Back to bathroom remodel contractors
Faragon Restoration Ltd
- Based in
- San Francisco
- On San Francisco permits
- Dec 2016 to Oct 2025
- Last 24 months
- 2 permits filed
59 permits since 2000: 49 completed, 1 in progress, 7 never finaled, 2 expired or cancelled.
Of the 7 never-finaled permits, 1 is 3 to 5 years old, 6 are 5 to 10 years old.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for bathroom remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor.
Bathroom remodel permits
11 bathroom remodel permits: 9 completed, 2 expired or cancelled. Typically 0 days from filing to permit and 47 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Oct 9, 2025 | Completed final sign-off Apr 2026 | 3981 Alemany Bl | drywall repairs - bathroom, shower tile & shower pan - bathroom, all interior work inside condo. all accessible features remain.Details
drywall repairs - bathroom, shower tile & shower pan - bathroom, all interior work inside condo. all accessible features remain. | $18,782 |
| Apr 10, 2024 | Completed final sign-off Aug 2024 | 491 31st Av | to comply with nov# 202317523 & 202420766. #312: patch and repair finishes in bath; #412: repair base cabinet, patch and repair finishes in kitchen and bath.Details
to comply with nov# 202317523 & 202420766. #312: patch and repair finishes in bath; #412: repair base cabinet, patch and repair finishes in kitchen and bath. | $10,000 |
| Mar 28, 2024 | Completed final sign-off Jun 2024 | 40 Cashmere St | unit 1-a: replace finishes of bathroom walls and ceiling r/r toilet and vanity rebuild each batroom like for like (both units) unit 2-a: replace finishes of walk in shower partial wall removal and replacement to comply with nov #202310663Details
unit 1-a: replace finishes of bathroom walls and ceiling r/r toilet and vanity rebuild each batroom like for like (both units) unit 2-a: replace finishes of walk in shower partial wall removal and replacement to comply with nov #202310663 | $32,000 |
| Nov 14, 2023 | Completed final sign-off Nov 2023 | 130 Cashmere St | unit d: n.o.v. #202315827. bathroom ceiling dryall repair. 5/8" type xDetails
unit d: n.o.v. #202315827. bathroom ceiling dryall repair. 5/8" type x | $4,000 |
| Sep 21, 2022 | Expired or cancelled cancelled Oct 2022 | 1300 22nd St | drywall repairs in bathroom ceiling light fan. install in bathroom ceiling -remove and replace motion sensor - switch installDetails
drywall repairs in bathroom ceiling light fan. install in bathroom ceiling -remove and replace motion sensor - switch install | $962 |
| Sep 21, 2022 | Completed final sign-off Nov 2022 | 1300 22nd St | drywall repairs in bathroom ceiling light fan. install in bathroom ceiling -remove and replace motion sensor - switch installDetails
drywall repairs in bathroom ceiling light fan. install in bathroom ceiling -remove and replace motion sensor - switch install | $962 |
| Sep 21, 2022 | Completed final sign-off Nov 2022 | 1300 22nd St | drywall repairs in bathroom ceiling light fan. install in bathroom ceiling -remove and replace motion sensor - switch installDetails
drywall repairs in bathroom ceiling light fan. install in bathroom ceiling -remove and replace motion sensor - switch install | $962 |
| Apr 10, 2018 | Completed final sign-off Aug 2018 | 645 Haight St | bath remodel. dry rot repair in-kind. painting. n/a for maher.Details
bath remodel. dry rot repair in-kind. painting. n/a for maher. | $12,000 |
| Mar 19, 2018 | Expired or cancelled cancelled Dec 2018 | 2121 Geary Bl | vif 1103.7.6.1. restore to last legal condition, maintain rated assemly, replace stair handrail. ti to the kitchen & bathroom, electrical, plumbing, lath & plaster, sheetrock, paint, insulation, flooring. due to fire damage. unit #6-108.Details
vif 1103.7.6.1. restore to last legal condition, maintain rated assemly, replace stair handrail. ti to the kitchen & bathroom, electrical, plumbing, lath & plaster, sheetrock, paint, insulation, flooring. due to fire damage. unit #6-108. | $169,000 |
| Mar 12, 2018 | Completed final sign-off Apr 2018 | 260 King St | repair/patch/texture & paint ceilings/walls in bathroom/hallway, repair tile flooring in bathroom to comply with nov #201839831 dated 2/14/2018.Details
repair/patch/texture & paint ceilings/walls in bathroom/hallway, repair tile flooring in bathroom to comply with nov #201839831 dated 2/14/2018. | $9,828 |
| May 8, 2017 | Completed final sign-off Jun 2017 | 420 Berry St | drywall repairs - insulation and painting; install doors - cabinets; bathroom fixtures - toilet/sink etc; hooks up stove;vct tile floor; n/a maherDetails
drywall repairs - insulation and painting; install doors - cabinets; bathroom fixtures - toilet/sink etc; hooks up stove;vct tile floor; n/a maher | $51,000 |