Back to kitchen remodel contractors
Fahey Building/Remodeling
- Based in
- San Francisco
- On San Francisco permits
- Jun 2002 to Mar 2014
- Last 24 months
- 0 permits filed
50 permits since 2000: 33 completed, 5 never finaled, 12 expired or cancelled.
Of the 5 never-finaled permits, 5 are over 10 years old. 1 was filed but never issued.
This is the city’s permit record, not a license check. It does not show whether the state license is active, bonded or insured. How to read these records
Permits filed each year
How long permits take
Each point is the quarter the permits were filed, for kitchen remodel across San Francisco. A median counts only permits that have finished, so the shaded recent quarters look faster than they will end up: their slow permits have not finished yet. Hover a point for the slowest 10%. Gaps mean fewer than 5 permits. A rise in the issue line is the city’s review backlog, not the contractor. Too few of this contractor’s permits have finished to plot them.
Kitchen remodel permits
6 kitchen remodel permits: 3 completed, 1 never finaled, 2 expired or cancelled. Typically 0 days from filing to permit and 354 days from permit to final inspection.
| Filed | Outcome | Address | Work described on the permit | Declared cost |
|---|---|---|---|---|
| Feb 8, 2013 | Completed final sign-off Feb 2014 | 2417 Cabrillo St | remodel kitchen, remove wall and door. infill door openings. proivde new opening from kitchen into hallway, install new electrical, install new sink. install new cabinets and counter tops. remodel bathroom: remove stall shower, provide new toilet, provide new shower head and valve over (e) bathDetails
remodel kitchen, remove wall and door. infill door openings. proivde new opening from kitchen into hallway, install new electrical, install new sink. install new cabinets and counter tops. remodel bathroom: remove stall shower, provide new toilet, provide new shower head and valve over (e) bath | $17,000 |
| May 27, 2010 | Never finaled issued Nov 2010, no final | 222 10th Av | includes the interior remodel of the kitchen on the second floor. also, remodel of (e) third floor bathroom including a new roof over this bathroom.Details
includes the interior remodel of the kitchen on the second floor. also, remodel of (e) third floor bathroom including a new roof over this bathroom. | $200,000 |
| Jun 30, 2009 | Completed final sign-off Oct 2012 | 231 10th Av | demo (e)2/fl bathrm&adjacent interior partitions.open(n) pass-through in 2/fl kitchen.replace (e)ridge beam in roof. remove (e) wall between (e) 2/fl study & living rm.reconfigure fenestration on 2/fl of rear facade. change (e) wood burning fireplace w/ (n) gas fireplace. bid 200905303.Details
demo (e)2/fl bathrm&adjacent interior partitions.open(n) pass-through in 2/fl kitchen.replace (e)ridge beam in roof. remove (e) wall between (e) 2/fl study & living rm.reconfigure fenestration on 2/fl of rear facade. change (e) wood burning fireplace w/ (n) gas fireplace. bid 200905303. | $21,000 |
| Jan 5, 2009 | Completed final sign-off May 2009 | 37 Elk St | tear out (e) wall, ceiling finishes in kitchen & bathrm. install new 7 gfi outlest, 1 designated circuit for microwave, insulate, install new drywall, tile in bathrm. (upgrade all fixtures in current locations)Details
tear out (e) wall, ceiling finishes in kitchen & bathrm. install new 7 gfi outlest, 1 designated circuit for microwave, insulate, install new drywall, tile in bathrm. (upgrade all fixtures in current locations) | $35,000 |
| Jul 1, 2004 | Expired or cancelled cancelled Jan 2007 | 3901 Clement St | remodel kitchen and bathroomn new cavinets, appliances, can lights in ceiling and new flooringDetails
remodel kitchen and bathroomn new cavinets, appliances, can lights in ceiling and new flooring | $30,000 |
| Nov 6, 2003 | Expired or cancelled expired Mar 2010 | 1255 34th Av | remodel kitchen,bath-toilet,tubdrywall,door to patio.tile.update wiring.Details
remodel kitchen,bath-toilet,tubdrywall,door to patio.tile.update wiring. | $19,000 |