Back to kitchen remodel contractors
Faragon Restoration Ltd
- Based in
- San Francisco
- On San Francisco permits
- Dec 2016 to Oct 2025
- Last 24 months
- 2 permits filed
59 permits since 2000: 49 completed, 1 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Kitchen remodel permits
9 kitchen remodel permits: 6 completed, 2 never finaled, 1 expired or cancelled. Typically 0 days from filing to permit and 238 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Apr 10, 2024 | Completed final sign-off Aug 2024 | 491 31st Av | to comply with nov# 202317523 & 202420766. #312: patch and repair finishes in bath; #412: repair base cabinet, patch and repair finishes in kitchen and bath.Details
to comply with nov# 202317523 & 202420766. #312: patch and repair finishes in bath; #412: repair base cabinet, patch and repair finishes in kitchen and bath. | $10,000 |
| Aug 11, 2020 | Completed final sign-off Jan 2025 | 88 King St | unit # 702: replacing kitchen cabinets and counter tops. kitchen ~120 sqft. replace carpet in bedrooms and hardwood floor in kitchen and living room/dining room. all work in kind.Details
unit # 702: replacing kitchen cabinets and counter tops. kitchen ~120 sqft. replace carpet in bedrooms and hardwood floor in kitchen and living room/dining room. all work in kind. | $45,000 |
| Aug 20, 2019 | Completed final sign-off Sep 2019 | 430 Turk St | apt 710: sheetrock, insulation, cabinets replacement in studio apt. repair finishs in-ikind. also remodel kitchen.Details
apt 710: sheetrock, insulation, cabinets replacement in studio apt. repair finishs in-ikind. also remodel kitchen. | $44,000 |
| Apr 18, 2019 | Never finaled issued Apr 2019, no final | 6324 Geary Bl | repair a kitchens after water damage. replacing insulation, sheetrock, kitchen cabinets & flooring. updating electrical outlets & changing flourescent lights to leds. 2nd & 3rd fl.Details
repair a kitchens after water damage. replacing insulation, sheetrock, kitchen cabinets & flooring. updating electrical outlets & changing flourescent lights to leds. 2nd & 3rd fl. | $87,694 |
| Feb 21, 2019 | Completed final sign-off Apr 2019 | 1251 Turk St | sheetrock flooring, cabinets-kitchen, painting, changing outlets.Details
sheetrock flooring, cabinets-kitchen, painting, changing outlets. | $40,707 |
| May 22, 2018 | Never finaled issued May 2018, no final | 5000 Diamond Heights Bl | demoliton of kitchen cabinets & existing flooring. replace flooring. insulation sheetrock & painting, new tile.Details
demoliton of kitchen cabinets & existing flooring. replace flooring. insulation sheetrock & painting, new tile. | $18,000 |
| Mar 19, 2018 | Expired or cancelled cancelled Dec 2018 | 2121 Geary Bl | vif 1103.7.6.1. restore to last legal condition, maintain rated assemly, replace stair handrail. ti to the kitchen & bathroom, electrical, plumbing, lath & plaster, sheetrock, paint, insulation, flooring. due to fire damage. unit #6-108.Details
vif 1103.7.6.1. restore to last legal condition, maintain rated assemly, replace stair handrail. ti to the kitchen & bathroom, electrical, plumbing, lath & plaster, sheetrock, paint, insulation, flooring. due to fire damage. unit #6-108. | $169,000 |
| Jul 5, 2017 | Completed final sign-off Aug 2018 | 1180 04th St | replace of sheetrock, drywall, insulation, kitchen cabinets, light covers, painting, floor covering in 3 unit (413, 312, 210).Details
replace of sheetrock, drywall, insulation, kitchen cabinets, light covers, painting, floor covering in 3 unit (413, 312, 210). | $59,920 |
| Mar 15, 2017 | Completed final sign-off Mar 2018 | 333 01st St | install hardwood and stone floor. install kitchen cabinets, painting/drywall, plumbing.Details
install hardwood and stone floor. install kitchen cabinets, painting/drywall, plumbing. | $48,000 |