 2016 | 150 Stanford Heights Av | remodel kitchen and 2 bathrooms with no alterations to walls. replace sheetrock, cabinets, and fixtures - same location.Details
remodel kitchen and 2 bathrooms with no alterations to walls. replace sheetrock, cabinets, and fixtures - same location. | $73,000 |
| Oct 23, 2015 | Completed final sign-off Jun 2019 | 900 Filbert St | interior renovation of 3 unit condo work includes replacing interior stairs with (n) elevator, renvoation of kitchens, bathrooms, bedrooms, additon of 3 bathrooms, exterior work under separate pa #201507302942.Details
interior renovation of 3 unit condo work includes replacing interior stairs with (n) elevator, renvoation of kitchens, bathrooms, bedrooms, additon of 3 bathrooms, exterior work under separate pa #201507302942. | $250,000 |
| Jul 17, 2015 | Completed final sign-off Aug 2015 | 542 23rd Av | replace patio door (sides) and kitchen window, not visible from street. same size and same location max u factor 0.32Details
replace patio door (sides) and kitchen window, not visible from street. same size and same location max u factor 0.32 | $4,800 |
| May 30, 2014 | Completed final sign-off Jan 2015 | 507 47th Av | remodel (e) baths @ 1st & 2nd (total 2). kitchen remodel (n) rear deck, (n) skylights per plan. structural upgrade per plan.Details
remodel (e) baths @ 1st & 2nd (total 2). kitchen remodel (n) rear deck, (n) skylights per plan. structural upgrade per plan. | $45,000 |
| Apr 15, 2014 | Completed final sign-off Jan 2015 | 507 47th Av | remodel kitchen and 2 bathrooms with new sheetrock walls and ceilings (5/8 type x gyp. board), new lighting, cabinets and fixtures, install bath fans and range hood, replace window and sliding door in kitchen, max u factor 0.40.Details
remodel kitchen and 2 bathrooms with new sheetrock walls and ceilings (5/8 type x gyp. board), new lighting, cabinets and fixtures, install bath fans and range hood, replace window and sliding door in kitchen, max u factor 0.40. | $90,000 |
| Oct 18, 2012 | Completed final sign-off Nov 2014 | 1466 Page St | remodel kitchen, replace cabinetry install new appliances and countertops, re-sheetrock portions of walls, replace in kind, remodel bathroom, replace floors, sheetrock install new vanity and fixtures, replace in kind.Details
remodel kitchen, replace cabinetry install new appliances and countertops, re-sheetrock portions of walls, replace in kind, remodel bathroom, replace floors, sheetrock install new vanity and fixtures, replace in kind. | $46,000 |
| Apr 30, 2010 | Completed final sign-off Sep 2010 | 116 San Carlos St | units #1&3: remodel kitchen and bathroom, repl sheetrock, cabinets, flooring, and countertops in unit #1 and unit #3, comply with cec sec 150Details
units #1&3: remodel kitchen and bathroom, repl sheetrock, cabinets, flooring, and countertops in unit #1 and unit #3, comply with cec sec 150 | $31,000 |
| Mar 18, 2010 | Completed final sign-off Jun 2010 | 20 Montezuma St | #b: kitchen remodel- replace cabinety, counter tops, and appliances, repl sheetrock walls, 2/5/8" gyp bd type x, area 200 ft 2 max; not structual work, no new lighting and ventilation systemDetails
#b: kitchen remodel- replace cabinety, counter tops, and appliances, repl sheetrock walls, 2/5/8" gyp bd type x, area 200 ft 2 max; not structual work, no new lighting and ventilation system | $16,000 |
| Nov 10, 2009 | Never finaled issued Nov 2009, no final | 1 Florence St | revision to pa# 2008.10.24.5034. move interior bearing and non bearing walls for kitchen and bathroom remodel. work on 1st floor above ground, unit#3Details
revision to pa# 2008.10.24.5034. move interior bearing and non bearing walls for kitchen and bathroom remodel. work on 1st floor above ground, unit#3 | $3,500 |
| Jul 7, 2009 | Completed final sign-off Nov 2009 | 349 31st Av | remove and replace kitchen ceiling (5/8") sheetrock. approx 12 x12. electric under separate permit. min 50% kitchen lighting wattage must be high efficiency lightingDetails
remove and replace kitchen ceiling (5/8") sheetrock. approx 12 x12. electric under separate permit. min 50% kitchen lighting wattage must be high efficiency lighting | $1,200 |
| Jun 12, 2009 | Completed final sign-off Dec 2009 | 1257 Dolores St | remodel kitchen -replace kitchen cabinetry, sheetrock, & countertops, relocate kitchen doorway.Details
remodel kitchen -replace kitchen cabinetry, sheetrock, & countertops, relocate kitchen doorway. | $29,000 |
| Mar 4, 2009 | Completed final sign-off Jul 2009 | 7 Saturn St | replace two kitchen windows.replace wood siding at rear.new paper and paint.Details
replace two kitchen windows.replace wood siding at rear.new paper and paint. | $7,500 |
| Oct 24, 2008 | Completed final sign-off Nov 2009 | 1 Florence St | remodel kitchen with new cabinetsw (upper and lower), new countertops and appliances. remodel bathroom with new tile, cabinets, and fixtures.Details
remodel kitchen with new cabinetsw (upper and lower), new countertops and appliances. remodel bathroom with new tile, cabinets, and fixtures. | $70,000 |
| Jun 17, 2008 | Completed final sign-off Jul 2009 | 479 Noe St | remodel kitchen and adjoining bathroom on main level (2nd floor). install new cabinetry, counters, update plumbing, electrical and move interior wall. replace one window.Details
remodel kitchen and adjoining bathroom on main level (2nd floor). install new cabinetry, counters, update plumbing, electrical and move interior wall. replace one window. | $100,000 |
| Oct 22, 2004 | Completed final sign-off Feb 2005 | 2454 24th Av | kitchen remodel- replace cabs & flooring, update kitchen, electrical, (in kind replacement only)Details
kitchen remodel- replace cabs & flooring, update kitchen, electrical, (in kind replacement only) | $25,000 |